| 1 | 1₹20.1 LAccepted-Finance 11 17A 4 MADILINE OPPOSITE SALEM CAMP PO METTUR DAM 636 456 | SALEM | TAMIL NADU | 636456 | ₹20.1 L | 1 | Accepted-Finance Satisfied |
| 2 | 2₹22.2 LAccepted-Finance 39 39 THANGAMAPURI PATTINAM METTUR DAM 636402 | SALEM | TAMIL NADU | 636402 | ₹22.2 L | 2 | Accepted-Finance Satisfied |
| 3 | Rejected-Technical 5 151 B DR SUBRAYAN NAGAR EAST MAIN ROAD METTUR DAM 636401 | METTUR DAM | SALEM | TAMIL NADU | 636401 | - | - | Rejected-Technical EMD condition not satisfied |
| Sl No | Description | Qty | Unit | LENIN ENGINEERING WORKS L1 | BHARATH ENGINEERING WORKS L2 |
|---|---|---|---|---|---|
| 1.00 | Charges for supporting the structure in front and rear side of Wagon Tippler at drive and non drive end frames by using ISMB 450 X 150 mm, 350 x 140mm, 200 X 100mm channels, angles and packing of wooden sleepers to avoid swing of tippler platform and making stability and safety arrangements and after attending all works, dismantling of supporting arrangements after completion of work. | 1 | No | 27,799 ₹27,799 | 31,000 ₹31,000 |
| 2.00 | Charges for removal of top cover, bottom cover, single piece pillow block, cleaning of split spur wheel, and removal of split spur wheel from the drive shaft by splitting the two halves of the split spur wheel and lifting them to the Wagon Tippler floor from main shaft drive pit. | 1 | No | 19,500 ₹19,500 | 22,500 ₹22,500 |
| 3.00 | Charges for removal of drive shaft from drive pit and also dismantling the drive side plummer blocks, removal of rack segment - 2Nos for easy removing and lifting drive shaft to Wagon Tippler floor. | 1 | No | 32,855 ₹32,855 | 37,000 ₹37,000 |
| 4.00 | Charges for removal of Plummer block (near pinion) top & bottom fixing bolts & nuts, removing of rigid coupling bolts, removal of intermediate shaft near the drive shaft from the other intermediate shaft and dismantling the drive shaft. | 4 | No | 37,426 ₹1,49,704 | 41,500 ₹1,66,000 |
| 5.00 | Charges for removal and refixing of final pinion shaft from drive pit and also dismantling the drive side plummer blocks, removal of rack segment - 2Nos for easy removing and lifting drive shaft to Wagon Tippler floor | 1 | No | 32,854 ₹32,854 | 36,500 ₹36,500 |
| 6.00 | Charges for removing the existing damaged Foundations and Bed Bolts in the top surface of the bed by using Power Jack Hammer. After erection of bed bolt alignment checking, fixing the cross rod in the bed bolts and applying the Nitobond to the surface area of the existing concrete and cement ( Quick setting cement Con bextra GP2 ) plastering and surface finishing then curing the area. | 6 | Nos | 27,622 ₹1,65,732 | 31,100 ₹1,86,600 |
| 7.00 | Charges for fabrication of new bed frame assembly as per existing bed frame size for Wagon Tippler main drive shaft, intermediate shaft and final pinion shaft by using 20mm thick MS plates cutting, marking, edge grinding, setting & welding & drilling of bottom & top plate of bed frame. | 6 | Nos | 76,175 ₹4,57,050 | 84,500 ₹5,07,000 |
| 8.00 | Charges for mounting / reerect of split spur wheel in the drive shaft and checking the operation of the Wagon Tippler after completion of all works. | 1 | No | 31,795 ₹31,795 | 36,000 ₹36,000 |
| 9.00 | Charges for reerect the intermediate shaft after positioning drive shaft, final pinion shaft and refixing the coupling, (other end) plummer blocks and rack segment – 4 Nos. and related assemblies, greasing and tightening all plummer blocks top and bottom halves, fixing bolts and tightening all rigid coupling bolts after putting HSFG bolts. | 1 | No | 28,069 ₹28,069 | 31,500 ₹31,500 |
| 10.00 | Charges for alignment of the Wagon Tippler such as (1) Pinion and split spur wheel (2) Rack and pinion (3) Pawl and pawl lever arrangement (4) pivot shafts alignment with pedestal for operation of Wagon tippler and trail run etc. | 1 | No | 44,135 ₹44,135 | 49,100 ₹49,100 |
Tender Value
Refer Docs
EMD Value
₹25,000
Closing Date
24 Nov 2025, 2:00 pmClosed
CE / MTPS-I
Chief Engineer Mettur Thermal Power Station-I Mettur Dam- 636406 Salem District
MTPS I CHP I Replacement of existing heavily damaged wornout drive bed frame structures with bed foundation in Wagon Tippler II
2025_EB_621902_1
CE SE M II MTPS I CHP I OT 44 2025 2026
Open Tender
Miscellaneous Works
45 days
MTPS-I
As per Tender Specification
7 documents required · 7 mandatory
₹0
₹25,000
Yes
9 Jan 2026
10 Nov 2025
25 Nov 2025
10 Nov 2025
24 Nov 2025
10 Nov 2025
Amount
Charges for supporting the structure in front and rear side of Wagon Tippler at drive and non drive end frames by using ISMB 450 X 150 mm, 350 x 140mm, 200 X 100mm channels, angles and packing of wooden sleepers to avoid swing of tippler platform and making stability and safety arrangements and after attending all works, dismantling of supporting arrangements after completion of work.
Charges for removal of top cover, bottom cover, single piece pillow block, cleaning of split spur wheel, and removal of split spur wheel from the drive shaft by splitting the two halves of the split spur wheel and lifting them to the Wagon Tippler floor from main shaft drive pit.
Charges for removal of drive shaft from drive pit and also dismantling the drive side plummer blocks, removal of rack segment - 2Nos for easy removing and lifting drive shaft to Wagon Tippler floor.
Charges for removal of Plummer block (near pinion) top & bottom fixing bolts & nuts, removing of rigid coupling bolts, removal of intermediate shaft near the drive shaft from the other intermediate shaft and dismantling the drive shaft.
Charges for removal and refixing of final pinion shaft from drive pit and also dismantling the drive side plummer blocks, removal of rack segment - 2Nos for easy removing and lifting drive shaft to Wagon Tippler floor
Charges for removing the existing damaged Foundations and Bed Bolts in the top surface of the bed by using Power Jack Hammer. After erection of bed bolt alignment checking, fixing the cross rod in the bed bolts and applying the Nitobond to the surface area of the existing concrete and cement ( Quick setting cement Con bextra GP2 ) plastering and surface finishing then curing the area.
Charges for fabrication of new bed frame assembly as per existing bed frame size for Wagon Tippler main drive shaft, intermediate shaft and final pinion shaft by using 20mm thick MS plates cutting, marking, edge grinding, setting & welding & drilling of bottom & top plate of bed frame.
Charges for mounting / reerect of split spur wheel in the drive shaft and checking the operation of the Wagon Tippler after completion of all works.
Charges for reerect the intermediate shaft after positioning drive shaft, final pinion shaft and refixing the coupling, (other end) plummer blocks and rack segment – 4 Nos. and related assemblies, greasing and tightening all plummer blocks top and bottom halves, fixing bolts and tightening all rigid coupling bolts after putting HSFG bolts.
Charges for alignment of the Wagon Tippler such as (1) Pinion and split spur wheel (2) Rack and pinion (3) Pawl and pawl lever arrangement (4) pivot shafts alignment with pedestal for operation of Wagon tippler and trail run etc.
Charges for cutting and removal of existing eroded / wornout chequered plates, support channel & plates in table platform, counter weight top plate and it supports in wagon tippler and devoluting to Central Stores.
Charges for fabrication, cutting, marking & drilling flanges, and marking & cutting of chequered plate, edge grinding, setting & welding of flange angles with chequered plate. Fabrication, marking & cutting of support plates, channel and stiffeners to required size in wagon tippler table platform.
Charges for loading, leading, lifting & positioning the fabricated chequered plate table platform on position. Fitting and fixing bolts & nuts with table bed. Fitting & welding the support angle, channel & plates and resuming the wagon tippler table.
Charges for supply of MS chequered plate 6 mm thick
Charges for supply of MS plate 10 mm thick
Charges for supply of M30 foundation bolt with 2 nuts & washers
Charges for supply of MS plate 20 mm thick
Charges for consumables such as cotton waste, Anti corrosive paint etc, and T&P's spanner set hammers, sprit level etc, Sl.No. 1 to 13
Supply of MS welding electrode for Sl.no. 7
Charges for cutting gas for Sl.no. 1, 3, 4, 5 & 7
BHARATH ENGINEERING WORKS (BID ID -1519355)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.77 MB
BOQ_743602.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid