| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.2 LAccepted-AOC 8 6B P K ROY CHOWDHURY 1ST BYE LANE HOWRAH 711103 | HOWRAH | HOWRAH | WEST BENGAL | 711103 | L1 | Accepted-AOC Successful Bidder | |
| 2 | L2₹3.2 L+₹223.88 (0.07%)Rejected-Finance | L2 | Rejected-Finance Bidder is not L1 | |
| 3 | L3₹3.2 L+₹319.82 (0.10%)Rejected-Finance 26 RAMKRISHNA PALLY DAKSHIN BAKSHARA HOWRAH 711 109 | HOWRAH | WEST BENGAL | 711109 | L3 | Rejected-Finance Bidder is not L1 | |
| 4 | Rejected-Technical 81 7A RAJA S C MALLICK ROAD KOLKATA 700047 | KOLKATA | KOLKATA | WEST BENGAL | 700047 | - | Rejected-Technical Documents not submitted as per NIT | |
| 5 | Rejected-Technical | - | Rejected-Technical Documents not submitted as per NIT |
Tender Value
₹3.2 L
EMD Value
₹6,397
Closing Date
24 Aug 2026, 12:00 pmClosed
AE,KWSD-I,PWD
N.S.Building
Thorough repair and renovation of tank portion roof as well as its peripheral wall, column and joist at Rabindra Sadan Auditorium during the year of 2026-2027
2026_WBPWD_5018247_1
WBPWD/KWSD-I/AE/eNIT-14/26-27
Open Tender
CIVIL WORKS
Percentage
15 days
Rabindra Sadan
Please refer Tender documents.
4 documents required · 4 mandatory
₹6,397
Yes
7 Oct 2026
10 Aug 2026
27 Aug 2026
17 Aug 2026
24 Aug 2026
17 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling all types of masonry excepting cement concrete plain or reinforced, stacking serviceable materials at site and removing rubbish as directed within a lead of 75 m.
Ground Floor | 0.72 | Cum. | 697 | ₹501.84 |
| 2 | Dismantling all types of plain cement concrete works, stacking serviceable materials at site and removing rubbish as directed within a lead of 75m.
In ground floor including roof.
(a) upto 150 mm. thick | - | Cum. | 1,189 | - |
| 3 | Cleaning the concrete surface by removing dirt and debris, marking defective locations and removing loose concrete by careful stripping untill hard surface is exposed, cutting the concrete to regular shape, wire brushing the exposed surface and removing debris from site complete as per direction of the Engineer-in-Charge. | 33.93 | Sqm. | 90 | ₹3,053.7 |
| 4 | Cleaning the exposed reinforcement preferably upto full diameter by wire brush, applying two coats of polymer based rust removing compound left for 24 hours, removing the coating and then applying two (2) coats of polymer modified anti corrosive protective coating formulated to inhibit the corrosion of reinforcement as per manufacturer's specification] [Mode of measurement:The affected surface area of reinforcement shall be considered for payment] | - | Sqm. | 782 | - |
| 5 | Applying epoxy based reactive joining agent for joining the old concrete with fresh concrete to be applied within manufacturer's specified time as per manufacturers specification. (0.4 Kg / m² of concrete surface). | 161.33 | Sqm. | 309 | ₹49,850.97 |
| 6 | Cement concrete (1:1.5:3) with graded stone chips 5.6 mm size with hexagonal square mesh wire netting, I.R.C. fabric mesh or X.P. M. fitted and fixed after tying the existing reinforcement on concrete without distributing the same and with proper scarping and cleaning the reinforcement and disturbed concrete with wire brush etc. after applying a coat of cement including the cost of wire netting I.R.C or X. P. M. & cost of all handling and scaffolding complete as per direction of Engineer-in-Charge.
c) 37.5mm thick | 33.93 | Sqm. | 584 | ₹19,815.12 |
| 7 | Ordinary Cement concrete (mix 1:2:4) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement,if any, in ground floor as per relevant IS codes.
a) Pakur Variety | - | Cum. | 5,761.25 | - |
| 8 | Artificial stone in floor, dado, staircase etc with cement concrete (1:2:4) with stone chips, laid in panels as directed with topping made with ordinary or white cement (as necessary) and marble dust in proportion (1:2) including smooth finishing and rounding off corners including raking out joints or roughening of concrete surface and application of cement slurry before flooring works using cement @ 1.75 kg/sq.m all complete including all materials and labour.
In ground floor.
3 mm. thick topping (High polishing grinding on this item is not permitted with ordinary cement).
Using grey cement
(ii) 25 mm. thick | 127.4 | Sqm. | 285.32 | ₹36,349.77 |
| 9 | Brick work with 1st class bricks in cement mortar (1:4)
(b) In superstructure, ground floor | - | Cum. | 6,412.4 | - |
| 10 | Stripping off worn out plaster and raking out joints of walls, celings etc. upto any height and in any floor including removing rubbish within a lead of 75m as directed. | 146.55 | Sqm. | 19 | ₹2,784.45 |
stage.html
html • 0.11 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.31 MB
2911.pdf
Tender Documents • 1.86 MB
BOQ_5089130.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .