Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹21.9 LAccepted-AOC | ₹21.9 L | L1 | Accepted-AOC LER |
| 2 | L2₹22.1 LRejected-Finance NO 13 273 FIRST FLOOR MIG MARUTHAM NEW HOUSING UNIT THANJAVUR 613005 | THANJAVUR | THANJAVUR | TAMIL NADU | 613005 | ₹22.1 L | L2 | Rejected-Finance AER |
| Sl No | Description | Qty | Unit | Durairaj Jeevagan L2 | K Banudoss L1 |
|---|---|---|---|---|---|
| 1.00Providing Paver Block road @ Balaji Residency in Melaveli panchayat. Thanjavur Union . | |||||
| 2.00 | Earth work excavation in all class of Soil except hard rock requiring blasting with intial lead and lift etc. Complete for foundation as per SS 20B. | 57.6 | Cum | 133.54 ₹7,691.9 | 131.81 ₹7,592.26 Lowest |
| 3.00 | Supplying and filling with Good river sand including Cost and conveyance, labour charges etc, Complete., | 14.4 | Cum | 2,242.08 ₹32,285.95 | 2,213.07 ₹31,868.21 Lowest |
| 4.00 | Cement Concrete.1:4:8 Mix using 40mm HBG metal including cost & conveyance & Labour charges etc, Complete.,. | 14.4 | Cum | 6,064.24 ₹87,325.06 | 5,985.78 ₹86,195.23 Lowest |
| 5.00 | Cement Concrete.1:3:6 Mix using 20mm HBG metal including cost & conveyance & Labour charges etc, Complete.,. | 44.16 | Cum | 6,824.68 ₹3,01,377.87 | 6,736.38 ₹2,97,478.54 Lowest |
| 6.00 | Supply and erection of Steel Centering and all labour Charges etc.complete | 384 | Cum | 554.34 ₹2,12,866.56 | 547.17 ₹2,10,113.28 Lowest |
| 7.00 | Construction of Granular Sub base by providing well graded material (25 mm to 4.75 mm IRC HBG metal @ 65 %,4.75 to 2.36mm IRC HBG metal @20%&2.36 mm below IRC HBG metal @15%)& (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 25 & 6% repectively) spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotovator at OMC and compacting with three wheel 80-100 KN capacity and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method) . | 131.6 | Sqm | 2,990.35 ₹3,93,530.06 | 2,951.66 ₹3,88,438.46 Lowest |
| 8.00 | Providing and Laying of Interlocking Rubber moulded Hydraulic pressed Paver block Pavements specification clause 1504, M30 grade 63 mm thickness paver block | 1,052.8 | Sqm | 795.51 ₹8,37,512.93 | 785.22 ₹8,26,679.62 Lowest |
| 9.00 | Supply and fixing of 90mm dia 6ksc pvc pipe including cost and conveyance of all labour charges etc., completed. | 20 | RM | 199.26 ₹3,985.2 | 196.68 ₹3,933.6 Lowest |
| 10.00 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package} | 1 | GST Amount (in Rupees) | 3,37,784 ₹3,37,784 | 3,33,414 ₹3,33,414 Lowest |
Tender Value
₹22.2 L
EMD Value
₹22,160
Closing Date
23 Dec 2025, 3:00 pmClosed
Block Development Officer (BP), Thanjavur
Block Development Officer (BP), Thanjavur
Thanjavur District Thanjavur Block Providing paver Block Road at Balaji Residency in Melaveli panchayat.of Thanjavur Union. of Thanjavur Union.under Panchayat Union General Fund 2025-2026
2025_RDTN_632406_1
Rc.No.3401/2025/ A2/dated 08.12.2025
Open Tender
Civil Works
Item Rate
6 days
Thanjavur
Please refer Tender documents.
8 documents required · 8 mandatory
₹0
₹22,160
20 Jun 2026
15 Dec 2025
23 Dec 2025
15 Dec 2025
23 Dec 2025
15 Dec 2025
Providing Paver Block road @ Balaji Residency in Melaveli panchayat. Thanjavur Union .
Earth work excavation in all class of Soil except hard rock requiring blasting with intial lead and lift etc. Complete for foundation as per SS 20B.
Supplying and filling with Good river sand including Cost and conveyance, labour charges etc, Complete.,
Cement Concrete.1:4:8 Mix using 40mm HBG metal including cost & conveyance & Labour charges etc, Complete.,.
Cement Concrete.1:3:6 Mix using 20mm HBG metal including cost & conveyance & Labour charges etc, Complete.,.
Supply and erection of Steel Centering and all labour Charges etc.complete
Construction of Granular Sub base by providing well graded material (25 mm to 4.75 mm IRC HBG metal @ 65 %,4.75 to 2.36mm IRC HBG metal @20%&2.36 mm below IRC HBG metal @15%)& (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 25 & 6% repectively) spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotovator at OMC and compacting with three wheel 80-100 KN capacity and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method) .
Providing and Laying of Interlocking Rubber moulded Hydraulic pressed Paver block Pavements specification clause 1504, M30 grade 63 mm thickness paver block
Supply and fixing of 90mm dia 6ksc pvc pipe including cost and conveyance of all labour charges etc., completed.
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.73 MB
BOQ_756597.xls
BOQ • 0.28 MB
TechnicalBidpaverbalaji.pdf
Tender Documents • 0.49 MB
PriceBidpaverbalaji.pdf
Additional Documents • 0.36 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].