Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.9 CrAdmitted-Finance A 216 217 218 CITI TOWER SECTOR 15 CBD BELAPUR NEW MUMBAI 400614 | NEW MUMBAI | THANE | MAHARASHTRA | 400614 | -0.25% | ₹1.9 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.9 Cr+₹5.2 L (2.76%)Admitted-Finance | +2.50% | ₹1.9 Cr+₹5.2 L (2.76%) | L2 | Admitted-Finance |
| 3 | L3₹2.0 Cr+₹13.6 L (7.27%)Admitted-Finance | +7.00% | ₹2.0 Cr+₹13.6 L (7.27%) | L3 | Admitted-Finance |
Tender Value
₹2.1 Cr
EMD Value
₹2 L
Closing Date
20 Mar 2026, 4:00 pmClosed
Dy.Commisnor, BNCMC.
Bhiwandi Nizampur City Municipal Corporation,Kaap Ali,Bhiwandi
Const. of VIP Gallery SPECTATORS GALLERY AND CAMPUS DEVELOPMENT IN SHIVAJI MAHARAJ STADIUM FOR B.N.M.C. AT BHIWANDI NIZAMPUR CITY MUNICIPAL CORPORATION
2026_BNMC_1286318_1
BNCMC/PWD 198/2026_1
Open Tender
Civil Works
Percentage
Bhiwandi Nizampur City Municipal Corporation, Kaap
Please refer Tender documents.
3 documents required · 3 mandatory
₹2,360
₹2 L
Head Office, BNCMC.
23 Apr 2026
13 Mar 2026
23 Mar 2026
13 Mar 2026
20 Mar 2026
13 Mar 2026
17 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling brick masonry in lime or cement mortar and stacking the materils as directed with all leads, lifts etc. Ground Floor | - | cu.m | - | - |
| 2 | First Floor | - | cu.m | - | - |
| 3 | Removing cement tiles, or marble or polished shahabad floor or dado without bed concrete including stacking the materials as directed with all leads, lifts etc. complete Ground Floor | - | sqm. | - | - |
| 4 | First Floor | - | sqm. | - | - |
| 5 | Removing doors and windows with frames and stacking the materials as directed with all leads, lifts etc. complete. Ground Floor | - | sqm. | - | - |
| 6 | First Floor | - | sqm. | - | - |
| 7 | Dismantling flat wooden or A.C. Sheet ceiling with frame work including stacking the materials as directed with all leads, lifts etc. complete. First Floor | - | sqm. | - | - |
| 8 | Removing urinal pans or wash hand basins with frame including disconnecting the sanitary and water supply connections, removing the same carefully and stacking the serviceable materials as and where directed including throwing the unserviceable materials outside etc complete Ground Floor | - | Nos | 1 | - |
| 9 | First Floor | - | Nos | - | - |
| 10 | Removing W.C. pans including disconnecting the sanitary and water supply connections, removing and breaking flooring and bed con-crete around pan removing the same carefully and stacking the serviceable materials as adn where directed including throwing the unserviceable materiasls out side etc. carefully and throwing out the refusal outside etc. complete. Ground Floor | - | Nos | 1 | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.90 MB
B1.pdf
Tender Documents • 9.05 MB
BOQ_2211927.xls
BOQ • 0.37 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .