| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹26.9 LAccepted-AOC | L1 | Accepted-AOC Lowest | |
| 2 | L2₹29.6 L+₹2.7 L (9.84%)Rejected-AOC 1 6 620 CHAITANYAPURI INDRA NAGAR DILSUKHNAGAR HYDERABAD TELANGANA 500060 UDYAM TS 09 0007870 37AAEPO0535A1Z8 B 36AAEPO0535A1ZA R MSME STATUS AS VERIFIED | RANGA REDDY | TELANGANA | 500060 | L2 | Rejected-AOC Not Lowest | |
| 3 | L3₹30.5 L+₹3.5 L (13.0%)Rejected-AOC | L3 | Rejected-AOC Not Lowest | |
| 4 | L4₹35.7 L+₹8.7 L (32.4%)Rejected-AOC FLAT NO 101 2ND FLOOR RAGHAVENDRA RESIDENCY PLOT NO 1 2 3 SURVEY NO 27 PICKET SECUNDERABAD 500026 | HYDERABAD | TELANGANA | 500026 | L4 | Rejected-AOC Not Lowest | |
| 5 | L5₹36.2 L+₹9.3 L (34.3%)Rejected-AOC | L5 | Rejected-AOC Not Lowest |
Tender Value
₹47.3 L
EMD Value
₹94,600
Closing Date
6 Jan 2020, 6:00 pmClosed
GE UTILITY SECUNDERABAD
GE UTILITY, MUDFORT, SECUNDERABAD-500003
MANNING AND OPERATION BY OUT SOURCING OF EM SERVICES FOR RO PLANT, DG SETS AT PAO OR AOC, PAO OR EME, DAD QTRS, CDA OFFICE AND WATER SUPPLY DISTRIBUTION SYSTEM AT MH SECUNDERABAD, CE FY AND CERTAIN UNITS AT ZONE IIC UNDER AGE EM NO-II OF GE U SEC
2019_MES_306532_1
GE(U)/SEC/TOKEN/38 OF 2019-20
Open Tender
Miscellaneous Works
Item Rate
335 days
SECUNDERABAD
As per NIT
7 documents required · 7 mandatory
₹500
GE UTILITY SECUNDERABAD
₹94,600
Yes
1 Feb 2020
14 Dec 2019
8 Jan 2020
14 Dec 2019
6 Jan 2020
31 Dec 2019
Amount
Manning and operation of Valves, Monoblock pump sets, bore wells for water supply/RO plant and equipment installed at MH secunderabad comppletely in one general shift of 08 hours (eight hours) including saturday, sundays and holidays by deploying the manpower as mentioned below for entire system comprising Raw water feed pump, sand filter, high pressure pump, Dosing system and other connected equipment with LT panel board and operation valve for water supply and operation of submersible pump sets including maintenance of necessary records and documents complete all as specified and directed. (a) Shift timings as under :- (i) General shift :- 0900 hrs to 1730 hrs with 30 minutes lunch break from 1300 hrs to 1330 hrs. (b) Manpower to be employed:- (i) Valve man - 01 No.
Manning and operation of DG set 125 KVA - 01 No and Monoblock pump sets for water supply including vlave operation in one general shift of 08 hrs(eight hours) on all working days excluding sundays and holidays by deploying the manpower as mentioned below for entire system comprising at CDA Office including operation of panel boards, maintenance of necessary records and documents complete all as spefified and directed. (a) Shift timings as under :- (i) General shift :- 0900 hrs to 1730 hrs with 30 minutes lunch break from 1300 hrs to 1330 hrs. (b) Manpower to be employed :- (i) Fitter General Mechanic (FGM) - 01No.
Manning and operation of DG set 125 KVA - 01 No, 100 KVA -01 No and Monoblock pump sets, bore well for water supply including vlave operation in one general shift of 08 hours (eight hours) on all working days excluding sundays and holidays by deploying the manpower as mentioned below for entire system comprising at PAO(OR) AOC and IT SDC office including operation of panel boards, maintenance of necessary records and documents complete all as spefified and directed. (a) Shift timings as under :- (i) General shift :- 0900 hrs to 1730 hrs with 30 minutes lunch break from 1300 hrs to 1330 hrs. (b) Manpower to be employed :- (i) Fitter General Mechanic (FGM) - 01No.
Manning and operation of DG set 125 KVA - 02 Nos and Monoblock pump sets, bore well for water supply including operation of valves in one general shift of 08 hours(eight hours) on all working days excluding sundays and holidays by deploying the manpower as mentioned below for entire system comprising at PAO(OR) EME office including operation of panel boards, maintenance of necessary records and documents complete all as spefified and directed. (a) Shift timings as under :- (i) General shift :- 0900 hrs to 1730 hrs with 30 minutes lunch break from 1300 hrs to 1330 hrs. (b) Manpower to be employed :- (i) Fitter General Mechanic (FGM) - 01No.
Manning and operation of Valves, Monoblock pump sets, bore wells for water supply at CE FY(Hyd), Mechanical laundry Plant, Oil fired incenerator at MH including equipment installed at MH completely in genaral shift of 08 hours (eight hours) including Sundays and holidays, by deploying the manpower as mentioned below for entire system comprising washing machines, Three roll flat work irons, steam boiler, Air compressor, Drying Tumbler, Hydro Extractor, Water pumps including maintenance of faults/complaints including maintenance of necessary reocrds and documents, complete all as specififed and directed. (a) Shift timings as under :- (i) General shift :- 0900 hrs to 1730 hrs with 30 minutes lunch break from 1300 hrs to 1330 hrs. (b) Manpower to be employed :- (i) Fitter General Mechanic (FGM) - 02 Nos.
Manning and operation of DG set 400 KVA-01No, 182.5 KVA-02Nos, 100 KVA-01No, 82.5 KVA -01No and 40 KVA-01No and Monoblock pump set of bore well for water supply including Mani fold system and equipment installed at MH secunderabad and vlave operation in three shifts, each shift of 08 (eight) hours on all working days excluding sundays and holidays by deploying the manpower as mentioned below for entire system comprising at MH Secunderabad including operation of panel boards, maintenance of necessary records and documents complete all as spefified and directed. (a) Shift timings as under :- (i) First shift : 0600 hrs to 1400 hrs (ii) Second shift : 1400 hrs to 2200 hrs (iii) Third shift : 2200 hrs to 0600 hrs (b) Manpower to be employed:- (i) Fitter General Mechanic (FGM) - 03Nos, 01 No for each shift.
Manning and operation of DAD Colony Pump House/Station Workshop Pump House/ water supply in one general shift of 08 (eight) hours including sundays and holidays by deploying the manpower as mentioned bleow for entire system comprising of Pump motor, Over head tank , under ground sump at Station work shop complex, attending minor repairs, operation of Valves at Station work shop, BSO North, CSD Canteen Sub Area for distribution line rectification of faults/complaints with and including operation of panel boards, maintenance of necessary records and documents complete all as spefified and directed. (a) Shift timings as under :- (i) General shift :- 0900 hrs to 1730 hrs with 30 minutes lunch break from 1300 hrs to 1330 hrs (b) Manpower to be employed :- (i) Fitter General Mechanic (FGM) - 01No.
Manning and operation of services for water supply pumping and distribution system including operation of DG Sets in three shifts, each shift of 08 (eight) hours including sundays and holidays at Race Course Pump House (RCPH) by deploying the man power as mentioned below for entire system comprising of pump sets 1X220 HP- 03 Nos, 1X200 HP-02 Nos, 1X180 HP -02 NOs, Vaccume pumps -02 Nos, Submersible pump set-01 No, 625 KVA DG Set -01 No, HT VCB- 250 MVA and 1X500 KVA transformer-02 Nos and connected LT Panel Boards, APFC Panels and connected items such as operation of Sluice Valves of any sizes situated inside/out side the pump houses and maintanance of records and documents complete all as specified ad directed. (a) Shift timings as under :- (i) First shift : 0800 hrs to 1600 hrs. (ii) Second shift : 1600 hrs to 2400 hrs. (iii) Third shift : 2400 hrs to 0800 hrs. (b) Manpower to be employed:- (i) Fitter General Mechanic (FGM) - 03 Nos, 01 No in each shift. (ii) Valve man - 03 Nos, 01 No in each shift
Note for serial item Nos 1 to 8:- (a) Submission of proof of crediting the wages into the bank account / payment made to the employees by the Contractor shall be a pre-requisite to release subsequent payments to contractors. The contractor shall also provide the details of individual’s EPF and ESI account No to claim the RAR / FB payment from time to time. Register for wages, complaints and identity of workers will be maintained by the contractor and will be submitted to the department on monthly basis. (b) The rate quoted is deemed to be inclusive of the cost of complaint slips and registers and cost of T&P for maintainance work of all plants and minor consumables such as gland packing, grease, nut, bolts, PVC insulation tape, screws, fuse wire, clips etc for day to day maintenance including maintaining the records/registers such as Log Sheets, break down register, Plant Running Record Book and Fuel consumption records, area cleaning and maintenance of sub stations including earth pits near sub stations and prunning of tree branches near the eletric over head lines etc for day to day maintenance. (c) The rate quoted is deemed to be inclusive of providing mobile communication system in the complaint cell so that the complaint can be lodged and feed back can be obtained. (d) Stores viz fitting/fixtures, cable etc shall be issued by the department for replacing unserviceable fittings/fixtures, cables etc where required at no extra cost to the Government. The stores to the extent available in the stores shall be issued.
(e) The contractor has to supply uniform to their employees for wearing during the working hours. The unit rate is deemed to include for the uniform. The uniform shall be in blue colour pant and shirt.The pattern of the uniform shall be as decided by the Engineer-in-Charge. (f) Technician/employees employed by the contractor will not work contineously for 07 days. The employees worked for six days contineously should be given one day off with payment as per the contract labour act as referred in condition 58 of IAFW-2249. (g) The contractor is responsible for maintenance of complaint cell for issuing the complaints to the individuals under consultation with concerned JE EM / Engr-in-charge (h) The contractor is responsible for submitting the documents of qualification /experience certificate of the workers to be employed before commencement of work. (j) The fuel viz, for DG set, transformer oil etc shall be issued for free of cost for the operation of plants at the store yard of AGE E/M No II and the rate considered is deemed to include the cost towards men and material for transportation and storage of fuel. (k) The rate considered is deemed to include for 1st hour maintenance of all plants including cleaning and replacement of minor spare parts of unserviceable bolts, nuts and twin washers as and when required. (l) The rate considered is deemed to include the cost towards maintenance of hygienic condition and around the installation. The contractor is fully responsible towards the health of staff employed by him. (m) The contractor will adhere to pay monthly payment cycle to the employees irrespective of RAR/Funds availability with department and same is deemed to be included in quoted rates.
DPS sales and services india
DIESEL POWER SERVICES
L and S ENTERPRISES
Haasith constructions
Brite electricals
Jahnavi enterprices
K LAKSHMAN SINGH AND CO
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .