| Sl No | Description | Qty | Unit | S N ENTERPRISES L1 | SWITCHGEAR AND TRANSFORMER CARE CENTRE L3 | Calculation Enterprises L2 |
|---|---|---|---|---|---|---|
| 1.00Details of Work. | ||||||
| 1.01Following detailed work is to be done in 132 KV Banda-Banda CKT I Bay at 132 KV S/S Banda:- | ||||||
| 1.02 | Dismantling of 132 KV Line isolators with 1 E/S HBB make post insulator after opening of nut-bolt, opening of jumpers, disconnection of control cable and shifting of dismantlled isolator to store as per instruction of Engineer/In-Charge. | 1 | Nos | 7,800 ₹7,800 | 8,000 ₹8,000 | 7,980 ₹7,980 |
| 1.03 | Erection of 132 KV Line isolators with 1 E/S of different make as per instruction manual and technical specification with post insulator, operating mechanism box, tie rod, arms and proper alignment for smooth operation. This work also included painting of E/S MOM box with green colour, shifting of new isolator from store to site, termination of control cable, jumper connection, earthing(Painted with green color) and all associated work for complete the job as per instruction of Engineer/In-Charge. | 1 | Nos | 18,335 ₹18,335 | 18,500 ₹18,500 | 18,455 ₹18,455 |
| 1.04 | Dismantling of 132 KV Bus isolators HBB/TMG/HLM make with post insulator after opening of nut-bolt, opening of jumpers, disconnection of control cable and shifting of dismantlled isolator to store as per instruction of Engineer/In-Charge. | 1 | Nos | 7,360 ₹7,360 | 7,500 ₹7,500 | 7,480 ₹7,480 |
| 1.05 | Erection of 132 KV Bus isolators of different make as per instruction manual and technical specification with post insulator, operating mechanism box, tie rod, arms and proper alignment for smooth operation. This work also included shifting of new isolator from store to site, termination of control cable, jumper connection, earthing(Painted with green color) and all associated work for complete the job as per instruction of Engineer/In-Charge. | 1 | Nos | 16,300 ₹16,300 | 16,500 ₹16,500 | 16,489 ₹16,489 |
| 2.00Rates qouted by the bidders shall be without taxes. Taxes applicable if any to paid extra | ||||||
Tender Value
Refer Docs
EMD Value
₹1,000
Closing Date
26 Feb 2026, 10:00 amClosed
EE ETD Banda
220 KV Substation Tindwari Road Banda
Electrical Work
2026_UPTCL_1118267_1
T-23/ETDB/2025-26
Open Tender
Electrical Works
30 days
Banda
As per Tender Documents
2 documents required · 2 mandatory
₹590
EE ETD Banda
₹1,000
27 Feb 2026
19 Feb 2026
26 Feb 2026
19 Feb 2026
26 Feb 2026
19 Feb 2026
19 Feb 2026 - 26 Feb 2026
Details of Work.
http://sq.mm/(http://sq.mm/塹ᴻ䡿ⲯ嶂藄挧ꮥ)
http://sq.mm/(http://sq.mm/塹ᴻ䡿ⲯ嶂藄挧ꮥ)
http://sq.mm/(http://sq.mm/塹ᴻ䡿ⲯ嶂藄挧ꮥ)
http://sq.mm/(http://sq.mm/塹ᴻ䡿ⲯ嶂藄挧ꮥ)
http://sq.mm/(http://sq.mm/塹ᴻ䡿ⲯ嶂藄挧ꮥ)
Rates qouted by the bidders shall be without taxes. Taxes applicable if any to paid extra
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.50 MB
BOQ_2078429.xls
BOQ • 0.28 MB
T-23B.pdf
Tender Documents • 0.65 MB
Download all tender documents and submit your bid