Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹7.0 LAdmitted-Fee/PreQual/Technical/Finance | -19.31% | ₹7.0 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹7.3 L+₹37,089.38 (5.33%)Admitted-Fee/PreQual/Technical/Finance | -15.01% | ₹7.3 L+₹37,089.38 (5.33%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹7.3 L+₹37,175.63 (5.34%)Admitted-Fee/PreQual/Technical/Finance | -15.00% | ₹7.3 L+₹37,175.63 (5.34%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹8.7 L
EMD Value
₹17,300
Closing Date
21 Aug 2026, 11:00 amClosed
Municipal Council Jhunjhunu
Municipal Council Jhunjhunu
work no 11
2026_DLB_586413_11
E Nit no 09/2026-27
Open Tender
Civil Works
Percentage
30 days
Municipal Council Jhunjhunu
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
Municipal Council Jhunjhunu
₹17,300
Yes
25 Aug 2026
12 Aug 2026
21 Aug 2026
12 Aug 2026
21 Aug 2026
12 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling old plaster or skirting raking out joints and cleaning the surface for plaster including disposal of rubbish to the dumping ground within 50 metres lead. | 800 | sqm | 33.9 | ₹27,120 |
| 2 | Cement plastering including T&P, scaffolding, material and complete labour, including cost of water, curing, racking of joints etc. with 15
mm cement plaster on the rough side of single or half brick wall of mix : 1:4 (1 cement : 4 fine/ coarse sand) | 800 | sqm | 263.5 | ₹2,10,800 |
| 3 | Painting with synthetic enamel paint of approved brand and manufacture to give an even shade : Two or more coats on new work | 150 | sqm | 114 | ₹17,100 |
| 4 | Finishing walls with Acrylic Smooth exterior paint of required shade :New work (Two or more coat applied @ 1.67 ltr/10 sqm over and including base coat of water proofing cement paint applied @ 2.20 kg/ 10 sqm). | 1,600 | sqm | 144 | ₹2,30,400 |
| 5 | Earth work in excavation in foundation, trenches etc. including dressing of sides and ramming of bottoms, including getting out the excavated material, refilling after laying pipe/ foundation and disposal of surplus excavated material at a lead upto 50m suitable site as per direction of Engineer for following depths, below natural ground / Road top level. In all types soils/ saturated soil such as moorum, sand, sandy silt, clay, black cotton soil, kankar, etc. Depth upto 1.5 m | 5.4 | cum | 229.5 | ₹1,239.3 |
| 6 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level : 1:5:10 (1 cement : 5 fine/ coarse sand : 10 graded stone aggregate 40 mm nominal size). | 1.8 | cum | 4,330 | ₹7,794 |
| 7 | Random rubble masonry with hard stone in foundation and plinth : Cement mortar 1:6 (1 cement : 6 coarse sand) | 6.53 | cum | 4,860 | ₹31,735.8 |
| 8 | Centring and shuttering with plywood or steel sheet upto two stories ( each story of height upto 3.5 metre from floor level) including strutting, propping etc. and removal of form for :Foundations, footings, bases of columns, etc. for mass concrete. | 4 | sqm | 236.5 | ₹946 |
| 9 | Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centring, shuttering, finishing and reinforcement - All work upto plinth level :1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 1.52 | cum | 6,340 | ₹9,636.8 |
| 10 | Carriage of Materials by mechanical transport
including loading, unloading and stacking : Earth for 2.0 Km | 16 | cum | 185.54 | ₹2,968.64 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.86 MB
Tendernotice_2.pdf
PDF • 0.07 MB
BOQ_1041646.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .