| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L 1₹1.1 CrAccepted-AOC | ₹1.1 Cr | L 1 | Accepted-AOC L 1 |
| 2 | L 2₹1.1 Cr+₹66,791 (0.61%)Rejected-Finance 107 133 B MILLERPURAM TUTICORIN 628008 | TUTICORIN | TUTICORIN | TAMIL NADU | 628008 | ₹1.1 Cr+₹66,791 (0.61%) | L 2 | Rejected-Finance L 2 |
| 3 | L 3₹1.1 Cr+₹3.3 L (3.00%)Rejected-Finance NEW NO 5 MAL STREET SAWYERPURAM THOOTHUKUDI 628251 | TUTICORIN | TAMIL NADU | 628251 | ₹1.1 Cr+₹3.3 L (3.00%) | L 3 | Rejected-Finance L 3 |
| 4 | L 4₹1.1 Cr+₹5.2 L (4.72%)Rejected-Finance 4 289 THIRUMALAI STREET GURUSAMY NAGAR NAGAMALAI PUDUKOTTAI MADURAI 625019 | MADURAI | TAMIL NADU | 625019 | ₹1.1 Cr+₹5.2 L (4.72%) | L 4 | Rejected-Finance L 4 |
| 5 | L 5₹1.2 Cr+₹7.5 L (6.86%)Rejected-Finance TUTICORIN | TUTICORIN | TAMIL NADU | 626202 | ₹1.2 Cr+₹7.5 L (6.86%) | L 5 | Rejected-Finance L 5 |
| Sl No | Description | Qty | Unit | RKANDSONS L8 | Ramesh Enterprises L5 | S.R.SELVARAJ CONSTRUCTIONS PVT LTD L9 | P. JEFFERSON SAMUEL RAJ & SONS L3 | P.MEERAZA L7 | Mahaaraja Engineering Contractor L6 | Shri Venkateswara Constructions L2 | SRM ENTERPRISES L4 | C PALANICHAMY L1 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Earthwork excavation in trenches for foundation in dense or hard soils not exceeding 1.50m in width and including dressing of sides and ramming of bottom lift upto 1.50m including getting out of the excavated soil and disposal of surplus excavated soil as directed within a lead of 50m and lift of 1.50m, cost including shuttering, strutting, bailing out seepage of water wherever necessary etc., complete complying with AISS and as directed by the departmental officers. | 1,893 | Cum | 161 ₹3,04,773 | 125 ₹2,36,625 Lowest | 200 ₹3,78,600 | 140 ₹2,65,020 | 250 ₹4,73,250 | 300 ₹5,67,900 | 150 ₹2,83,950 | 301.19 ₹5,70,152.67 | 300 ₹5,67,900 |
| 2.00 | Providing and laying Plain Cement Concrete 1:4:8 (One part of cement, 4 parts of M. Sand (Crushed Stone Sand) & 8 Parts of 40 mm nominal size metal ) for foundation using 40 mm nominal size graded metal including mixing, laying, levelling, consolidation, finishing and curing etc., complete complying with AISS and as directed by the departmental officers. | 105 | Cum | 4,023 ₹4,22,415 | 4,800 ₹5,04,000 | 5,500 ₹5,77,500 | 4,950 ₹5,19,750 | 4,500 ₹4,72,500 | 5,500 ₹5,77,500 | 4,000 ₹4,20,000 Lowest | 4,493.65 ₹4,71,833.25 | 5,900 ₹6,19,500 |
| 3.00 | Providing Form work including centring, shuttering, (shuttering Planks shall not less than 38 mm thick) so as to give a rough finish shuttering and propping etc., in all floors upto full height of the building and removal of the same for in situ RCC work such as beam, slabs, lintels, sunshade etc., complete complying with AISS and as directed by the departmental officers. | 2,400 | Sqm | 604 ₹14,49,600 | 280 ₹6,72,000 Lowest | 500 ₹12,00,000 | 295 ₹7,08,000 | 450 ₹10,80,000 | 470 ₹11,28,000 | 450 ₹10,80,000 | 487.68 ₹11,70,432 | 960 ₹23,04,000 |
| 4.00 | Fabricating and placing in position of M.S / Tor steel grills for R.C.C works in all floors including cost of Steel, cutting, bending, binding with 16 Gauge GI Binding wire and placing in position etc., complete complying with AISS and as directed by the departmental officers | 63 | MT | 85,993 ₹54,17,559 | 81,000 ₹51,03,000 | 90,000 ₹56,70,000 | 70,000 ₹44,10,000 | 75,000 ₹47,25,000 | 73,000 ₹45,99,000 | 67,000 ₹42,21,000 | 68,487.61 ₹43,14,719.43 | 93 ₹5,859 Lowest |
| 5.00 | Providing and laying Reinforced Cement Concrete 1:1.5:3 (One part of cement, One and a half parts of
M. Sand (Crushed Stone Sand) & Three Parts of graded stone aggregate (i.e.) 2 parts of 20mm nominal size graded metal & 1 part of 10mm nominal size graded metal) using 20 mm nominal size graded metal including mixing, laying, levelling, consolidation, finishing and curing etc., and excluding the cost of form work and reinforcement grills for all RCC works in all floors upto full height of the building etc., complete complying with AISS and as directed by the departmental officers | 739 | Cum | 5,882 ₹43,46,798 Lowest | 6,550 ₹48,40,450 | 7,250 ₹53,57,750 | 6,900 ₹50,99,100 | 7,080 ₹52,32,120 | 6,500 ₹48,03,500 | 6,500 ₹48,03,500 | 6,395.04 ₹47,25,934.56 | 9,600 ₹70,94,400 |
| 6.00 | Deploying earth moving machinery JCB wherever required for the following works viz., Earthwork excavation, filling, levelling the undulated area, cleaning the vegetation along with roots, removal of unwanted debris / juliflora trees, loading into lorry and for any other works required etc., including cost of diesel, oil, operator charges etc., complete and as directed by the departmental officers. | 300 | Hrs | 1,112 ₹3,33,600 | 1,050 ₹3,15,000 | 1,250 ₹3,75,000 | 825 ₹2,47,500 | 800 ₹2,40,000 | 800 ₹2,40,000 | 600 ₹1,80,000 Lowest | 611.99 ₹1,83,597 | 1,100 ₹3,30,000 |
Tender Value
Refer Docs
EMD Value
₹2.9 L
Closing Date
2 Jun 2025, 3:00 pmClosed
Chief Engineer
Chief Engineer, VOC Port
Construction of RCC Drain for Stormwater Evacuation from Thoothukudi City to Seawater
2025_VOCPT_235255_1
04 CE/RCM BMR/2025-26
Open Tender
Civil Works
Works
180 days
VOC Port
Please refer Tender documents.
8 documents required · 8 mandatory
₹0
₹2.9 L
24 Sept 2025
13 May 2025
3 Jun 2025
13 May 2025
2 Jun 2025
13 May 2025
Amount
Earthwork excavation in trenches for foundation in dense or hard soils not exceeding 1.50m in width and including dressing of sides and ramming of bottom lift upto 1.50m including getting out of the excavated soil and disposal of surplus excavated soil as directed within a lead of 50m and lift of 1.50m, cost including shuttering, strutting, bailing out seepage of water wherever necessary etc., complete complying with AISS and as directed by the departmental officers.
Providing and laying Plain Cement Concrete 1:4:8 (One part of cement, 4 parts of M. Sand (Crushed Stone Sand) & 8 Parts of 40 mm nominal size metal ) for foundation using 40 mm nominal size graded metal including mixing, laying, levelling, consolidation, finishing and curing etc., complete complying with AISS and as directed by the departmental officers.
Providing Form work including centring, shuttering, (shuttering Planks shall not less than 38 mm thick) so as to give a rough finish shuttering and propping etc., in all floors upto full height of the building and removal of the same for in situ RCC work such as beam, slabs, lintels, sunshade etc., complete complying with AISS and as directed by the departmental officers.
Fabricating and placing in position of M.S / Tor steel grills for R.C.C works in all floors including cost of Steel, cutting, bending, binding with 16 Gauge GI Binding wire and placing in position etc., complete complying with AISS and as directed by the departmental officers
Providing and laying Reinforced Cement Concrete 1:1.5:3 (One part of cement, One and a half parts of M. Sand (Crushed Stone Sand) & Three Parts of graded stone aggregate (i.e.) 2 parts of 20mm nominal size graded metal & 1 part of 10mm nominal size graded metal) using 20 mm nominal size graded metal including mixing, laying, levelling, consolidation, finishing and curing etc., and excluding the cost of form work and reinforcement grills for all RCC works in all floors upto full height of the building etc., complete complying with AISS and as directed by the departmental officers
Deploying earth moving machinery JCB wherever required for the following works viz., Earthwork excavation, filling, levelling the undulated area, cleaning the vegetation along with roots, removal of unwanted debris / juliflora trees, loading into lorry and for any other works required etc., including cost of diesel, oil, operator charges etc., complete and as directed by the departmental officers.
Shri Venkateswara Constructions (BID ID -853246)
P. JEFFERSON SAMUEL RAJ & SONS (BID ID -856874)
SRM ENTERPRISES (BID ID -855930)
Ramesh Enterprises (BID ID -857163)
Mahaaraja Engineering Contractor (BID ID -856024)
P.MEERAZA (BID ID -857127)
RKANDSONS (BID ID -856660)
S.R.SELVARAJ CONSTRUCTIONS PVT LTD (BID ID -855073)
stage.html
html • 0.06 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.PDF
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .