| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.9 CrAccepted-AOC KOKRAJHAR BTC | KOKRAJHAR | ASSAM | 783332 | ₹3.9 Cr | L1 | Accepted-AOC lowest quoted bidder |
| 2 | Rejected-Technical BISHNU RABHA NAGAR NOONMATI GUWAHATI 20 | - | - | Rejected-Technical documents not found in order |
| Sl No | Description | Qty | Unit | GANPATI ASSOCIATES L1 |
|---|---|---|---|---|
| 1.00 | [§ Item No.: 23.4]:- Preparing / making level the ground surface for layout of Headwork / structures for fixing the required axis line by cutting the high land and filling and levelling the low land where necessary etc, complete as directed. | 1,345 | m2 | 135.93 ₹1,82,825.85 Lowest |
| 2.00 | [§ Item No.: 6.25]:- Earthwork in excavation in foundation of head work in all types of soil as per design and drawing including dressing the foundation, shoring etc. removing the surplus spoils by head load to safe distance from the working place and depositing the required spoils in uniform layers, dressing, watering, breaking clods to not more than 10 mm cube with compensation, complete as directed at site. (Including bailing out stagnant rain
water where necessary) | 5,344.65 | m2 | 652.82 ₹34,89,094.41 Lowest |
| 3.00 | [§ Item No.: 20.2]:- Providing and driving 'Z' type steel sheet pile of 0.69 M effective width, 8 mm thick and average weight 68.30 kg/M to specified level and lines including cutting to proper size, making holes including painting sheet piles with two coats of anticorrosive bitumen paint and dewatering including necessary tools and plants and all other accessories, complete as directed. (Portion of sheet pile are to be embedded in concrete shall not be painted) | 10.04 | MT | 2,62,204.12 ₹26,32,529.36 Lowest |
| 4.00 | [§ Item No.: 127 (c)]:- Carriage of Z type sheet piles from departmental Godown (Kokrajhar) to work site including loading unloading and stacking at suitable safe place. | 10.04 | MT | 7,619.24 ₹76,497.17 Lowest |
| 5.00 | [§ Item No.: 126]:- Labour for placing in position of imported Z – type sheet piles including cutting to proper size and making holes etc. and driving it to the specified level and lines including painting sheet piles with two coats of anti – corrosive paints (piles to be embedded shall not be painted) including carriage from Departmental Godown complete as directed. | 101.42 | sqm | 11,238.54 ₹11,39,812.73 Lowest |
| 6.00 | [§ Item No.: 10.4B (i)]:-CC work in proportion 1:4:8 in foundation / abutment / piers / wing walls etc. shingles of size 13 mm to 38 mm including curing with necessary timber shuttering, scaffolding etc. where necessary, complete as directed. (Shuttering, scaffolding cost will be paid separately) | 156.97 | m3 | 7,742.4 ₹12,15,324.53 Lowest |
| 7.00 | [§ Item No.: 10.2:A:(ii)] CC work in proportion 1:2:4 in foundation / abutment / piers / wing walls etc.
with hard broken stone aggregate of size 6 mm to 20 mm including curing, dewatering with necessary timber shuttering, scaffolding etc. where necessary complete as directed. (Shuttering, scaffolding cost will be paid separately) | 95.75 | m3 | 11,324.07 ₹10,84,279.7 Lowest |
| 8.00 | [§ Item No.: 10.2:A:(ii)] CC work in proportion 1:2:4 in foundation / abutment / piers / wing walls etc.
with hard broken stone aggregate of size 6 mm to 20 mm including curing, dewatering with necessary timber shuttering, scaffolding etc. where necessary complete as directed. (Shuttering, scaffolding cost will be paid separately) | 798.81 | m3 | 11,324.07 ₹90,45,780.36 Lowest |
| 9.00 | [§ Item No.: 12.1.(ii)]:- RCC work in slab, abutment cap and above abutment, pier cap, pedestals, dirtwall etc. in proportion 1:1½:3 with hard broken stone aggregate of size 6 mm to20 mm with proper reinforcement as per design including necessary curing, dewatering etc. complete as directed with necessary timber shuttering, scaffolding etc. where necessary, complete as directed. (Shuttering, scaffolding cost will be paid separately). | 579.54 | m3 | 12,997.93 ₹75,32,820.35 Lowest |
| 10.00 | [§ Item No.: 12.4 ] Supplying fitting fixing and laying reinforcement (TATA) in position in RCC work including cutting, bending, cranking with two piles 0.91 M (20 BWG) annealed wire hooking tying, complete as directed. | 220.21 | qtl. | 13,661.96 ₹30,08,500.21 Lowest |
Tender Value
₹3.9 Cr
EMD Value
₹7.8 L
Closing Date
23 Dec 2025, 3:00 pmClosed
Addl. Chief Engineer cum CHD Irrigation, BTC Kokra
O/o the Addl. Chief Engineer cum CHD, Irrigation, BTC, Kokrajhar
Construction of Head Works, Diversion Channel and Closing Bund, Approach Road and Sign Board at Muthra FIS under PMKSY (HKKP) for the year 2021-2022
2025_BoTC_48964_7
ACE/CHDI/10/2025/18 dated 01/12/2025
Open Tender
Civil Works
Works
365 days
Suklai
Please refer Tender documents.
3 documents required · 3 mandatory
₹7,800
₹7.8 L
Yes
O/o the Addl. Chief Engineer cum CHD, Irrigation,
12 Jan 2026
2 Dec 2025
24 Dec 2025
2 Dec 2025
23 Dec 2025
5 Dec 2025
8 Dec 2025
Amount
[§ Item No.: 23.4]:- Preparing / making level the ground surface for layout of Headwork / structures for fixing the required axis line by cutting the high land and filling and levelling the low land where necessary etc, complete as directed.
[§ Item No.: 6.25]:- Earthwork in excavation in foundation of head work in all types of soil as per design and drawing including dressing the foundation, shoring etc. removing the surplus spoils by head load to safe distance from the working place and depositing the required spoils in uniform layers, dressing, watering, breaking clods to not more than 10 mm cube with compensation, complete as directed at site. (Including bailing out stagnant rain water where necessary)
[§ Item No.: 20.2]:- Providing and driving 'Z' type steel sheet pile of 0.69 M effective width, 8 mm thick and average weight 68.30 kg/M to specified level and lines including cutting to proper size, making holes including painting sheet piles with two coats of anticorrosive bitumen paint and dewatering including necessary tools and plants and all other accessories, complete as directed. (Portion of sheet pile are to be embedded in concrete shall not be painted)
[§ Item No.: 127 (c)]:- Carriage of Z type sheet piles from departmental Godown (Kokrajhar) to work site including loading unloading and stacking at suitable safe place.
[§ Item No.: 126]:- Labour for placing in position of imported Z – type sheet piles including cutting to proper size and making holes etc. and driving it to the specified level and lines including painting sheet piles with two coats of anti – corrosive paints (piles to be embedded shall not be painted) including carriage from Departmental Godown complete as directed.
[§ Item No.: 10.4B (i)]:-CC work in proportion 1:4:8 in foundation / abutment / piers / wing walls etc. shingles of size 13 mm to 38 mm including curing with necessary timber shuttering, scaffolding etc. where necessary, complete as directed. (Shuttering, scaffolding cost will be paid separately)
[§ Item No.: 10.2:A:(ii)] CC work in proportion 1:2:4 in foundation / abutment / piers / wing walls etc. with hard broken stone aggregate of size 6 mm to 20 mm including curing, dewatering with necessary timber shuttering, scaffolding etc. where necessary complete as directed. (Shuttering, scaffolding cost will be paid separately)
[§ Item No.: 10.2:A:(ii)] CC work in proportion 1:2:4 in foundation / abutment / piers / wing walls etc. with hard broken stone aggregate of size 6 mm to 20 mm including curing, dewatering with necessary timber shuttering, scaffolding etc. where necessary complete as directed. (Shuttering, scaffolding cost will be paid separately)
[§ Item No.: 12.1.(ii)]:- RCC work in slab, abutment cap and above abutment, pier cap, pedestals, dirtwall etc. in proportion 1:1½:3 with hard broken stone aggregate of size 6 mm to20 mm with proper reinforcement as per design including necessary curing, dewatering etc. complete as directed with necessary timber shuttering, scaffolding etc. where necessary, complete as directed. (Shuttering, scaffolding cost will be paid separately).
[§ Item No.: 12.4 ] Supplying fitting fixing and laying reinforcement (TATA) in position in RCC work including cutting, bending, cranking with two piles 0.91 M (20 BWG) annealed wire hooking tying, complete as directed.
[§ Item No.: 9.1.C]:- Centering and shuttering including propping etc where necessary and removal of forms after completion of CC and RCC works, complete as directed. (Measurement to be taken on the face area timbered).
[§ Item No.: 8.1]:- Providing scaffolding work with rows of bhaluka bamboo and jati bamboo horizontal one row jati bamboo cross and placing second class planks of 0.025 M thick in between the rows tying with coir strings lacing two nos. vertical jati bamboo at both end including dismantling the scaffolding etc, complete as directed.
[§ Item No.: 1.60]:- Collection of sand gravel (40% sand and 60% gravel of gravel of size 25 mm to 60 mm) free from dust and dirt including stacking in measurable stacks at quarry site and as directed complete as directed.
[§ Item No.: 23.16]:- Supplying and laying of filter materials consisting of sand and river shingles free from dust dirt and other foreign materials and laying in three layers in position as per drawing and specification as directed by the department.
[§ Item No.: 23.14] Labour charges for spreading hard river shingles / sand gravels to required thickness over approach subway etc. including ramming, dressing the seat before laying the materials lead upto 30 M and lift 1.5 M, complete as directed.
[§ Item No.::5(a):-Collection and supply of one man size river blasted boulder from the Quarry to different work site including loading and unloading and stacking in measurable stack at site etc. complete as directed. (size 25 cm to 30cm)(Distance=40 K.M) a)River Boulder
[§ Item No.: 6.27] Earthwork in back filling of structures, obtained from outside borrow pits filling in 15 cm layers, ramming, dressing, watering, including paying compensation of land if any (with lead up to 30 M and lift 1.5 M).
[§ Item No.: 7.1(ii)]:- Dewatering of CC works considering 1 no. 10 HP and 1 no. of 5 HP pump including POL, carriage and operator's pay etc. (ii) With Contractor's Profit & GST
[§ Item No.: 23.3]:-Providing 75 mm dia. Weep Holes including supplying and fixing 75 mm dia PVC pipe in weep holes, complete as directed.
Item No. 23.9 :Supplying 1 1/2" dia GI pipe for hand railing including fitting & fixing the same in position etc, complete as directed.
[§ Item No.: 128]:- Supplying, fitting, fixing of steel gate of cross & Head Regulator as per design & drawing & specification including supplying of steel beams, channel section, Rubber seal etc including all materials embedded partly where necessary & manually operated chorister equip mints including carriage of all materials to work site complete.
Diversion Head Channel [§ Item No.: 6.3]:-Earthwork in excavation in diversion / feeder channel to the design section and grade by depositing the spoils in the form of an embankment on either side to the design section and grade in layers not exceeding 15 cm thick including clearing light jungle and trees upto 15 cm dia and uprooting roots and stumps etc. from the seat of the embankment and canal and free from all vegetation including breaking clods not more than 10 mm cube, ramming, dressing, bailing out stagnant rain water necessary complete as directed with a lead upto 30 M and lift upto 1.50 M (B) In hard Soil (i) (i) Soil mixed with gravel or morum upto 50 mm size
[§ Item No.: 6.27]:- Earthwork in back filling of structures, obtained from outside borrow pits filling in 15 cm layers, ramming, dressing, watering, including paying compensation of land if any (with lead up to 30 M and lift 1.5 M). Quantity for cutting of Diversion Channel from Item No. 1
[§ Item No. 7.1]:- Cost of dewatering in excavation of earthwork by running required no. of pumps including the cost of POL, hire charge, labour charge etc. and handling for a depth of maximum 3.2 M, complete as directed. i) 5 H.P Diesel pump
ii) 10 HP Diesel Pump
Cofferdam (Closing Bund) [§ Item No.: 21.5.(A)]:-Construction of whole bamboo single pallasiding with matured bhaluka bamboo post 7.5 cm to 10 cm dia 5 cm apart 1.5 M to 1.8 M above ground and 1 M to 1.2 M below ground with jati bamboo struts placed 1.2 M to 1.5 M apart tied RM Rs. 833.35 with galvanized wire with 16 G to 18 G complete with 3 rows of horizontal half jati bamboo kamies, complete as directed.
[§ Item No.: Ch-4_9]:-Supplying and laying cement bags filled with sand , earth (as locally available) including stitching the mouth ,laying, fixing in position as directed complete with supply of bags sutlies etc. all complete.
[§ Item No.: Ch-4_10]:- Labour charge for filling the cement bag with sand /earth (as locally available) including the same laying in position etc. all complete as directed.(Empty cement bag to be supplied by the department)
[§ Item No.: 6.3]:-Earthwork in excavation in diversion / feeder channel to the design section and grade by depositing the spoils in the form of an embankment on either side to the design section and grade in layers not exceeding 15 cm thick including clearing light jungle and trees upto 15 cm dia and uprooting roots and stumps etc. from the seat of the embankment and canal and free from all vegetation including breaking clods not more than 10 mm cube, ramming, dressing, bailing out stagnant rain water necessary complete as directed with a lead upto 30 M and lift upto 1.50 M (A) In ordinary Soil
[§ Item No.: 6.27]:- Earthwork in back filling of structures, obtained from outside borrow pits filling in 15 cm layers, ramming, dressing, watering, including paying compensation of land if any (with lead up to 30 M and lift 1.5 M).
Construction of Approach Road cum left bank Afflux bund Item No. 1:6.26: Earthwork in filling in Marginal bund / Guide bank / Afflux bund / Canal embankment etc. to the design section and grade by obtaining earth from outside borrow pits and filling in uniform layer not exceeding 15cm thick including clearing light jungle, removing trees upto 15 cm dia and uprooting roots and stumps from the seat at embankment and borrow pit area, breaking clods not more than 10mm cube, ramming, watering, dressing and roughening the seat of embankment, profiling etc. Paying compensation of earth borrowed from private or forest land if any, lead upto 30 M and lift upto 1.5 M complete as directed.
Item No. 2 : 1.6: Collection and supply of sand and gravel (40% sand and 60% gravel) of size 13mm to 38mm from approved quarry including loading, unloading and stacking in measurable stacks at work site up to a height of 1.00m including payment of forest royality etc.
Item No. 3: 2.1: Carriage of boulders, gravels, metal screening, stacking in measurable stacks at site, complete as directed. (A) For normal road upto 25.0 Km (ii) With Contractor's Profit & VAT
Item No. 4 : Labour charges for spreading hard river shingles / sand gravels to required thickness over approach subway etc. including ramming, dressing the seat before laying the materials lead upto 30.00 M and lift 1.50 M. Complete as directed.
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.75 MB
BOQ_77766.xls
BOQ • 0.34 MB
SBD7.pdf
Tender Documents • 1.56 MB
7.pdf
Tender Documents • 0.51 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .