| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹32.5 LAdmitted-Finance | ₹32.5 L | L1 | Admitted-Finance |
| 2 | L2₹35.5 LAdmitted-Finance | ₹35.5 L | L2 | Admitted-Finance |
| 3 | L3₹38.4 LAdmitted-Finance | ₹38.4 L | L3 | Admitted-Finance |
| 4 | L4₹39.0 LAdmitted-Finance | ₹39.0 L | L4 | Admitted-Finance |
| 5 | L5₹39.3 LAdmitted-Finance CIVIL LINE MATATILA ROAD TALBEHAT DISTT LALITPUR U P | TALBEHAT | LALITPUR | U P | ₹39.3 L | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | HARNAM SINGH ANIL SINGH L5 | PADAMSHRI CONSTRUCTION CO L1 | M/S VAIBHAV ENTERPRISES L3 | AJIT ENTERPRISES L2 | M/S AJAY JAIN L4 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Taking down existing water proofing treatment of any description incl PCC padding,/ or cement work any thickness from roof surfaces, cleaning of roof and prepairing it for further treatment incl make good necessary dubbing out wherever required and removing rubbish from site complete all as specified and directed. | 3,536 | Sqm | 40 ₹1.4 L | 38 ₹1.3 L | 20 ₹70,720 | 12 ₹42,432 | 20 ₹70,720 |
| 2.00 | Material and Labour for Brushing neat cement slurry with 3.0 kg of cement per sq. metre complete all as specified and as directed. | 3,536 | Sqm | 35 ₹1.2 L | 25 ₹88,400 | 52 ₹1.8 L | 18 ₹63,648 | 50 ₹1.8 L |
| 3.00 | Matrial and Labour for Cement Concrete 1:2:4 Type B-0 (12.50 mm Graded Stone aggregate in padding, finishing surface concrete topping even and fair (without using extra cement) of average thickness 40 mm in slope as required over roof complete all as specified and as directed. | 3,000 | Sqm | 200 ₹6 L | 200 ₹6 L | 233 ₹7.0 L | 219 ₹6.6 L | 150 ₹4.5 L |
| 4.00 | Material and Labour for Providing, cement concrete of Type in roof kerbs on roof or mud stops, rounded or chamfered on edges complete all as specified and as directed By Engineer-in-Charge | 5 | Cum | 6,000 ₹30,000 | 5,000 ₹25,000 | 5,000 ₹25,000 | 5,500 ₹27,500 | 4,000 ₹20,000 |
| 5.00 | Material and Labour for 10 mm thick Plastering in CM 1:4 on concrete roof surfaces using water proofing compound @ 3% by weight of cement and finishing the surface even and fair. WPC will be measured separately. | 3,000 | Sqm | 180 ₹5.4 L | 180 ₹5.4 L | 155 ₹4.7 L | 165 ₹5.0 L | 220 ₹6.6 L |
| 6.00 | Supply only liquid waterproofing compound ISI Marked all as specified and as directed. | 120 | Kg | 100 ₹12,000 | 80 ₹9,600 | 155 ₹18,600 | 45 ₹5,400 | 70 ₹8,400 |
| 7.00 | Material and Labour for Applying evenly two coat of industrial bitumen 85/25 at the rate of 1.2 kg per sq.m incl cleaning surface complete all as specified and as directed. | 3,536 | Sqm | 100 ₹3.5 L | 89 ₹3.1 L | 75 ₹2.7 L | 135 ₹4.8 L | 160 ₹5.7 L |
| 8.00 | Material and Labour for APP based polymeric membrane minimum weighing 3kg/sqm and minimum 3mm thick reinforced with polyster non wove fabric, (as per sample approved by the GE) land on primed surface by forced application complete all as specified. | 3,536 | Sqm | 450 ₹15.9 L | 310 ₹11.0 L | 425 ₹15.0 L | 340 ₹12.0 L | 420 ₹14.9 L |
| 9.00 | Material and Labour for Preparation of newly laid APP membrane roof treatment over 10 cm width or girth and applying two coats of aluminium paint complete all as specified and as directed. | 3,536 | Sqm | 50 ₹1.8 L | 40 ₹1.4 L | 62 ₹2.2 L | 69 ₹2.4 L | 30 ₹1.1 L |
| 10.00 | Supply and Fixing in Repair Rotational moulded polyethylene water storage tanks of capacity 1000 Ltrs (Including Dismantling of Existing Tanks (cylindrical vertical with closed top) hoisted and fixed in position all as specified in SSR Part I, including making necessary arrangements for fixing inlet, outlet and overflow pipe and provision of wash out pipe etc and 20 mm ball valves High Pressure PTMT with epoxy coated aluminium rod and high density plastic ball complete. | 15 | Each | 8,000 ₹1.2 L | 6,200 ₹93,000 | 5,858 ₹87,870 | 7,500 ₹1.1 L | 8,000 ₹1.2 L |
Updated dates
Tender Value
₹47.6 L
EMD Value
₹96,000
Closing Date
21 May 2026, 6:00 pmClosed
Shri Ankit Goyal, IDSE
Class-D, Category a (i) and as per NIT documents
SPECIAL REPAIR OF WATER PROOFING TREATMENT TO THE ROOF AND CHAJJA OF OFFRS MD ACCN AT DRONACHAL UNDER GE DRONACHAL
2026_MES_761749_1
8992/E8
Open Tender
Civil Works
180 days
BHOPAL
Please refer Tender documents.
7 documents required · 7 mandatory
₹500
GARRISON ENGINEER DRONACHAL
₹96,000
Yes
25 May 2026
24 Apr 2026
23 May 2026
24 Apr 2026
21 May 2026
7 May 2026
24 Apr 2026 - 30 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
Taking down existing water proofing treatment of any description incl PCC padding,/ or cement work any thickness from roof surfaces, cleaning of roof and prepairing it for further treatment incl make good necessary dubbing out wherever required and removing rubbish from site complete all as specified and directed. | - | Sqm | - | - | |
Material and Labour for Brushing neat cement slurry with 3.0 kg of cement per sq. metre complete all as specified and as directed. | - | Sqm | - | - | |
Matrial and Labour for Cement Concrete 1:2:4 Type B-0 (12.50 mm Graded Stone aggregate in padding, finishing surface concrete topping even and fair (without using extra cement) of average thickness 40 mm in slope as required over roof complete all as specified and as directed. | - | Sqm | - | - | |
Material and Labour for Providing, cement concrete of Type in roof kerbs on roof or mud stops, rounded or chamfered on edges complete all as specified and as directed By Engineer-in-Charge | - | Cum | - | - | |
Material and Labour for 10 mm thick Plastering in CM 1:4 on concrete roof surfaces using water proofing compound @ 3% by weight of cement and finishing the surface even and fair. WPC will be measured separately. | - | Sqm | - | - | |
Supply only liquid waterproofing compound ISI Marked all as specified and as directed. | - | Kg | - | - | |
Material and Labour for Applying evenly two coat of industrial bitumen 85/25 at the rate of 1.2 kg per sq.m incl cleaning surface complete all as specified and as directed. | - | Sqm | - | - | |
Material and Labour for APP based polymeric membrane minimum weighing 3kg/sqm and minimum 3mm thick reinforced with polyster non wove fabric, (as per sample approved by the GE) land on primed surface by forced application complete all as specified. | - | Sqm | - | - | |
Material and Labour for Preparation of newly laid APP membrane roof treatment over 10 cm width or girth and applying two coats of aluminium paint complete all as specified and as directed. | - | Sqm | - | - | |
Supply and Fixing in Repair Rotational moulded polyethylene water storage tanks of capacity 1000 Ltrs (Including Dismantling of Existing Tanks (cylindrical vertical with closed top) hoisted and fixed in position all as specified in SSR Part I, including making necessary arrangements for fixing inlet, outlet and overflow pipe and provision of wash out pipe etc and 20 mm ball valves High Pressure PTMT with epoxy coated aluminium rod and high density plastic ball complete. | - | Each | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.26 MB
GPSC_8992.pdf
Tender Documents • 0.60 MB
PS_8992.pdf
Tender Documents • 0.27 MB
SOC_8992.pdf
Tender Documents • 0.26 MB
BOQ_853268.xls
BOQ • 0.39 MB