| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.1 LAccepted-AOC NANDGAON MAIN ROAD AMLORI DISTT SINGRAULI MP | AMLORI | SINGRAULI | MP | L1 | Accepted-AOC Accepted on L1 basis | |
| 2 | L2₹2.9 L+₹26,203.43 (10.1%)Rejected-Finance KOHRAUL PO YOGICHIOURA DISTT SONEBHADRA UP | L2 | Rejected-Finance Rejected on L2 basis | |
| 3 | L3₹3.0 L+₹38,228.83 (14.7%)Rejected-Finance | L3 | Rejected-Finance Rejected on L3 basis | |
| 4 | L4₹3.9 L+₹1.3 L (49.3%)Rejected-Finance 56 HARSHNAGAR VEER ENGINEERING WORKS ROBERTSGANJ RAILWAY STATION ROAD SONBHADRA UTTAR PRADESH 231216 | SONBHADRA | UTTAR PRADESH | 231216 | L4 | Rejected-Finance Rejected on L4 basis |
Tender Value
₹5.5 L
EMD Value
₹6,900
Closing Date
7 Apr 2025, 11:00 amClosed
GM(Excv), Jayant Project
GM office, Jayant project, Singrauli, M.P-486890
Re-welding and co-axial boring of Boom Bush Housing (LHS and RHS), Crowd clutch Housing, lower swing shaft bearing housing of BE-7 SHOVEL working in East Section.
2025_NCL_333306_1
JNT/GM(Excv)/Etender/24-25/100
Open Tender
Excavation Department Work
Item Rate
32 days
Jayant Project
As per NIT
3 documents required · 3 mandatory
₹6,900
2 Jun 2025
26 Mar 2025
8 Apr 2025
26 Mar 2025
7 Apr 2025
27 Mar 2025
26 Mar 2025 - 30 Mar 2025
Amount
Re-welding and co-axial boring of Boom Bush Housing (LHS and RHS), Crowd clutch Housing, lower swing shaft bearing housing OF BE-7 SHOVEL working in East Section.
Labour charges for Dismantling, Re-welding and assembly of crowd clutch Housing (LHS and RHS) as per scope of work considering labour cost,supervisor cost, profit and any other Cost.
Total cost of undercutting & line boring/Co-axial line boring of LHS and RHS crowd clutch housing as per scope of work having total volume 468.75Cucm as per scope of work in NIT considering labour cost, supervisor cost, profit and any other Cost.
Hiring cost of welding machine
Hiring cost of grinding machine
Transpotation cost for movement of tools & manpower
Labour charges for Dismantling, Re-welding and assembly of LHS swing shaft lower bearing housing as per scope of work considering labour cost,supervisor cost, profit and any other Cost.
Total cost of undercutting & line boring/Co-axial line boring of LHS swing shaft lower bearing housing as per scope of work having total volume 395.06 Cucm as per scope of work considering labour cost, supervisor cost, profit and any other Cost.
Hiring cost of welding machine
Hiring of grinding machine
Transpotation cost for movement of tools & manpower
Labour charges for Dismantling, Re-welding and assembly of Boom Bush Housing (LHS and RHS) as per scope of work considering labour cost,supervisor cost, profit and any other Cost.
Total cost of undercutting & line boring/Co-axial line boring of LHS & RHS boom bush housing as per scope of work having total volume 2549.89 Cucm as per scope of work considering labour cost, supervisor cost, profit and any other Cost.
Hiring cost of welding machine
Hiring cost of grinding machine
Transpotation cost for movement of tools & manpower
Total impact of GST for the purpose of CTC
SHASHI ENGINEERING WORKS (BID ID -1147379)
MEENA ENGINEERING (BID ID -1145338)
Veer Engineering Works (BID ID -1147302)
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .