Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹37.1 LAdmitted-Finance VEERPUR KHAJUHA FATEHPUR FATEHPUR UTTAR PRADESH 212657 | FATEHPUR | UTTAR PRADESH | 212657 | L1 | Admitted-Finance | ||
| 2 | L2₹37.7 L+₹53,135.56 (1.43%)Admitted-Finance | L2 | Admitted-Finance |
Tender Value
₹38.0 L
EMD Value
₹3.8 L
Closing Date
28 May 2026, 5:00 pmClosed
Executive Engineer Minor Irrigation Div- Prayagraj
Executive Engineer Minor Irrigation Div- Prayagraj
Digging and rennovation of Chaukadi Pond village-Baraisa,Block-Manjhanpur, Distt-Kaushambi
2026_UPMID_1147239_4
132/M.I./AC./NIVIDA SUCHNA/2026-27 DATE 02-05-2026
Open Tender
Civil Works
Percentage
60 days
as per Work/Item Description
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,800
Executive Engineer Minor Irrigation Division
₹3.8 L
Yes
14 Oct 2026
13 May 2026
29 May 2026
15 May 2026
28 May 2026
15 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation in ordinary soil by poclain machine & shifting of excavated soil with tractor trolly | 32,957.62 | Cum | 75 | ₹24,71,821.5 |
| 2 | Earth work in excavation in ordinary soil by manual labour & shifting of excavated soil with tractor trolly | 8,239.41 | Cum | 91 | ₹7,49,786.31 |
| 3 | Dewatering work by 10 H.P. Diesel Pumping set with P.O.L. & operator etc. | 460 | Hrs. | 190 | ₹87,400 |
| 4 | Earth work in excavation in ordinary soil for foundations of inlet, outlet & ramp etc. | 111.03 | Cum | 100 | ₹11,103 |
| 5 | C.C. work in (1:3:6) cement, Sand & 20-40 mm Brick Ballast mortar for foundations I/c cost of materials labour etc. | 16.42 | Cum | 4,556.3 | ₹74,814.45 |
| 6 | Brick Masonary work in (1:4) cement & coarse sand mortar I/c cost of materials labour etc. | 33.46 | Cum | 5,943.46 | ₹1,98,868.17 |
| 7 | Supply & Laying of 900 mm NP3 hume pipe with collar i/c all. | 30 | Rm | 5,746 | ₹1,72,380 |
| 8 | P.C.C. work in (1:2:4) Cement, Coarse sand & 10 to 20 mm Stone Grite I/c cost of materials & labour etc. | 1.18 | Cum | 7,212.06 | ₹8,510.23 |
| 9 | Struck pointing work in (1:2) cement & coarse sand mortar I/c cost of materials & labour etc. | 82.19 | Sqm | 132.58 | ₹10,896.75 |
| 10 | Dry stone boulder filing in outlet unit I/c cost of material & labour etc. | 0.88 | Cum | 2,407 | ₹2,118.16 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.90 MB
BOQ_2146061.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .