| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.0 LAccepted-AOC | L1 | Accepted-AOC L-1 | |
| 2 | L2₹12.5 L+₹4.5 L (56.9%)Rejected-Finance | L2 | Rejected-Finance being other than lowest | |
| 3 | L3₹17.5 L+₹9.5 L (118.5%)Rejected-Finance H NO 177 GOVINDPURA SATWARI JAMMU CANTT 180003 J K | JAMMU | JAMMU AND KASHMIR | 180003 | L3 | Rejected-Finance being other than lowest | |
| 4 | L4₹17.5 L+₹9.5 L (118.9%)Rejected-Finance | L4 | Rejected-Finance being other than lowest | |
| 5 | Rejected-Technical | - | Rejected-Technical Rejected |
Tender Value
Refer Docs
EMD Value
₹40,000
Closing Date
24 Feb 2021, 6:00 pmClosed
GE Jammu
GE Jammu c/o 56 APO Pin-180003
MANNING AND OPERATION OF WATER SUPPLY INSTALLATION AT MIRAN SAHIB UNDER GE JAMMU
2020_MES_403301_2
GEJC-58/2020-21
Open Tender
Electrical and Maintenance Works
Item Rate
335 days
AoR of GE Jammu
Please refer Tender Documents
8 documents required · 8 mandatory
₹500
GE Jammu
₹40,000
Yes
28 Jul 2021
11 Feb 2021
26 Feb 2021
11 Feb 2021
24 Feb 2021
12 Feb 2021
Amount
Maint and operation of Water supply installation Pump House (Tubewell No 02) SK Line with one FGM per shift in three shift (each shift of 8 hours) 24 hrs round the clock including Sunday and holiday and operation and maintenance of the following all as directed by Engr-in-Charge:- (a) VT Motor Induction motor - 20 HP - 01 Nos. (b) Oil immerse starter 20 HP - 01 Nos. (c) Voltage stabilizer servo 50 KVA - 01 Nos. (d) Operation of DG set 40 KVA during failure of electric supply. (e) LT Panel - 01 Nos. (f) Chlorination Dozing Plant - 01 Nos. (g) To attend Complaint of water supply pipe line leakage. (h) Sluice valve 100mm dia to 150mm dia - 07 Nos. (j) Change over 125 Amps - 01 Nos. (k) Overhead Tank 100000 GLNS - 01 Nos. (l) Undertake cleanliness of Pump house and its surrounding within 100 Metre of the vicinity of substation.
Maint and operation of Water supply installation Pump House (Tubewell No 02) Partap Line with one FGM per shift in three shift (each shift of 8 hours) 24 hrs round the clock including Sunday and holiday and operation and maintenance of the following all as directed by Engr-in-Charge:- (a) Submersible Pump & motor 25 HP - 01 Nos. (b) Oil immerse starter 20 HP - 01 Nos. (c) Voltage stabilizer servo 50 KVA - 01 Nos. (d) Operation of DG set 40 KVA during failure of electric supply - 01 Nos. (e) LT Panel - 01 Nos. (f) Chlorination Dozing Plant - 01 Nos. (g) To attend Complaint of water supply pipe line leakage. (h) Sluice valve 100mm dia to 150mm dia - 07 Nos. (j) Undertake cleanliness of Pump House and its surrounding within 100 Metre of the vicinity of the substation. (k) Change over 125 Amps - 01 Nos. (l) Over head Tank 100000 GLNS - 01 Nos.
Maint and operation of Water supply installation Pump House (Tubewell No 02) DC Line with one FGM per shift in three shift (each shift of 8 hours) 24 hrs round the clock including Sunday and holiday and operation and maintenance of the following all as directed by Engr-in-Charge:- (a) Submersible Pump & motor 25 HP - 01 Nos. (b) Oil immerse starter 25 HP - 01 Nos. (c) Voltage stabilizer servo 50 KVA - 01 Nos. (d) Operation of DG set 60 KVA during failure of electric supply - 01 Nos. (e) LT Panel - 01 Nos. (f) Chlorination Dozing Plant - 01 Nos. (g) To attend Complaint of water supply pipe line leakage. (h) Sluice valve 100mm dia to 150mm dia - 04 Nos. (j) Undertake cleanliness of Pump House and area around overhead tank and its surrounding within 100 Metre of the vicinity of the sub station. (k) Change over 125 Amps - 01 Nos. (l) Over head Tank 100000 GLNS - 01 Nos.
Note : The Staff shall be ITI qualified from Govt recognized institute or Technician with minimum 05 years experience in the related field.
The contractor has to supply uniform to their employees for wearing during the working hours. The unit rate is deemed to include for the uniform. The uniform pattern shall wear Grey colour or as approved by Engr-in-Charge.
The rate quoted is deemed to be inclusive of providing mobile communication system to the operator detailed so that feed back can be obtained.
The safety precautions for the staff will be the responsibility of the contractor and the unit rate is deemed to include for the safety eqpts and the T & P required for routine maintenance of the plant.
The contractor has to provide insurance cover to the man power employed.
The general cleaniness of the area in and around the installation and the plants installed will be the responsibility of the contractor.
The contractor will engage his labour for collection of POL from MES store yard and shifting to the installations to be run under it.
The cost of maintenance of documents, installation charts and daily records i.e log sheet and attendance register as clarified under relevant PS shall deemed to be included in rates quoted for the above items.
Minor repairs required to maintain above equipments in operational condition shall be deemed to be included in the quoted rate.
The Wages to the staff employed will be payed in the Adhaar linked bank account and the monthly statement be deposited in the office before release of RAR.
The contractor shall provide reliever for operation as per prevailing labour regulation and the rate shall be deemed to include for the the same . Employee may be asked to carry out duty in unit areas and under Miran Sahib area all as directed by the Engineer-in-Charge and it shall be deemed that contractor has to quoted rates keeping that aspects inview and nothing extra shall be admissioble later on the account of misinterpretation. Installation should kept neat and clean . All types of T&P safety equpt wiil be provided by the contractor.
Note:- (a) The staff skilled deployed shall be ITI qualified or having min of 05 years experience in the trade as per description in Sch "A" and submit details of qualification and experience before commencement of work at site with Engr-in-Charge. Being defence installation , the contractor shall ensure that the antecedents of personnel shall be got verified before employing. (b) A recovery double the salary per day of employee will be penalised / deducted from the RAR for non engagement of person due to any reason by the Contractor.
Contractor shall produce documentary evidence of Aadhaar linked Bank Account of employee/wages employed under this contract along with claimed payment. No Payment shall be made to the contractor without the proof of payment made to employee/wages through Aadhar linked account.
Contractor shall produce life insurance cover of minimum Rs 5.00 Lakh of their employee/wages employed under this contract alongwith claimed payment. No Payment shall be made to the contractor without the documentary evidence. The contractor quoted rates shall be deemed to include for the same.
M/S ESS ESS ENTERPRISES
M/S A TO Z ENGINEERS
Harsh Electricals
Bidder Name
M/S ESS ESS ENTERPRISES
Harsh Electricals
M/S A TO Z ENGINEERS
M/S SALARIA ASSOCIATES
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .