| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.3 CrAdmitted-Finance | ₹1.3 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.3 Cr+₹37,823.65 (0.28%)Admitted-Finance | ₹1.3 Cr+₹37,823.65 (0.28%) | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | M/S A S ENTERPRISES L2 | M/S KUNKAPHU ENTERPRISES L1 |
|---|---|---|---|---|---|
| 1.00SH: JUNGLE CLEARANCE | |||||
| 1.01 | Clearing jungle including uprooting of rank vegetation, grass, cane and bamboo roots or clumps, brush wood, trees and saplings of girth upto 30 cm measured at a height of 1.22 m above ground level and removal of rubbish upto a distance of 50 m outside the periphery of the area cleared.
B) In area of thorny Jungle | 1.6 | Hect. | 1,30,174 ₹2,08,278.4 Lowest | 1,30,174 ₹2,08,278.4 Lowest |
| 2.00SH: FORMATION CUTTING | |||||
| 2.01 | Excavation in Soil using Hydraulic Excavator CK 90 and Tippers with Disposal upto 1000 metres.
Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m | 16,771.91 | Cum | 113 ₹18,95,225.83 | 111 ₹18,61,682.01 Lowest |
| 2.02 | Excavation in Ordinary Rock using Hydraulic Excavator CK-90 and Tippers with Disposal upto 1000 metres.
Excavation for roadway in ordinary rock with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, transporting to embankment site within all lifts and lead upto 1000 m, trimming bottom and side slopes in accordance with requirements of lines, grades and cross section. | 5,963.98 | Cum | 140 ₹8,34,957.2 Lowest | 140 ₹8,34,957.2 Lowest |
| 3.00SH: Preparation of Sub-Grade | |||||
| 3.01 | Preparation of sub grade (Preparation of sub grade by excavating earth to an average depth of 22.50 cm, dressing to camber and consolidating with road roller, making good the undulations etc. and disposal of surplus earth, lead upto 50 m.) | 6,682.5 | Sqm | 133 ₹8,88,772.5 Lowest | 133 ₹8,88,772.5 Lowest |
| 3.02 | Consolidation of sub-grade with road roller of 8 to 12 tonne capacity including making good the undulations etc. with earth or quarry spoils etc. and rerolling the sub grade. | 6,682.5 | Sqm | 6.34 ₹42,367.05 Lowest | 6.34 ₹42,367.05 Lowest |
| 4.00SH: WBM GRADING-I (3.75 M WIDTH)e | |||||
| 4.01 | Water Bound Macadam Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with 3 wheeled steel/ vibratory roller 8-10 tonnes in stages to proper grade and camber, applying and brooming requisite type of screening/ binding Materials to fill up the interstices of coarse aggregate, watering and compacting to the required density.
A) By Manual Means
(i) Grading - I
(a) Using Scrining Crushable type such as Moorum or Gravele. | 536.25 | Sqm | 3,777 ₹20,25,416.25 Lowest | 3,777 ₹20,25,416.25 Lowest |
Tender Value
Refer Docs
EMD Value
₹1.3 L
Closing Date
12 Sept 2025, 10:00 amClosed
Executive Engineer, Thrizino Division, PWD
O/o -Executive Engineer, Thrizino Division, PWD
C/o Approach road at Buragaon, West Kameng District.
2025_PWDAP_2708_1
TZND/TandA-04/2025-26/04 Dated 05/09/2024
Open Tender
Civil Works
Item Rate
365 days
Thrizino
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,000
EE, PWD, Thrizino
₹1.3 L
Yes
O/o the Assistanr Engineer Bhalukpong Sub Division
12 Sept 2025
5 Sept 2025
12 Sept 2025
5 Sept 2025
12 Sept 2025
5 Sept 2025
8 Sept 2025
Amount
SH: JUNGLE CLEARANCE
Clearing jungle including uprooting of rank vegetation, grass, cane and bamboo roots or clumps, brush wood, trees and saplings of girth upto 30 cm measured at a height of 1.22 m above ground level and removal of rubbish upto a distance of 50 m outside the periphery of the area cleared. B) In area of thorny Jungle
SH: FORMATION CUTTING
Excavation in Soil using Hydraulic Excavator CK 90 and Tippers with Disposal upto 1000 metres. Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m
Excavation in Ordinary Rock using Hydraulic Excavator CK-90 and Tippers with Disposal upto 1000 metres. Excavation for roadway in ordinary rock with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, transporting to embankment site within all lifts and lead upto 1000 m, trimming bottom and side slopes in accordance with requirements of lines, grades and cross section.
SH: Preparation of Sub-Grade
Preparation of sub grade (Preparation of sub grade by excavating earth to an average depth of 22.50 cm, dressing to camber and consolidating with road roller, making good the undulations etc. and disposal of surplus earth, lead upto 50 m.)
Consolidation of sub-grade with road roller of 8 to 12 tonne capacity including making good the undulations etc. with earth or quarry spoils etc. and rerolling the sub grade.
SH: WBM GRADING-I (3.75 M WIDTH)e
Water Bound Macadam Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with 3 wheeled steel/ vibratory roller 8-10 tonnes in stages to proper grade and camber, applying and brooming requisite type of screening/ binding Materials to fill up the interstices of coarse aggregate, watering and compacting to the required density. A) By Manual Means (i) Grading - I (a) Using Scrining Crushable type such as Moorum or Gravele.
Water Bound Macadam Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with 3 wheeled steel/ vibratory roller 8-10 tonnes in stages to proper grade and camber, applying and brooming requisite type of screening/ binding Materials to fill up the interstices of coarse aggregate, watering and compacting to the required density. A) By Manual Means (i) Grading - II (a) Using Scrining Crushable type such as Moorum or Gravel
Water Bound Macadam Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with 3 wheeled steel/ vibratory roller 8-10 tonnes in stages to proper grade and camber, applying and brooming requisite type of screening/ binding Materials to fill up the interstices of coarse aggregate, watering and compacting to the required density. A) By Manual Means (i) Grading - III (a) Using Scrining Crushable type such as Moorum or Gravelvel
SH: RCC SLAB CULVERT (1.50 M SPA
Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.(without de-watering) Ordinary soil Manual Means Upto 3 mtr depth
Ordinary Rock Not requiring blasting
PCC 1:3:6 in Foundation (Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.)
Stone masonry work in cement mortar 1:3 for substructure complete as per drawing and Technical Specifications B) Random Rubble Masonry.
Plain/Reinforced cement concrete in sub-structure complete as per drawing and technical specifications ( PCC Grade M-15)
Furnishing and Placing Reinforced/Prestressed cement concrete in super-structure as per drawing and Technical Specification (RCC Grade M 20) Height upto 5m For Solid Slab Super-Structure, 20-30 per cent of (a+b+c))
Supplying, fitting and placing HYSD bar reinforcement in super-structure complete as per drawing and technical specifications
Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment, wing wall/return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical specifications
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical specification
SH: RRM RETAINING WALL (3.00 M HT.) AND LENGTH 58.00 M
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work. i) Ordinary Soil A) Manual Means,up to 3m depth
ii) Ordinary Rock (not requiring blasting) A) Manual Means, up to 3m depth
PCC 1:3:6 in Foundation (Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.)
Stone masonry work in cement mortar 1:3 for substructure complete as per drawing and Technical Specifications. A) Random Rubble Masonry)
Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical Specifications
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical Specification Granular mater
M/S A S ENTERPRISES (BID ID -7929)
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .