Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹5.3 LAdmitted-Fee/PreQual/Technical/Finance | -26.00% | ₹5.3 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹5.4 L+₹6,432.25 (1.22%)Admitted-Fee/PreQual/Technical/Finance | -25.10% | ₹5.4 L+₹6,432.25 (1.22%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹5.6 L+₹30,731.87 (5.81%)Admitted-Fee/PreQual/Technical/Finance | -21.70% | ₹5.6 L+₹30,731.87 (5.81%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹7.2 L
EMD Value
₹14,300
Closing Date
20 Jul 2026, 4:00 pmClosed
Executive Engineer RnB Division Gurez
Executive Engineer RnB Division Gurez
Construction of Lining wall and Bed treatment of Malik Khul Dawar from RD 1232.01 to RD 1347.01.
2026_PWDJK_315621_1
(INFC) E-NIT No 31 OF 2026-27 EE-RNB-Grz-3228-34 E-tendering Dated-11-07-2026
Open Tender
Civil Works
Percentage
50 days
Gurez
Please refer Tender documents.
5 documents required · 5 mandatory
₹300
Executive Engineer RnB Division Gurez
₹14,300
Executive Engineer RnB Division Gurez
23 Jul 2026
13 Jul 2026
21 Jul 2026
13 Jul 2026
20 Jul 2026
13 Jul 2026
17 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in bulk excavation by manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto1.5m,asdirectedbyEngineer-in-Charge. All kinds of soil : | 51.75 | Cum | 592.9 | ₹30,682.57 |
| 2 | Providing,Laying of Stone Soiling in horizontal all Carriage complete job. | 21.99 | Cum | 1,200 | ₹26,388 |
| 3 | Providing and Laying in position Cement concrete of specified grade including curing but excluding the cost of centering and shuttering.All work upto plinth level with 1:3:6 mix.(Nallah). | 77.63 | Cum | 5,500 | ₹4,26,965 |
| 4 | Cement concrete flooring in 1:2:4 (1 cement: 2coarse sand: 4 graded stone agg., 20mm nominal size finished with a floating coat of neat cement slurry all inclusive leads, lifts, loading, un-loading, head load, cost and carriage of materials from approved nearest sources to site of work complete.50mm thick. | 69 | Sqm | 562.15 | ₹38,788.35 |
| 5 | Centering and shuttering including strutting,propping etc.and removal of form work for foundation,Walls etc. | 276 | Sqm | 286.35 | ₹79,032.6 |
| 6 | 12mm Cement plaster of mix. 1:4(1 cement : 4 sand). | 207 | Sqm | 283.8 | ₹58,746.6 |
| 7 | Carriage og Material by MT incl. Loading,unloading and stacking complete job.
Cement avg.lead for 1km. | 19.58 | MT | 114.44 | ₹2,240.74 |
| 7.01 | Sand avg.lead for 5km. | 38.79 | Cum | 200.74 | ₹7,786.7 |
| 7.02 | Agg. avg.lead for 5km. | 71.84 | Cum | 200.74 | ₹14,421.16 |
| 8 | Carriage of material by Manual means including loading , unloading and stacking complete job.Cement avg.lead for 100mtr. | 19.58 | MT | 133.27 | ₹2,609.43 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.96 MB
BOQ_1024520.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .