| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.7 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹5.9 L+₹14,980 (2.62%)Rejected-Finance | L2 | Rejected-Finance NOT L1 | |
| 3 | L3₹6.1 L+₹42,280 (7.41%)Rejected-Finance | L3 | Rejected-Finance NOT L1 |
Tender Value
₹5.7 L
EMD Value
₹6,000
Closing Date
1 Sept 2021, 4:00 pmClosed
SE(HQ),PTPP,Parichha,Jhansi
SE(HQ),PTPP, Parichha , Jhansi
Shifting of 11KV overhead line and transformers for strengthening of electrical supply system with construction of new 11/0.4KV Substations and rerouting of 11KV overhead line with 11Kv, 3Cx 185/ 150 sq.mm underground cable at PTPP colony, Parichha.
2021_RVUNL_609718_1
ET-09/SE(HQ)/CEMD/PTPP/2021-22
Open Tender
Electrical Works
Piece-work
180 days
PTPP colony, Parichha
Please refer Tender documents
2 documents required · 2 mandatory
₹590
Dy. CAO, CFA and BO, PTPP, Parichha
₹6,000
17 Nov 2021
9 Aug 2021
2 Sept 2021
10 Aug 2021
1 Sept 2021
10 Aug 2021
10 Aug 2021 - 1 Sept 2021
Amount
Fabrication of M.S. structure (Plinth) with M S beam, channel, plate etc. for erection 0f 400 KVA distribution transformer after leveling and strengthening of ground along with grouting and painting with red oxide and then with standard make black colour.
Dismantling, shifting and mounting of one distribution transformer from near VIP guest house to type-III and other from VIP guest house to near main road of VIP guest house with all associated work.
Complete earthing of distribution transformer of 11/0.4 KV substation including supply of earthing materials as per scope of work.
Erection and supply of double pole structure and TPMO set with accessories for connection of 11KV XLPE cable to transformer and other associated work.
Laying of 11KV, 3Cx185/150 Sq mm XLPE insulated and 3.5Cx185 sq.mm, PVC insulated armoured, Al conductor cable after digging of soil/ concrete and refilling of trench as per scope of work. (a) From pole near 11/0.4 KV CISF colony substation to 11/0.4 KV substation b/w type third and VIP guest House.
Laying of 11KV, 3Cx185/150 Sq mm XLPE insulated and 3.5Cx185 sq.mm, PVC insulated armoured, Al conductor cable after digging of soil/ concrete and refilling of trench as per scope of work. (b) From 11KV breaker at (33/11KV) main substation to 11/0.4 KV substation near canteen.
Laying of 11KV, 3Cx185/150 Sq mm XLPE insulated and 3.5Cx185 sq.mm, PVC insulated armoured, Al conductor cable after digging of soil/ concrete and refilling of trench as per scope of work. (c) From existing 11KV feeder to 11/0.4 KV new VIP guest house substation.
Laying of 11KV, 3Cx185/150 Sq mm XLPE insulated and 3.5Cx185 sq.mm, PVC insulated armoured, Al conductor cable after digging of soil/ concrete and refilling of trench as per scope of work. (d) From new VIP guest house substation to changeover of VIP guest house.
Making of joints for 11KV, 3Cx185mm2/150mm2 Al. conductor Power cables with supply of Heat shrinkable end termination/straight through jointing kit.
Fabrication and erection of MS Fencing around 11/0.440 KV distribution transformers.
Testing and commissioning of entire new erected 11/0.440KV Distribution Transformers.
KRISHNA ENTERPRISES
M/S NOSAD CONTRACTOR
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .