Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.6 LAccepted-AOC CIRCUS MAIDAN NATHUCHATI BANKURA W B | BANKURA | BANKURA | WEST BENGAL | L1 | Accepted-AOC Accepted | |
| 2 | L2₹1.6 L+₹146.82 (0.09%)Rejected-Finance RAMPUR HAZRA LANE BANKURA W B | BANKURA | BANKURA | WEST BENGAL | L2 | Rejected-Finance Rejected | |
| 3 | L3₹1.6 L+₹338.70 (0.21%)Rejected-Finance 334 1 SCHOOLDANGA BANKURA 722101 | BANKURA | WEST BENGAL | 722101 | L3 | Rejected-Finance Rejected |
Tender Value
Refer Docs
EMD Value
₹4,000
Closing Date
16 Aug 2024, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Assistant Engineer
O/O AE, BMSD(W/S), PHE Dte, Ailakundi, Bankura
Withdrawing Lowering of pump motor set for replacement of defective GI column pipe at OHR site ,Switch room 3 and 5 of Chuamosina Zone-A (BRGF phase-I) water supply scheme under Bankura Mechanical Division,P.H.E. Dte.
2024_PHED_711311_7
WBPHED/AE/BMSD/NIeT- 4 OF 2024-2025
Open Tender
MECHANICAL
Item Rate
10 days
Bankura
Please refer Tender documents.
5 documents required · 5 mandatory
₹4,000
Yes
12 Mar 2025
16 Jul 2024
20 Aug 2024
16 Jul 2024
16 Aug 2024
16 Jul 2024
Amount
OHR site
Hiring charges of Hiring charges for temporary tripod type derrick arrangement by the SAL bullah with necessary tools & tackles & positioning the same on top centre of the T/W Tools like Chain Pulley (3ton capacity), Chain Tang , nylon rope as per requirement fishing tools by supplying necessary materials as per direction of EIC.
Withdrawing of the 7.5 H.P. submersible pump and motor set along with column pipe after disconnection of pipe line and power line by help of derrick arrangement of the manual labour complete the job as per direction of EIC.
Supply and delivery of following materials at site:-
i) 80 mm dia UPVC Column pipe with both side threaded and one side socketed, Make – Ashirbad/Aroma
a) 3.05Mtr. long .
b) 1.5 mtr long
ii). 80 mm dia Top and bottom adopter(M.S)
iii) 80 mm dia suspension clamp with necessary nut bolts. Size 300mmx80mmx8 mm).
iv) 65x150 mm nipple GI
v) Safety device for the above pump set by supplying MS cage with proper clamping arrangement and round twisted machne made nylon rope 20mm dia (super quality) as per requirement including supply of all requied materials with nuts and bolts as required.
Lowering of the newly supplied submersible pump motor set stage by stage by means of chain pulley block arrangement and making safety arrangement by fitting fixing of nylon rope and making power line and supply main line connection, interconnection with the delivery line all complete as per direction of E.I.C.
Switch Room 5
Carrying charges (to and fro) of Deptt supply Pump motor set ,16 sq mm Al.Ar. Cable from BMSD office store to site at chuamosina zone-A including loading unloading charges.
Withdrawing of the 10 H.P. submersible pump and motor set along with column pipe after disconnection of pipe line and power line by help of derrick arrangement of the manual labour complete the job as per direction of EIC.
Supply and delivery of following materials at site:-
i) 80 mm dia UPVC Column pipe with both side threaded and one side socketed, Make – Ashirbad/Aroma
a) 3.05Mtr. long .
b) 1.5 mtr long
ii). 80 mm dia Top and bottom adopter(M.S)
iii) 80 mm dia suspension clamp with necessary nut bolts. Size 300mmx80mmx8 mm).
iv) 80 mm GI socket.
vii) Safety device for the above pump set by supplying MS cage with proper clamping arrangement and round twisted machne made nylon rope 20mm dia (super quality) as per requirement including supply of all requied materials with nuts and bolts as required.
Lowering of the newly supplied submersible pump motor set stage by stage by means of chain pulley block arrangement and making safety arrangement by fitting fixing of nylon rope and making power line and supply main line connection, interconnection with the delivery line all complete as per direction of E.I.C.
Supply and fitting fixing motor starter working voltage (415+-10) ,relay range 13-21 with protection of u/v, phase reversal on wall and making power line connection as per direction.Model MUG 10 or similar type.as per approved list.
Laying of 16 sq mm 3 core Al.Ar cable after earth work of underground trench section 750x250 mm and ramming dressing after laying of cable as per direction.
Switch Room 3
Withdrawing of the 7.5 H.P. submersible pump and motor set along with column pipe after disconnection of pipe line and power line by help of derrick arrangement of the manual labour complete the job as per direction of EIC.
Supply and delivery of following materials at site:-
i) 80 mm dia UPVC Column pipe with both side threaded and one side socketed, Make – Ashirbad/Aroma
a) 3.05Mtr. long .
b) 1.5 mtr long
ii). 80 mm dia Top and bottom adopter(M.S)
iii) 80 mm dia suspension clamp with necessary nut bolts. Size 300mmx80mmx8 mm).
iv) 65x80 mm R/Socket GI
v) 65x150 mm nipple GI
vi) 80 mm GI socket.
vii) Safety device for the above pump set by supplying MS cage with proper clamping arrangement and round twisted machne made nylon rope 20mm dia (super quality) as per requirement including supply of all requied materials with nuts and bolts as required.
Lowering of the newly supplied submersible pump motor set stage by stage by means of chain pulley block arrangement and making safety arrangement by fitting fixing of nylon rope and making power line and supply main line connection, interconnection with the delivery line all complete as per direction of E.I.C.
Add: 18% GST
Add: 1% Cess
ABHIJIT MUKHERJEE (BID ID -5391598)
TAPAN KUMAR SARKAR (BID ID -5391726)
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .