| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.1 LAccepted-AOC KOHRAUL PO YOGICHIOURA DISTT SONEBHADRA UP | ₹1.1 L Quoted ₹92,820 | L1 | Accepted-AOC Accepted on L1 basis |
| 2 | L2₹1.1 L+₹20,290 (21.9%)Rejected-Finance LAXMI MARKET PO JAYANT DISTT SINGRAULI MP | JAYANT | SINGRAULI | MP | ₹1.1 L+₹20,290 (21.9%) | L2 | Rejected-Finance Rejected |
| 3 | L3₹1.2 L+₹22,974.80 (24.8%)Rejected-Finance | ₹1.2 L+₹22,974.80 (24.8%) | L3 | Rejected-Finance Rejected |
| Sl No | Description | Qty | Unit | Moon Electrical and Engineering Workshop L3 | SHASHI ENGINEERING WORKS L1 | R K Enterprises L2 |
|---|---|---|---|---|---|---|
| 1.00Dismantling/assembling of both sides track frames, removal of damaged/broken guard track bolts, repairing/re-threading of damaged mounting holes,fitting of track guards in both track frames of IDM-70 (19) drill machine of East section | ||||||
| 1.01 | Total labour cost for lifting of M/s, providing support & removal of both sides track frame as per scope of work by engaging 01 nos supervisor , 01 skilled fitter , 01 skilled welder, 02 nos. semi skilled manpower and 03 nos. unskilled manpower for 03 days in two shifts which includes contractor profit and any other cost. | 1 | Job | 31,112.4 ₹31,112.4 | 13,000 ₹13,000 Lowest | 25,500 ₹25,500 |
| 1.02 | Total labour cost for removal of all guard track bolts (12 nos) remetaling & threading as per scope of work by engaging 01 nos supervisor , 01 skilled fitter , 01 skilled welder, 02 nos. semi skilled manpower and 03 nos. unskilled manpower for 03 days in two shifts which includes contractor profit and any other cost. | 1 | Job | 31,112.4 ₹31,112.4 | 15,000 ₹15,000 Lowest | 25,500 ₹25,500 |
| 1.03 | Total labour cost for fastening of all track guards & assembling of both sides frame as per scope of work by engaging 01 nos supervisor , 01 skilled fitter , 01 skilled welder and 03 nos. semi skilled manpower for 03 days in two shifts which includes contractor profit and any other cost. | 1 | Job | 30,162 ₹30,162 | 17,000 ₹17,000 Lowest | 25,500 ₹25,500 |
| 1.04 | Total labour cost for removal of supports & complete testing of M/c for proper functioning of the excuted job as per scope of work by engaging 01 nos supervisor , 01 skilled fitter , 01 skilled welder and 03 nos. semi skilled manpower for 02 days in two shifts which includes contractor profit and any other cost. | 1 | Job | 20,108 ₹20,108 | 17,900 ₹17,900 Lowest | 25,500 ₹25,500 |
| 1.05 | Hiring cost of welding machine | 11 | days | - | 120 ₹1,320 | 100 ₹1,100 Lowest |
| 1.06 | Hiring cost of grinding machine | 11 | days | - | 100 ₹1,100 | 60 ₹660 Lowest |
| 1.08 | Hiring cost of tools & tackles | 11 | days | - | 500 ₹5,500 | 100 ₹1,100 Lowest |
| 1.09 | Transpotation charge | 11 | days | 300 ₹3,300 Lowest | 2,000 ₹22,000 | 750 ₹8,250 |
| 2.00 | Total impact of GST for the purpose of CTC | 1 | Nos | - | - | - |
Tender Value
₹1.7 L
EMD Value
₹2,100
Closing Date
3 Apr 2026, 11:00 amClosed
GM(Excv), Jayant Project
GM office, Jayant project, Singrauli, M.P-486890
Dismantling/assembling of both sides track frames, removal of damaged/broken guard track bolts, repairing/re-threading of damaged mounting holes,fitting of track guards in both track frames of IDM-70 (19) drill machine of East section.
2026_NCL_357323_1
JNT/GM(Excv)/E-tender/25-26/68
Open Tender
Excavation Department Work
Item Rate
11 days
Jayant Project
As per NIT
3 documents required · 3 mandatory
₹2,100
28 Jul 2026
23 Mar 2026
4 Apr 2026
23 Mar 2026
3 Apr 2026
24 Mar 2026
23 Mar 2026 - 27 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Dismantling/assembling of both sides track frames, removal of damaged/broken guard track bolts, repairing/re-threading of damaged mounting holes,fitting of track guards in both track frames of IDM-70 (19) drill machine of East section | |||||
| 1.01 | Total labour cost for lifting of M/s, providing support & removal of both sides track frame as per scope of work by engaging 01 nos supervisor , 01 skilled fitter , 01 skilled welder, 02 nos. semi skilled manpower and 03 nos. unskilled manpower for 03 days in two shifts which includes contractor profit and any other cost. | - | Job | - | - |
| 1.02 | Total labour cost for removal of all guard track bolts (12 nos) remetaling & threading as per scope of work by engaging 01 nos supervisor , 01 skilled fitter , 01 skilled welder, 02 nos. semi skilled manpower and 03 nos. unskilled manpower for 03 days in two shifts which includes contractor profit and any other cost. | - | Job | - | - |
| 1.03 | Total labour cost for fastening of all track guards & assembling of both sides frame as per scope of work by engaging 01 nos supervisor , 01 skilled fitter , 01 skilled welder and 03 nos. semi skilled manpower for 03 days in two shifts which includes contractor profit and any other cost. | - | Job | - | - |
| 1.04 | Total labour cost for removal of supports & complete testing of M/c for proper functioning of the excuted job as per scope of work by engaging 01 nos supervisor , 01 skilled fitter , 01 skilled welder and 03 nos. semi skilled manpower for 02 days in two shifts which includes contractor profit and any other cost. | - | Job | - | - |
| 1.05 | Hiring cost of welding machine | - | days | - | - |
| 1.06 | Hiring cost of grinding machine | - | days | - | - |
| 1.08 | Hiring cost of tools & tackles | - | days | - | - |
| 1.09 | Transpotation charge | - | days | - | - |
| 2Total impact of GST for the purpose of CTC | |||||
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 1.15 MB
BOQ_370185.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .