| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.3 LAdmitted-Finance | ₹3.3 L | L1 | Admitted-Finance |
| Sl No | Description | Qty | Unit | V.RADHAKRISHNAN&CO L1 |
|---|---|---|---|---|
| 1.00 | Labour charges for dismantling of Jumpers and Droppers for single phase unit of 105MVA Auto Transformer .1 No of (Y-Phase) (Under LC Condition) | 8 | Nos | 770 ₹6,160 |
| 2.00 | Oil Draining from transformer using filter machine/Oil pump/Hose Etc.,per Liter Excess Qty above 800 Liters-Y-1No | 5,000 | lit | 0.7 ₹3,500 |
| 3.00 | Labour Charges for Dismantling of 1No of Y Phase( single phase unit) of 105 MVA Auto Transfromer and provision of suitable dummy plates for all opening such as HV bushing + turret, LV Bushing + Turret, all pipe lines and valves, Radiator in & out, including crane charges at Sunguvarchartram 400KV SS. | 1 | No | 30,000 ₹30,000 |
| 4.00 | Labour charges for Loading of for 1No of Main Tank of ICT including raising and lowering of power transformer using suitable jacks as many times as required with or without accessories from plinth . | 112.5 | MT | 780 ₹87,750 |
| 5.00 | Labour charges for Pulling out/ Pulling in of 3Nos Power/Auto Transformer from to plinth to a distance of 40Mt approx. or as per actual including charge for all T&Ps for 1No of Y Phase( single phase unit) of 105 MVA Auto Transfromer- at Sunguvarchartram 400KV SS. (TON*MTR*RATE/MTE)= 112.5 X 40=4500 | 4,500 | MT/M | 32 ₹1.4 L |
| 6.00 | Loading of Empty Oil drum 30 Nos from store to Sunguvarchartram 400KV SS . Mazdoor I Class | 2 | Nos | 750 ₹1,500 |
| 7.00 | UnLoading of Empty Oil drum 30 Nos at Sunguvarchartram 400KV SS . Mazdoor Class I. | 2 | Nos | 750 ₹1,500 |
| 8.00 | Transporting of Empty Oil drum from Store to Sunguvarchartram 400KV SS . 30Nos With in 50kms | 1 | trip | 3,900 ₹3,900 |
| 9.10 | SGST | 1 | percentage | 0.09 ₹25,047.90 |
| 9.20 | CGST | 1 | percentage | 0.09 ₹25,047.90 |
Tender Value
Refer Docs
EMD Value
₹3,220
Closing Date
29 Dec 2025, 2:00 pmClosed
SE/GCC-II/CNI
Superintending Engineer, GCC II, 230 KV CMRL GIS SS, Alandur, Chennai-16
As per NIT
2025_EB_634827_1
LT-23/2025-26 of SE/GCC-II
Limited
Civil Works
120 days
Sunguvarchatram
Please refer tender documents
2 documents required · 2 mandatory
₹0
₹3,220
Yes
17 Feb 2026
20 Dec 2025
30 Dec 2025
20 Dec 2025
29 Dec 2025
20 Dec 2025
Labour charges for dismantling of Jumpers and Droppers for single phase unit of 105MVA Auto Transformer .1 No of (Y-Phase) (Under LC Condition)
Oil Draining from transformer using filter machine/Oil pump/Hose Etc.,per Liter Excess Qty above 800 Liters-Y-1No
Labour Charges for Dismantling of 1No of Y Phase( single phase unit) of 105 MVA Auto Transfromer and provision of suitable dummy plates for all opening such as HV bushing + turret, LV Bushing + Turret, all pipe lines and valves, Radiator in & out, including crane charges at Sunguvarchartram 400KV SS.
Labour charges for Loading of for 1No of Main Tank of ICT including raising and lowering of power transformer using suitable jacks as many times as required with or without accessories from plinth .
Labour charges for Pulling out/ Pulling in of 3Nos Power/Auto Transformer from to plinth to a distance of 40Mt approx. or as per actual including charge for all T&Ps for 1No of Y Phase( single phase unit) of 105 MVA Auto Transfromer- at Sunguvarchartram 400KV SS. (TON*MTR*RATE/MTE)= 112.5 X 40=4500
Loading of Empty Oil drum 30 Nos from store to Sunguvarchartram 400KV SS . Mazdoor I Class
UnLoading of Empty Oil drum 30 Nos at Sunguvarchartram 400KV SS . Mazdoor Class I.
Transporting of Empty Oil drum from Store to Sunguvarchartram 400KV SS . 30Nos With in 50kms
GST for bidders outside TamilNadu (IGST)
Please Enable Macros to View BoQ information
stage.html
html • 0.02 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.05 MB
BOQ_759647.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid