Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.8 CrAdmitted-Finance 201 202 A WING RAMESHRAMJIV BLDG BHAUSAHEB PALGHAR DANDEKAR MARG DIST PALGHAR 401 404 | PALGHAR | PALGHAR | MAHARASHTRA | 401404 | ₹1.8 Cr | L1 | Admitted-Finance |
| 2 | L2₹2.0 CrAdmitted-Finance | ₹2.0 Cr | L2 | Admitted-Finance |
| 3 | L3₹2.3 CrAdmitted-Finance | ₹2.3 Cr | L3 | Admitted-Finance |
| 4 | L4₹2.3 CrAdmitted-Finance 43 TRIDEEP BUNGLOW MIDDLE CLASS HSG SOC NEXT TO ARYAN SCHOOL GROUND PALGHAR MAHARASHTRA | PALGHAR | PALGHAR | MAHARASHTRA | 401404 | ₹2.3 Cr | L4 | Admitted-Finance |
| 5 | Rejected-Technical | - | - | Rejected-Technical EMD not submited |
| Sl No | Description | Qty | Unit | M/s.Bhushan J Pawade L3 | STERLING ENGINEERING AND CONSTRUCTIONS LLP L1 | M/S DATTATRAY CONSTRUCTION L2 | DIPAK S PIMPLE ENGINEERS AND CONTRACTORS L4 |
|---|---|---|---|---|---|---|---|
| 1.00 | Dismantling of RCC works carefully manually without damaging adjacent structures excluding cutting of reinforcement including stacking of steel reinforcement bars and disposal of unserviceable materials within 200 m lead as per direction of Engineer-in-charge | 5 | Cu.m | 3,000 ₹15,000 | 1,298 ₹6,490 | 2,500 ₹12,500 | 1,500 ₹7,500 |
| 2.00Dismantling roofing including ridges, valleys and gutter etc and stacking the material within 50 m lead | |||||||
| 2.10 | G.S Sheet / FRP Sheet / AC Sheet | 250 | Sq.m | 70 ₹17,500 | 65 ₹16,250 | 100 ₹25,000 | 50 ₹12,500 |
| 3.00 | Dismantling steel work in built up sections in angles, tees, flats and channels including all gusset plates, bolts, nuts, cutting rivets, welding etc. including dismantling and stacking within 100 m lead | 2 | MT | 19,000 ₹38,000 | 6,500 ₹13,000 | 11,000 ₹22,000 | 35,000 ₹70,000 |
| 4.00 | Earth work excavation by mechanical means (Hydraulic excavator) / manual means in all types of soil other than soft and hard rock, dressing the sides of foundation, ramming of bottom etc. including shoring and dewatering (if necessary) and refilling with selected excavated earth in layers of not more than 500 mm thick, each layer well rammed and consolidated including disposing the surplus earth within a distance of 200 m all as per specifications including clearing Jungle, uprooting of vegetation, grass, etc. complete and as directed by the Engineer-in-charge.From 0.00 to 1.50 m depth from average ground level | 130 | Cu.m | 210 ₹27,300 | 165.2 ₹21,476 | 175 ₹22,750 | 150 ₹19,500 |
| 5.00 | Labour charges for murum filling under floors of specified thickness in layers of not exceeding 150 mm thickness including consolidation etc. complete (using murrum available at BARC campus with a lead of up to 4 Km) | 61 | Cu.m | 170 ₹10,370 | 236 ₹14,396 | 375 ₹22,875 | 200 ₹12,200 |
| 6.00Supplying, stacking and laying of 230 mm thick rubble soling stones as under floor base including packing with smaller stone and compacting, ramming including spreading and consolidation of blinding material, moorum etc. complete all as per specifications and as directed by the Engineer-in-charge | |||||||
| 6.10 | 230mm With outside material | 204 | Sq.m | 510 ₹1.0 L | 501.5 ₹1.0 L | 675 ₹1.4 L | 550 ₹1.1 L |
| 7.00 | Providing and fixing double tubular scaffolding system using H- frames with cup lock type on the exterior side up to seven story height made with 40 mm dia M.S. tube 1.5 m centre to centre horizontal and vertical tubes joining with cup and lock system with M.S. tubes, M.S. tube challies, M.S clamps and M.S staircase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for the required duration as approved and removing it thereafter. The scaffolding system shall be stiffened with bracings, runners, connection with building etc. wherever required for inspection of work at required locations with essential safety features for the workmen etc. complete as per directions and as approved by the Engineer -in - charge. The elevational area of the scaffolding shall be measured for payment purposes. The payment shall be made once irrespective of duration of scaffolding | 300 | Sq.m | 610 ₹1.8 L | 118 ₹35,400 | 255 ₹76,500 | 500 ₹1.5 L |
| 8.00 | Providing and laying in position cement concrete of 1:3:6 (1 cement, 3 crushed sand, 6 graded stone aggregate of maximum size 20 mm) including consolidation, finishing, curing etc. complete as per specificationsand drawings but excluding the cost of Form work shuttering,centering Complete at all levels | 47 | Cu.m | 5,300 ₹2.5 L | 5,616.8 ₹2.6 L | 5,950 ₹2.8 L | 6,200 ₹2.9 L |
Tender Value
₹2.5 Cr
EMD Value
₹4.9 L
Closing Date
19 Nov 2025, 3:00 pmClosed
Director,GSO
NRB Tarapur
Construction of new sheds at various locations of RWM at NRB BARC Tarapur
2025_NRB_884377_1
BARCT/NRB/INRPO/TWMP/66/2025
Open Tender
Civil Works
365 days
BARC Tarapur
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹4.9 L
20 May 2026
8 Nov 2025
21 Nov 2025
8 Nov 2025
19 Nov 2025
14 Nov 2025
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.32 MB
BOQ_929547.xls
BOQ • 0.26 MB
Technicalbid.xls
Additional Documents • 0.08 MB
Download all tender documents and submit your bid