Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹29.8 LAccepted-AOC | L1 | Accepted-AOC Being L1 | |
| 2 | L2₹31.7 L+₹1.8 L (6.15%)Rejected-Finance VPO BAILLY TEHSIL DALHOUSIE DISTT CHAMBA HP PIN 176303 | CHAMBA | HIMACHAL PRADESH | 176303 | L2 | Rejected-Finance Other than L1 | |
| 3 | L3₹32.8 L+₹2.9 L (9.82%)Rejected-Finance NEAR CIVIL HOSPITAL WARD NO 07 VPO CHOWARI DISTT CHAMBA HP 176302 | CHOWARI | CHAMBA | HP | 176302 | L3 | Rejected-Finance Other than L1 | |
| 4 | L4₹39.9 L+₹10.0 L (33.7%)Rejected-Finance | L4 | Rejected-Finance Other than L1 | |
| 5 | L5₹40.5 L+₹10.7 L (35.7%)Rejected-Finance 1ST FLOOR GURJEET MARKET DHANGU ROAD | L5 | Rejected-Finance Other than L1 |
| Sl No | Description | Qty | Unit | pardeep singh marwaha L7 | m/S Varun Gupta L3 | M/S SINGH AND ASSOCIATES L12 | KEWAL SONS L13 | Vijay Kumar Contractor and Engineers L5 | Havish Construction L2 | M/S GOLDEN CONSTRUCIONS L10 | M/s Shakti Electric Works L9 | M/s Northern India Construction co L11 | MS ROSHAN LAL THAKUR L8 | kewal builders L14 | Surya & Gautam Builders L6 | M/S KLM ENTERPRISES L1 | M/s ARJUN SINGH L4 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Excavation in trenches not exc 1.5m wide and not exc 1.5m in depth for foundation etc or for shafts, wells, cesspits, manholes, pier holes etc not exc 10 Sqm on plan and not exc 1.5m in depth in hard/ dense soil and getting out complete all as specified and directed by Engineer in charge. | 26 | Cum | 555 ₹14,430 | 255 ₹6,630 | 260 ₹6,760 | 510 ₹13,260 | 300 ₹7,800 | 250 ₹6,500 | 325 ₹8,450 | 300 ₹7,800 | 610 ₹15,860 | 550 ₹14,300 | 150 ₹3,900 Lowest | 420 ₹10,920 | 200 ₹5,200 | 300 ₹7,800 |
| 2.00 | Material & labour for PCC 1:3:6 type C2 (using 40mm graded crushed stone aggregates) as in foundation, filling and mass concrete. etc complete all as specified and directed by Engineer in charge. | 35.5 | Cum | 5,555 ₹1,97,202.5 | 3,500 ₹1,24,250 | 6,560 ₹2,32,880 | 6,660 ₹2,36,430 | 5,400 ₹1,91,700 | 4,800 ₹1,70,400 | 5,525 ₹1,96,137.5 | 7,000 ₹2,48,500 | 4,560 ₹1,61,880 | 5,500 ₹1,95,250 | 9,000 ₹3,19,500 | 8,000 ₹2,84,000 | 2,500 ₹88,750 Lowest | 4,500 ₹1,59,750 |
| 3.00 | Material & labour for RCC M25 (Design mix) using 20mm graded crushed stone aggregates as in footing etc. complete all as specified and directed by Engineer in charge. | 2.6 | Cum | 8,888 ₹23,108.8 | 6,500 ₹16,900 | 8,060 ₹20,956 | 8,040 ₹20,904 | 7,000 ₹18,200 | 7,500 ₹19,500 | 8,522 ₹22,157.2 | 8,000 ₹20,800 | 6,040 ₹15,704 | 8,000 ₹20,800 | 9,500 ₹24,700 | 10,000 ₹26,000 | 4,000 ₹10,400 Lowest | 8,500 ₹22,100 |
| 4.00 | Material & labour for RCC M-25 (Design mix) using 20mm graded crushed stone aggregates as in columns etc complete all as specified and directed by Engineer in charge. | 3 | Cum | 8,888 ₹26,664 | 6,500 ₹19,500 | 9,560 ₹28,680 | 9,450 ₹28,350 | 8,000 ₹24,000 | 7,800 ₹23,400 | 9,025 ₹27,075 | 9,000 ₹27,000 | 10,000 ₹30,000 | 8,500 ₹25,500 | 10,500 ₹31,500 | 10,000 ₹30,000 | 4,000 ₹12,000 Lowest | 8,500 ₹25,500 |
| 5.00 | Material & labour for Formwork to sides of columns etc. (Rough finished surfaces of concrete) complete all as specified and directed by Engineer in charge. | 12 | Sqm | 888 ₹10,656 | 200 ₹2,400 Lowest | 660 ₹7,920 | 700 ₹8,400 | 500 ₹6,000 | 250 ₹3,000 | 725 ₹8,700 | 650 ₹7,800 | 800 ₹9,600 | 350 ₹4,200 | 800 ₹9,600 | 420 ₹5,040 | 200 ₹2,400 Lowest | 300 ₹3,600 |
| 6.00 | Mild steel TMT bars 10mm dia and over, cut to length, bent to shape required, including cranking, bending spirally for hooping for columns, hooking ends and binding with and including MS wire (annealed) not less than 0.9mm dia or securing with clips complete all as specified and directed by Engineer in charge. | 610 | Kg | 110 ₹67,100 | 95 ₹57,950 | 96 ₹58,560 | 100 ₹61,000 | 110 ₹67,100 | 98 ₹59,780 | 125 ₹76,250 | 90 ₹54,900 | 120 ₹73,200 | 120 ₹73,200 | 80 ₹48,800 Lowest | 120 ₹73,200 | 90 ₹54,900 | 120 ₹73,200 |
| 7.00 | Mild steel TMT bars 5mm dia and over upto and including 10mm dia in stirrups, spacers and binders, cut to length, bent to shape required, including cranking, bending spirally for hooping for columns, hooking ends and binding with and including MS wire (annealed) not less than 0.9mm dia or securing with clips complete all as specified and directed by Engineer in charge. | 90 | Kg | 110 ₹9,900 | 95 ₹8,550 | 96 ₹8,640 | 95 ₹8,550 | 120 ₹10,800 | 98 ₹8,820 | 125 ₹11,250 | 90 ₹8,100 | 85 ₹7,650 | 120 ₹10,800 | 70 ₹6,300 Lowest | 120 ₹10,800 | 90 ₹8,100 | 120 ₹10,800 |
| 8.00 | Material & labour for Rendering 15mm thick in cement mortar 1:4 on concrete surfaces finished even and smooth without using extra cement complete all as specified and directed by Engineer in charge. | 146 | Sqm | 333 ₹48,618 | 255 ₹37,230 | 360 ₹52,560 | 324 ₹47,304 | 280 ₹40,880 | 310 ₹45,260 | 325 ₹47,450 | 350 ₹51,100 | 624 ₹91,104 | 350 ₹51,100 | 450 ₹65,700 | 320 ₹46,720 | 200 ₹29,200 Lowest | 300 ₹43,800 |
| 9.00 | Material & labour for two coat of cement base paint on new plastered surfaces of walls including preparation of surface complete all as specified and directed by Engineer in charge. | 22 | Sqm | 85 ₹1,870 | 45 ₹990 | 60 ₹1,320 | 624 ₹13,728 | 75 ₹1,650 | 50 ₹1,100 | 65 ₹1,430 | 60 ₹1,320 | 424 ₹9,328 | 200 ₹4,400 | 80 ₹1,760 | 70 ₹1,540 | 40 ₹880 Lowest | 100 ₹2,200 |
| 10.00 | Returning, filling in soil including spreading, leveling, watering and well ramming in layers not exc 25cm thick complete all as specified and directed by Engineer in charge. | 7.5 | Cum | 333 ₹2,497.5 | 25 ₹187.5 Lowest | 160 ₹1,200 | 249 ₹1,867.5 | 50 ₹375 | 250 ₹1,875 | 75 ₹562.5 | 100 ₹750 | 349 ₹2,617.5 | 890 ₹6,675 | 120 ₹900 | 296 ₹2,220 | 40 ₹300 | 100 ₹750 |
Tender Value
₹48.2 L
EMD Value
₹96,300
Closing Date
23 Sept 2025, 6:00 pmClosed
Sh Mahajan Singh
GE (AF) Pathankot
PROVN OF GATES AND GUARD POST AT MOTITIBBA PROVN OF ALL WEATHER SHELTER NEAR SUB GUARD ROOM AT 41 WEU B BAKROTA PROVN OF CHAIN LINK FENCING FOR SMQ AREA AT BAKROTA NEAR MES AT MOTITIBBA AND PROVN OF BARBED WIRE FENCING AROUND RANGE AT DAINKUND
2025_MES_729947_1
GE/PAF-68/2025-26
Open Tender
Civil Works
Item Rate
180 days
GE (AF) Pathankot
As per NIT
8 documents required · 8 mandatory
₹500
Yes
GE (AF) Pathankot
₹96,300
Yes
23 Nov 2025
9 Sept 2025
25 Sept 2025
9 Sept 2025
23 Sept 2025
16 Sept 2025
stage.html
html • 0.08 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .