Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹211.0 CrAccepted-AOC PLAT NO 943 54TH STREET T V S COLONY ANNANAGAR WEST EXTENSION CHENNAI PIN 600 101 | CHENNAI | CHENNAI | TAMIL NADU | 600101 | ₹211.0 Cr Quoted ₹244.8 Cr | L1 | Accepted-AOC 1st lowest |
| 2 | L2₹282.0 CrRejected-AOC | ₹282.0 Cr | L2 | Rejected-AOC 2nd lowest |
Tender Value
₹192 Cr
EMD Value
₹1.9 Cr
Closing Date
21 Dec 2023, 3:00 pmClosed
Chief Engineer, TWAD Board,Madurai
the Chief Engineer, TWAD Board, Ganesh Nagar, Mattuthavani, Madurai
Providing U G S S to Aruppukottai Municipality in Virudhunagar District in Tamil Nadu State Collection System and allied works Construction period of 36 months followed by Trial Run for 6 months and commissioning including 60 months
2023_TWAD_382869_1
UGSS to Aruppukkottai CS
Open Tender
Civil Works
1080 days
Aruppukkottai
As per documents
5 documents required · 5 mandatory
₹0
₹1.9 Cr
Madurai
12 Mar 2024
27 Oct 2023
22 Dec 2023
27 Oct 2023
21 Dec 2023
17 Nov 2023
27 Oct 2023 - 16 Nov 2023
16 Nov 2023
Amount
Providing Under Ground Sewerage Scheme to Aruppukottai Municipality in Virudhunagar District in Tamil Nadu State - Collection System and allied works–Construction period of 36 months followed by Trial Run for 6 months and commissioning including 60 months (5years) operation and maintenance period (E-Submission)
House Service connection for Domestic 28852 Nos - 110 mm UPVC
House Service connection for Commercial - 5210 Nos. - 160 mm UPVC
Construction of Inspection Chamber for House service connection within the property Boundary for Domestic : 0.45m x 0.45m x 0.60m - 43278 nos
Construction of Inspection Chamber for House service connection within the property Boundary for commerical : 0.60m x 0.60m x 0.65m - 7815 nos
Collection System
Construction of Screen well, Grit well and Suction well in Pumping Stations and Lift well Using SRC Cement and River sand
Construction of Lift Manhole for LS 1A, 3A, 3D, Zone 2 and Zone 3
Supply, delivery, erection and commissioning of submersible centrifugal sewage Non-Clog pumps Pumpsets at Main Pumping Station & Sub Pumping Station
Supply, delivery,erection and commissioning of submersible centrifugal sewage non-clog Pumpsets in Lift Stations
Supply, delivery,erection and commissioning of submersible centrifugal sewage non-clog Pumpsets in Lift Manholes
Pumping main
Construction of Pipe carrying Bridge in Pumping Main
Construction of Pump Rooms at Lift Station, SPS and MPS
Construction of Bell Mouth Chamber - 12 Nos
Construction of Valve Chamber of size 5.0 M X 4.0 M - 10 Nos
Construction of Compound wall at lift station site - 15 m x 15 m - 7 Nos and Sub Pumping Station Site - 40 m x 30 m - 3 Nos
Providing Kiosk @ Pedestal for Lift Manholes- 12 Nos - Pedestal Size - 1.20 x 0.75 m
Providing Genset pedestal for Lift station, SPS and MPS
Providing Bathroom and Toilet arrangements with Water supply
General Items – Environmental, Social, Health and Safety (ESHS) Cost Schedule
Maintenance of the scheme for a period of 5 year
Sub Total
GST in 18%
ANCHOR CERAMIC COMPANY PRIVATE LIMITED
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Download all tender documents and submit your bid