| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹20.9 LAccepted-AOC | 1 | Accepted-AOC WORK AWARDED | |
| 2 | 2₹22.0 L+₹21,830 (1.00%)Rejected-AOC SFNO 73 UTHUKULI ROAD MANNARAI TIRUPUR | TIRUPPUR | TAMIL NADU | 638051 | 2 | Rejected-AOC Second Lowest | |
| 3 | 3₹22.2 L+₹42,765.56 (1.96%)Rejected-AOC | 3 | Rejected-AOC Third Lowest |
Tender Value
₹21 L
EMD Value
₹20,500
Closing Date
8 Dec 2023, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
The Special Chief Engineer
The Superintending Engineer, PWD., Buildings Construction and Maintenance Circle,Tiruvannamalai-4.
Provision of 13 Persons Passenger Lift Arrangements to GDP Hall and Additional Office Complex in District Collectorate Campus at Tiruvannamalai in Tiruvannamalai District.
2023_PWD_392788_1
44/TVM-CLE/23-24/1/ Dt.20.11.2023
Open Tender
Electrical Works
Lump-sum
90 days
TIRUVANNAMALAI
Please refer Tender documents.
8 documents required · 8 mandatory
₹0
₹20,500
4 Mar 2024
24 Nov 2023
8 Dec 2023
25 Nov 2023
8 Dec 2023
25 Nov 2023
Amount
Design, Engineering, Fabrication, Supply, Erection, Testing, Commissioning and Handing over of 1No 13 Persons Passenger Lift as per following technical specifications which includes all taxes and duties.(with Machine room) Technical Specifications: Location: 13 Persons Passengers Lift New GDP Hall Colloctor Campus at Tiruvannamalai in Tiruvannamalai District. 1. No of lift: One No. 2. Type of lift: Passengers Lift (Geared) 3. Capacity of lift: 13Persons (884 Kgs) 4. Speed: 1.00mtr / sec 5. Type of drive: Microprocessor based specific variable voltage variable frequency (V3F) drive with enhanced ride comfort and near zero leveling functions. 6. No of floors: Ground+3floors.
7. Total travel: 19.8Mts Servicing Ground+3 floor 4 stops, 4 levels & 4 opening. 8. Leveling accuracy: High level accuracy with smooth and jerk free stopping. 9. Construction of Car: Special car made of stainless steel hairline finish panels complete with single tile false ceiling with direct CFL lighting, tubular handrail, 300mm sweep fan, stretcher impact guard at all three side to prevent the SS damages and for better aesthetics. 10. Position of machine: Directly above the lift well. 11. No of Car entrance – Side opening door with stainless steel No.4 finish with full height infra red door sensor. 12. No of Landing entrance: Side opening door with stainless steel No.4 finish complete with SS frames.(SS 304 grade) 13. No of Entrance: One in front only. 14. Car size:2000mm wide x 1000 mm deep x2400mm height. Clear opening: 1000mmX2000mm height
15. Lift well size :2800 mm wide x 1650mm (existing)deep RCC construction with brick masonry . 16. Lift pit depth :1600 mm 17. Power supply: 415V, Three phase and 230 V 50 Hz single phase AC supply for light. 18. Control: Micro computer based full- collective logic system with / without attendant mode. 19. Car Indicator: Digital 7 segment 1.1mm Height direction & position indicator with height intensity indication in Red color. 20. Lift Machine Room: 3700mm(width) x 5500(depth). 21. Landing Indicator: Digital 7 segment 1.1mm Height direction & position indicator with height intensity indication in Red color 22. Emergency alarm bell: Battery operated alarm bell to be provided with automatic charging .
23. Emergency light: Battery operated light to be provided with automatic charging device. 24. Fire man’s switch: To be provided at ground floor. 25. Minor builders work: To be provided by lift contractor. 26. Scaffoldings: To be provided by lift contractor. 27. Steel for lift machinery: To be provided by lift contractor. 28. Stainless steel sill angles and facial plates: To be provided by lift contractor.
29. Servicing and maintenance: Free comprehensive servicing and maintenance should be provided by lift contractor during the guarantee period of one year. 30. Automatic Rescue Device: To facilitate the landing of the nearest floor at the time of power failure. This shall consist of suitable type battery system with charger, inverter under voltage protection system etc. 31. Lift license: Preparation of drawing, payment of charges to CEIG and insurance policy and obtaining CEIG safety certificate as per lift act should be done by the lift contractor. 32. Floor annunciate with music
33. Special features a) Inverter based battery operated emergency light & alarm bell. b) Stainless steel signal fixtures. c) Aluminum checkered plate flooring. d) Call Registering Type Micro push button.
e) Automatic rescue device. f) Full Collective Logic control g) PCB control push button h) Separate fan switch in the car i) Constant voltage Transformer for control system. j) In built brake release lever k) Pit ladder l) Stretcher impact guard at all three side m) Intercom n) Load weighing device o) Lift floor announcement p) Minor civil works q) Scaffolding r) Obtaining Lift License 34.Special features to be added in the Lifts for people with wide range of abilities should be as per annexure I enclosed. a. Infra red door sensor with full height screen b. Full width half height rear panel mirror c. S.S. hair finish hand rail in car d. Stainless steel signal features e. Vandal proof SS button with SS cover f. S.S. hair finish door frames for landing doors
g. V3F door operator h. Call register signal i. Stainless steel facio plates for car operating panel and landing fixtures j. Steel ladder for Lift machine room k. On / Off switch for fan and light l. Over-load warning indicator with audio Announcer n. Audio announcement in Tamil and english at all floors. m.Voltage stabilizer for control circuit.
35. Over speed governor, phase failure and phase reversal relay, alarm bell, T guide brackets for car and counter weight. Rubber padding under winding unit. Motor of adequate capacity electromagnetic brake with compression springs, car safety gears, buffers, electro mechanical door locks. Emergency key, side supporting angles, motor over load protection devices, final limit switch, main suspension ropes, counter weights etc,. 36. Guarantee: Guarantee for the materials & workmanship of equipments complete should be offered by the lift firm for a period of not less than one year. 37. Site testing in accordance with IS 14665 should be carried out at the time of handing over. (Make: Johnson/Kone/OTIS/Equivalent
GUNASEKARAN
THIAGARAJAN.R
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .