Loading…
Loading…
Tender Value
₹2.8 Cr
EMD Value
₹2.9 L
Closing Date
4 Feb 2026, 3:00 pmClosed
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
60 days
Expenditure
Capital (Works)
RATES SEC
19 conditions · 6 needing a document upload
Financial Eligibility Criteria: The tenderer must have minimum average annual contractual turnover of V/N or 'V' whichever is less; where V= Advertised value of the tender in crores of Rupees N= Number of years prescribed for completion of work for which bids have been invited. The average annual contractual turnover shall be calculated as an average of "total contractual payments" in the previous three financial years, as per the audited balance sheet. However, in case balance sheet of the previous year is yet to be prepared/ audited, the audited balance sheet of the fourth previous year shall be considered for calculating average annual contractual turnover. The tenderers shall submit requisite information as per Annexure-VIB, along with copies of Audited Balance Sheets duly certified by the Chartered Accountant/ Certificate from Chartered Accountant duly supported by Audited Balance Sheet.
The tenderer must submit Chartered Accountant Certificate for Annual Contractual turnover Data for the Previous 3/4 Years (Contractual Payment only) (format given in Annexure-VI-B for reference ), otherwise the offer will be summarily rejected.
The average annual contractual turnover shall be calculated as an average of "total contractual payments" in the previous three financial years, as per the audited balance sheet. However, in case balance sheet of the previous year is yet to be prepared/ audited, the audited balance sheet of the fourth previous year shall be considered for calculating average annual contractual turnover. Copies of Audited Balance Sheets must be uploaded otherwise, Turnover of that Financial Year for which Audited Balance Sheet or P&L Account is not uploaded will not be considered in calculations.
Ballast Test Report : The tender is required to submit test report of ballast from approved laboratories only as per provision of specification of track ballast, IS/RDSO-SGE-0001, Feb 2023 failing which the offer shall be summarily rejected. The list of approved laboratories is uploaded along with tender document. List of the approved laboratories is as under: 1. Moti Lal Nehru Regional Engg. College, Allahabad 2. Institute of Engineering and Rural technology, Allahabad 3. CSP/NCR/Subedarganj, Allahabad 4. IIT (BHU), Varanasi 5. KNIT, Sultanpur. 6. HBTI, Kanpur. 7. IIT, Kanpur 8. Material Test Laboratory Civil Engg Deptt. AMU, Aligarh 9. National Test House Kamla Nehru Nagar, Gaziabad 10. IIT, Delhi 11. Delhi College of Engineering, Delhi 12. Sri Ram Test House, Delhi 13. Faculty of Engineering, DayalBagh Educational Institute, Dayalbagh, Agra. 14. Madhav Institute of Technology & Science, Gwalior. 15. Bundel Khand Institute of Technology, Jhansi 16. forest Research Institute, Dehradun (For wood work) 17. Any NABL approved laboratories. (Authority NCR HQ Letter No 291-W/29/QC/Policy/Works/834 dated 25.04.2025.)
61 conditions · 36 needing a document upload
All the Proformas, Annexures have been filled and uploaded in same format as given in Tender document.
Bid Capacity : The tender/technical bid will be evaluated based on bid capacity formula detailed as Annexure -VI. (Applicable only having advertised value more than Rs. 20 Crore)
Annexure-V(A) to be submitted in case of Partnership firm/Joint Venture (JV) /Hindu Undivided Family (HUF) /Limited Liability Partnership (LLP) etc. (This certificate is to be given by attorney/authorized signatory/each member of Partnership firm/Joint Venture (JV) /Hindu Undivided Family (HUF) /Limited Liability Partnership (LLP) etc.) (Authority ACS no. 2 of GCC 2022).
The tenderer shall clearly specify whether the tender is submitted on his own (Proprietary Firm) or on behalf of a Partnership Firm / Company / Joint Venture (JV) / Registered Society / Registered Trust / Hindu Undivided Family (HUF) / Limited Liability Partnership (LLP) etc. The tenderer(s) shall enclose the attested copies of the constitution of their concern, and copy of PAN Card along with their tender. Tender Documents in such cases are to be signed by such persons as may be legally competent to sign them on behalf of the firm, company, association, trust or society, as the case may be. Following documents shall be submitted by the tenderer:
a) Sole Proprietorship Firm: (i) All documents in terms of Para 10 of the Tender Form (Second Sheet)of GCC-2022.
(b) HUF: (i) A copy of notarized affidavit on Stamp Paper declaring that he who is submitting the tender on behalf of HUF is in the position of 'Karta' of Hindu Undivided Family (HUF) and he has the authority, power and consent given by other members to act on behalf of HUF. (ii) All other documents in terms of Para 10 of the Tender Form (Second Sheet) of GCC- 2022
(c) Partnership Firm: (i) A notarized copy of the Partnership Deed or a copy of the Partnership deed registered with the Registrar. (ii) A notarized or registered copy of Power of Attorney in favour of the individual to tender for the work, sign the agreement etc. and create liability against the firm. (iii) An undertaking by all partners of the partnership firm that they are not blacklisted or debarred by Railways or any other Ministry / Department of the Govt. of India from participation in tenders / contracts as on the date of submission of bids, either in their individual capacity or in any firm/LLP in which they were / are partners/members. Any Concealment / wrong information in regard to above shall make the bid ineligible or the contract shall be determined under Clause 62 of the Standard General Conditions of Contract. (iv) All other documents in terms of Para 10 of the Tender Form (Second Sheet) of GCC2022
(d) Joint Venture (JV): i. Separate identity/name shall be given to the Joint Venture. ii. The tender form shall be purchased and submitted only in the name of the JV and not in the name of any constituent member. The tender form can however be submitted by JV or any of its constituent member or any person authorized by JV through Power of Attorney to submit tender. iii. A copy of Memorandum of Understanding (MoU) duly executed by the JV members on a stamp paper, shall be submitted by the JV alongwith the tender. The complete details of the members of the JV, their share and responsibility in the JV etc. particularly with reference to financial, technical and other obligations shall be furnished in the MoU. iv. All other documents in terms of Para 10 of the Tender Form (Second Sheet) of GCC-2022
In case one or more of the members of the JV is/are partnership firm(s), following documents shall be submitted: (i) A notarized copy of the Partnership Deed or a copy of the Partnership deed registered with the Registrar. (ii) A copy of consent of all the partners or individual authorized by partnership firm, to enter into the Joint Venture Agreement on a stamp paper, (iii) A notarized or registered copy of Power of Attorney in favour of the individual to sign the MOU/JV Agreement on behalf of the partnership firm and create liability against the firm. (iv) An 3.4.1 undertaking by all partners of the partnership firm that they are not blacklisted or debarred by Railways or any other Ministry / Department of the Govt. of India from participation in tenders / contracts as on the date of submission of bids, either in their individual capacity or in any firm/LLP in which they were / are partners/members. Any Concealment / wrong information in regard to above shall make the bid ineligible or the contract shall be determined under Clause 62 of the Standard General Conditions of Contract.
In case one or more members is/are Proprietary Firm or HUF, the following documents shall be enclosed: (i) A copy of notarized affidavit on Stamp Paper declaring that his Concern is a proprietary Concern and he is sole proprietor of the Concern OR 3.4.2 he who is signing the affidavit on behalf of HUF is in the position of 'Karta' of Hindu Undivided Family (HUF) and he has the authority, power and consent given by other members to act on behalf of HUF.
In case one or more members of the JV is/are companies, the following documents shall be submitted: (i) A copy of resolutions of the Directors of the Company, permitting the company to enter into a JV agreement, (ii) The copies of MOA (Memorandum of Association) / AOA (Articles of Association) of the company 3.4.3 (iii) A copy of Certificate of Incorporation (iv) A copy of Authorization/copy of Power of Attorney issued by the Company (backed by the resolution of Board of Directors) in favour of the individual, to sign the tender, sign MOU/JV Agreement on behalf of the company and create liability against the company
In case one or more members of the JV is/are LLP firm/s, the following documents shall be submitted: (i) A copy of LLP Agreement (ii) A copy of Certificate of Incorporation of LLP (iii) A copy of resolution passed by partners of LLP firm, permitting the Firm to enter into a JV agreement (iv) A copy of Authorization /copy of Power of Attorney issued by the LLP firm (backed by resolution passed by the Partners) in favour of the individual, to sign the tender and/or sign the MOU/ JV agreement on behalf of 3.4.4 the LLP and create liability against the LLP. (v) An undertaking by all partners of the LLP that they are not blacklisted or debarred by Railways or any other Ministry / Department of the Govt. of India from participation in tenders / contracts as on the date of submission of bids, either in their individual capacity or in any firm/LLP or JV in which they were / are partners/members. Any Concealment / wrong information in regard to above shall make the contract liable for determination under Clause 62 of the Standard General Conditions of Contract.
In case one or more members of the JV is/are Society/s or Trust/s, the following documents shall be submitted: (i) A copy of Certificate of Registration (ii) A copy of Memorandum of 3.4.5 Association of Society/Trust Deed (iii) A copy of Rules & Regulations of the Society (iv) A copy of Power of Attorney, in favour of the individual to sign the tender documents and create liability against the Society/Trust.
(e) Company registered under Companies Act2013: (i) The copies of MOA (Memorandum of Association) / AOA (Articles of Association) of the company (ii) A copy of Certificate of Incorporation (iii) A copy of Authorization/Power of Attorney issued by the Company (backed by the resolution of Board of Directors) in favour of the individual to sign the tender on behalf of the company and create liability against the company. (iv) All other documents in terms Para 10 of the Tender Form (Second Sheet) of GCC-2022.
(f) LLP (Limited Liability Partnership): (i) A copy of LLP Agreement (ii) A copy of Certificate of Incorporation (iii) A copy of Power of Attorney/Authorization issued by the LLP in favour of the individual to sign the tender on behalf of the LLP and create liability against the LLP. (iv) An undertaking by all partners of the LLP that they are not blacklisted or debarred by Railways or any other Ministry / Department of the Govt. of India from participation in tenders / contracts as on the date of submission of bids, either in their individual capacity or in any firm/LLP or JV in which they were / are partners/members. Concealment / wrong information in regard to above shall make the contract liable for determination under Clause 62 of the Standard General Conditions of Contract. (v) All other documents in terms of Para 10 of the Tender Form (Second Sheet)of GCC-2022.
(g) Registered Society & Registered Trust: (i) A copy of Certificate of Registration (ii) A copy of Memorandum of Association of Society/Trust Deed (iii) A copy of Power of Attorney in favour of the individual to sign the tender documents and create liability against the Society/Trust. (iv) A copy of Rules & Regulations of the Society (v) All other documents in terms of Para 10 of the Tender Form (Second Sheet) of GCC-2022.
The tenderer shall clearly specify whether the tender is submitted on his own (Proprietary Firm) or on behalf of a Partnership Firm / Company / Joint Venture (JV) / Registered Society / Registered Trust / Hindu Undivided Family (HUF) / Limited Liability Partnership (LLP) etc. If it is NOT mentioned in the submitted tender that tender is being submitted on behalf of a Sole Proprietorship firm / Partnership firm / Joint Venture / Registered Company etc., then the tender shall be treated as having been submitted by the individual who has signed the tender
The tenderer whether sole proprietor / a company or a partnership firm / registered society / registered trust / HUF / LLP etc if they want to act through agent or individual partner(s), should submit along with the tender, a copy of power of attorney duly stamped and authenticated by a Notary Public or by Magistrate in favour of the specific person whether he/they be partner(s) of the firm or any other person, specifically authorizing him/them to sign the tender, submit the tender and further to deal with the Tender/ Contract up to the stage of signing the agreement except in case where such specific person is authorized for above purposes through a provision made in the partnership deed / Memorandum of Understanding / Article of Association /Board resolution, failing which tender shall be summarily rejected. A separate power of attorney duly stamped and authenticated by a Notary Public or by Magistrate in favour of the specific person whether he/they be partner(s) of the firm or any other person, shall be submitted after award of work, specifically authorizing him/them to deal with all other contractual activities subsequent to signing of agreement, if required. Note: A Power of Attorney executed and issued overseas, the document will also have to be legalized by the Indian Embassy and notarized in the jurisdiction where the Power of Attorney is being issued. However, the Power of Attorney provided by Bidders from countries that have signed the Hague Legislation Convention 1961 are not required to be legalized by the Indian Embassy if it carries a conforming Appostille certificate.
The tenderer should submit statement of deviation (if any) as per only format of Annexure b of tender document of Tender document
Conditional tenders are liable to be rejected
The tenderer should submit Tender form first sheet Annexure-I of Part I of GCC 2022
Details of the tenderer to be submitted as per proforma I of tender document.
DETAILS OF WORKS EXECUTED SIMILAR TO TENDERED WORK to be submitted as per proforma II of tender document
DECLARATION OF SITE VISIT as per proforma VII of tender document
Annexure VIB Annual Contractual Turnover Data for the Previous 3/4 Years (Contractual Payment only) certified by CA having UDIN No.
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
Please submit list of works in hand (CA certified having UDIN No) as per proforma IIIB of tender document indicating description of work, contract value, approximate value of balance work yet to be done and date of award. Supported documents/ certificates from the organization with whom they worked/ are working, should be submitted.
Please submit your correspondence address, e-mail ID and valid phone number.
Please submit your bank details i.e.Name of the Bank along with Bank Branch Code, Account Number, IFSC Code, and PAN Number, GST Registration, ESIC Registration.
Please furnish list of plant and Machinery available on hand own and proposed to be inducted own and hired to be given separately for the subject work as per proforma IV of tender document.
Please furnish list of Works completed in last seven financial years giving Description of Work, Organization for whom executed, approximate value of contract at time of award, Date of award and Date of Completion. Date of actual Start, Actual Completion and Final value of Contract shall also be given as per proforma IIIA of tender document.
Please furnish list of personal, organization available on hand and proposed to be engaged for the subject work as per proforma V of tender document.
Tenderer must submit following certificates/documents as applicable as per Clause 14 Part-I of GCC-2022 - 1. Constitution of the firm 2. Memorandum of Association/Article of Association 3. Certificate of Incorporation 4. Copy of authorization/Power of attorney to sign the tender (backed by the Resolution of Board) 5. Partnership deed 6. any other document as applicable to tenderer firm as per Clause 14 Part-I of GCC-2022.
Employment/Partnership etc. of Retired Railway Employees(As in Annexure-1):
(Annexure-1) The tenderer will give full information as to the date of retirement of such Engineer or gazetted officer from the said service and as to whether permission for taking such contract, or if the Contractor be a partnership firm or an incorporated company, to become a partner or director as the case may be, has been obtained by the tenderer or the Engineer or officer, as the case may be from the President of India or any officer, duly authorized by him in this behalf, shall be clearly stated in writing at the time of submitting the tender, if a tenderer is - i) be a retired Engineer of the gazetted rank or any other gazetted officer working before his retirement, whether in the executive or administrative capacity or whether holding a pensionable post or not, in the Engineering or any other department of any of the railways owned and administered by the President of India for the time being, OR ii) being partnership firm / joint venture (JV) / registered society / registered trust etc have as one of its partners a retired Engineer of the gazetted rank or any other gazetted officer working before his retirement, O R iii) being an incorporated company have any such retired Engineer of the gazetted rank or any other gazetted officer working before his retirement as one of its directors AND in case where such Engineer or officer had not retired from government service at least 1 year prior to the date of submission of the tender.
b) In case, upon successful award of contract, should a tenderer depute for execution of the works under or to deal matters related with this contract, any retired Engineer of gazette rank or retired gazetted officer working before his retirement in the Engineering or any other department of any of the railways owned and administered by the President of India for the time being, and now in his employment, then the tenderer will ensure that retired Engineer or retired gazetted officer had retired from government service at least 1 year prior to the date of his employment with tenderer and in case he had retired from service within a year then he possesses the requisite permission from the President of India or any officer, duly authorized by him in this behalf, to get associated with the tenderer.
(c) Should a tenderer or Contractor being an individual, have member(s) of his family or in the case of partnership firm/ company / joint venture (JV) / registered society / registered trust etc. one or more of his partner(s)/shareholder(s) or member(s) of the family of partner(s)/shareholder(s) having share of more than 1% in the tendering entity employed in gazetted capacity in the Engineering or any other department of the railway, then the tenderer at the time of submission of tender, will inform the authority inviting tenders the details of such persons.
Note:-If information as required as per a), b), c) above has not been furnished, contract is liable to be dealt in accordance with provision of clause 62 of Standard General Condition of Contract.
P.way work in connection with retention of 02 crossing stations Ikran (IK) & Shri Ghasinagar (SHGN) (04 lines) in lieu of sanctioned IBH in AF-BKI Section
CEN00AGC0126~NCR
CEN00AGC0126
Open
Works - General
6 Months
Agra, Uttar Pradesh
₹0
₹2.9 L
4 Feb 2026
8 Jan 2026
21 Jan 2026
105 items across 2 schedules · ₹2,78,78,219 total
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| 1 | More than 40 m long rail panel | RM | 500.00 | 13.41 | 6,705 |
| 2 | For Through Rail Renewal work | TRM | 200.00 | 41.65 | 8,330 |
| 3 | For Through Rail Renewal work | TRM | 3000.00 | 42.94 | 1,28,820 |
| 4 | For Casual/Scattered Rail Renewal work | RM | 200.00 | 34.99 | 6,998 |
| 5 | Through renewal of Metal / GFN liners in running track condition after cleaning of rail foot at liner seat, greasing of liner, liner seat and sealing of liner contact area at rail foot including removing, cleaning & lubrication of ER Clip & Insert Eye and re-driving the same with contractor's grease graphite of approved quality with all lead & lift. | Sleeper | 2000.00 | 16.26 | 32,520 |
| 6 | Lubrication of Elastic Rail Clips on PSC sleepers with contractor's grease, conforming to Railway's specifications, labour etc. complete as p e r procedure prescribed in latest edition of IRPWM. | ERC | 2000.00 | 2.77 | 5,540 |
| 7 | Lubrication of gauge face of rail on curves, cross overs, points & crossings, turn-in curves and at locations as required with contractor's grease graphite grade "O" IS 408 and as directed. | RM | 1000.00 | 3.31 | 3,310 |
| 8 | Rail section of 52Kg and above | Each | 300.00 | 106.31 | 31,893 |
| 9 | Under Conditions not requiring Traffic Block | Set | 8.00 | 6,189.3 | 49,514.4 |
| 10 | Under Traffic Block Conditions | Set | 16.00 | 6,808.23 | 1,08,931.68 |
| 11 | Dismantling & removing existing SEJ (Switch Expansion Joint) assembly during line block and its replacement with plain track as of adjoining section with all fittings including rail cutting and drilling of holes and renewal of special sleepers with PSC Sleepers as directed and aligning rails, providing fishplates and bolts/ temporary connection with adequate welding gap with adjoining rail and ensuring proper track geometry for 30 kmph speed. The release material shall be stacked as directed by Engineer in charge. | Set | 8.00 | 8,346.7 | 66,773.6 |
| 12 | 1 in 12 Turnout (Under Traffic Block) | Set | 4.00 | 32,788.7 | 1,31,154.8 |
| 13 | Derailing Switch (Under conditions not requiring Traffic Block). | Set | 2.00 | 5,201.9 | 10,403.8 |
| 14 | 1 in 12 Turnouts | Set | 23.00 | 63,270.87 | 14,55,230.01 |
| 15 | Derailing Switch | Set | 2.00 | 13,550.81 | 27,101.62 |
| 16 | 1 in 12 Turnouts | Set | 15.00 | 46,855.85 | 7,02,837.75 |
| 17 | Derailing Switch | Set | 1.00 | 9,076.35 | 9,076.35 |
| 18 | 1 in 12 Turnouts | Set | 8.00 | 51,541.43 | 4,12,331.44 |
| 19 | Derailing Switch | Set | 2.00 | 9,983.99 | 19,967.98 |
| 20 | Depth of 300 mm below bottom of sleeper - For Plain Track : | TRM | 1500.00 | 539.16 | 8,08,740 |
| 21 | For average lead up to 50m and lift up to 5m | cum | 2500.00 | 95.52 | 2,38,800 |
| 22 | Lifting and packing for regrading the existing PSC sleeper track to required height / level in stages not exceeding 75mm or part thereof at a time, providing permissible ramp for the track, insertion of moorum / sand / stone ballast uniformly under the existing track and placing the same to safe approved gradient, gauge, cushion including levelling and one round of through packing to allow train movement at restricted speed of 30 kmph for a specified length with all leads & lifts and fixing, marking, painting rail level pegs at every 30m interval. Note: Lifting of track shall be done in stages as per procedure prescribed in latest edition of IRPWM to get the proposed final level as per approved working profile, as directed by Engineer in-charge. | TRM | 1000.00 | 165.69 | 1,65,690 |
| 23 | Boxing and profiling of ballast as per procedure prescribed in latest edition of IRPWM including cess dressing on both sides of track. The work will include removing excess ballast from track and putting the same in crib and shoulder by leading to a maximum of 50m including crossing of track, deweeding on ballast section etc and as directed by Engineer-In charge. | TRM | 6000.00 | 24.39 | 1,46,340 |
| 24 | Under Traffic Block Conditions: | cum | 2000.00 | 48.79 | 97,580 |
| 25 | When distance of nearest quarry is more than 50 km and up to 100 km | cum | 6300.00 | 1,497.48 | 94,34,124 |
| 26 | For 60 Kg/60EI - R260 grade Rail | Each | 200.00 | 4,391.94 | 8,78,388 |
| 27 | Dismantling of existing LWR/SWR track of any structure, removing rails, sleepers, fish plates, cutting of rails, segregation and stacking of released Rails, Sleepers and fitting at nominated location in countable manner within a free lead of 500m, levelling of ballast to correct profile for laying new track over it, all as per direction of Engineer-in-Charge. | TRM | 1500.00 | 165.16 | 2,47,740 |
| 28 | Rail length up to 13m - Under Conditions not requiring Traffic Block | RM | 5000.00 | 15.05 | 75,250 |
| 29 | For rails/panels of more than 13m and up to 40m length - Under Conditions not requiring Traffic Block | RM | 5000.00 | 19.51 | 97,550 |
| 30 | With contractor's hard wood pegs of 50 mm dia and 60 cm long | Each | 150.00 | 122.77 | 18,415.5 |
| 31 | Installation of reference points for track centre line in main and loop lines, in straight or curve portion, SRJ for turnouts, heel of crossing (HOC), locations of derailing switches, switch expansion joints etc. away from formation on firm ground at known offset with MS Angles of 50mmx50mmx5mm thick of length 1.80 m each, founded in concrete block of size 30cm x 30cm x 45cm of nominal mix 1:3:6, including painting to reference pegs with two coats of enamel paints on exposed surface, as directed by Engineer In charge. Note: Earth work and Cement concrete will be paid under relevant items. | Each | 100.00 | 497.76 | 49,776 |
| 32 | Spreading of ballast, from existing stacks available along formation on top or at cess, in required uniform thickness, compaction of ballast layer laid on new formation at all the locations with smooth wheeled power roller of 8-10 tonne capacity to sufficient number of passes to form consolidated ballast bed of approximately 250mm thickness to a width of 4m symmetrical to centre line of proposed track in correct line & level with all ascents & descents, as directed by Engineer in-charge. Note: Item is inclusive of (a) providing ramp for taking roller to formation and removing the same & making good formation after completion of work; (b) redistribution & leveling of excess ballast while rolling to obtain uniform plane cambered surface. | cum | 2500.00 | 45.58 | 1,13,950 |
| 33 | For sleeper density of 1660 sleepers per km | TRM | 4500.00 | 258.59 | 11,63,655 |
| 34 | Maximum Shifting / Slewing up to 1 metre | TRM | 300.00 | 192.21 | 57,663 |
| 35 | For Full day (8 hrs ) | Each | 50.00 | 3,193.66 | 1,59,683 |
| 36 | For one shift ( 12 Hrs) | Each | 100.00 | 1,144.61 | 1,14,461 |
| 37 | For PSC sleeper Track with Sleeper Density of 1540 Sleepers/Km or more | TRM | 5000.00 | 96.79 | 4,83,950 |
| 38 | 1 in 12 PSC layout | Set | 12.00 | 13,828.92 | 1,65,947.04 |
| 39 | Without Rail tensor | TRM | 3000.00 | 32.67 | 98,010 |
| 40 | With 2 bolts | Set | 300.00 | 102.55 | 30,765 |
| 41 | With Clamps | Set | 100.00 | 146.02 | 14,602 |
| 42 | One mobile Gang comprising of 15 physically fit labours plus 1 Mate. Note: (1) In case, contractor provides less no. of Labour/Mate or for non availability of vehicle, payment will be d e d u c t e d for each such person or non- availability of vehicle @ 20% of the accepted item rate, separately for each shortfall. (2) The Contractor shall keep one pick up Truck of minimum 1.5T payload capacity with Driver all the time and all expenditures for running at an average of 80 kms per day shall be born by the Contractor. | Gang Day | 30.00 | 13,153.17 | 3,94,595.1 |
| 43 | Replacing existing glued joint rail with cut rails or with glued joint rail or insertion of glued joint by cutting existing track under traffic condition by cutting rails, refixing with all rail sleeper fastenings and providing required gaps for carrying out welding as an alternative to drilling holes or joining rails with fish plates duly drilling holes as required including stacking of released material and as directed by engineer in-charge. Note: (1) Drilling holes & rail cutting will be paid separately. (2) Transportation of materials to the site of work from supply points, if more than 250m, shall be paid separately. | Each | 80.00 | 1,685.87 | 1,34,869.6 |
| 44 | With Contractor's hard wood block. | Each | 50.00 | 2,535.63 | 1,26,781.5 |
| 45 | Drilling holes of 16mm to 22mm dia. on all types of PSC sleepers and fixing the dowels with adhesive of RDSO approved quality for fixing check rails & guard rails, as directed by Engineer in-charge. | Each | 100.00 | 350.22 | 35,022 |
| 46 | For 60 Kg Rails | RM | 8000.00 | 53.3 | 4,26,400 |
| 47 | 1 in 12 Turnout | Set | 23.00 | 1,126.44 | 25,908.12 |
| 48 | Derailing Switch | Set | 3.00 | 359.47 | 1,078.41 |
| 49 | LWR / SEJ Board | Each | 10.00 | 150.81 | 1,508.1 |
| 50 | Curve Post | Each | 10.00 | 91.67 | 916.7 |
| 51 | Curve Board | Each | 10.00 | 150.81 | 1,508.1 |
| 52 | Curve details, SE, Versine, Station Nos. etc. per station. | Each | 400.00 | 49.85 | 19,940 |
| 53 | With Contractor's USFD machine | TRM | 500.00 | 6.03 | 3,015 |
| 54 | New Line Section, not opened for traffic | TRM | 6000.00 | 9.67 | 58,020 |
| 55 | 1 in 12 Turnouts (Under Traffic Block Conditions) | Set | 4.00 | 10,088.72 | 40,354.88 |
| 56 | Derailing Switch (Under Traffic Block Conditions) | Set | 2.00 | 3,192.55 | 6,385.1 |
| 57 | 1 in 12 Turnouts | Set | 15.00 | 6,053.23 | 90,798.45 |
| 58 | Derailing Switch | Set | 1.00 | 1,915.53 | 1,915.53 |
| 59 | Carrying out various miscellaneous works, for proper upkeep of crew rest van / rest room as directed by machine in-charge of Track Machines by providing a team of 2 labours for 12 hours shift, broadly mentioned hereunder: (1) Bringing water from nearby source and cleaning machine with water jet or any suitable means; (2) Fuelling machine duly bringing diesel / hydraulic oil from the stacked drums; (3) Bringing water to staff rest van or staff rest room, cleaning rest van / rest room, cooking food for Track Machine staff or bringing food from outside (cost of food shall be borne by the staff concerned).; (4) Guarding & watching machines, spare parts, oils, grease etc. during day and night time at all locations, wherever necessary, as instructed by the machine in- charge; (5) In case, contractor provides less no. of Labour/Mate, payment will be deducted for each such person @ 75% of the accepted item rate. | Shift | 30.00 | 1,289.77 | 38,693.1 |
| 60 | CSM / DUO / 3X with or without DGS (7.5 KVA generator and 8x500 W) | Night | 20.00 | 4,112.49 | 82,249.8 |
| 61 | 60 Kg - 110/90 UTS - Outside Track | Each | 1500.00 | 258.52 | 3,87,780 |
| 62 | 60 Kg - 110/90 UTS - On Running Line | Each | 500.00 | 329.59 | 1,64,795 |
| 63 | Outside Track | Each | 800.00 | 47.01 | 37,608 |
| 64 | On Running Line | Each | 400.00 | 62.36 | 24,944 |
| 65 | I n Wagon where mechanical handling is possible and traffic block is not required or in Truck/trailer. | MT | 500.00 | 116.79 | 58,395 |
| 66 | I n Wagon where mechanical handling is possible a n d traffic block is not required or in Truck/trailer. | MT | 80.00 | 115.27 | 9,221.6 |
| 67 | For lead up to 500 metre. | MT | 150.00 | 356.93 | 53,539.5 |
| 68 | For lead beyond 500 metre and up to 1 Km. | MT | 100.00 | 459.92 | 45,992 |
| 69 | For lead up to 500m | MT | 700.00 | 401.38 | 2,80,966 |
| 70 | For lead beyond 500 metre and up to 1 Km | MT | 100.00 | 583.84 | 58,384 |
| 71 | From Wagon where mechanical handling is possible a n d traffic block is not required or in Truck / trailer. | MT | 350.00 | 86.39 | 30,236.5 |
| 72 | During period of traffic block | MT | 250.00 | 27.47 | 6,867.5 |
| 73 | I n Wagon where mechanical handling is possible a n d traffic block is not required or in Truck / trailer | MT | 1500.00 | 90.7 | 1,36,050 |
| 74 | I n Wagon/Truck / trailer where mechanical handling is possible a n d traffic block is not required. | MT | 1200.00 | 114.83 | 1,37,796 |
| 75 | For lead beyond 500 metre and up to 1 Km | MT | 600.00 | 411.36 | 2,46,816 |
| 76 | Lead beyond 30 Km and up to 50 km | MT | 70.00 | 419.4 | 29,358 |
| 77 | Lead beyond 100 Km and up to 150 Km | MT | 60.00 | 934.02 | 56,041.2 |
| 78 | Extra for every Km per MT beyond 150 Km over item no. 172047 | MT-Km | 5000.00 | 3.15 | 15,750 |
| 79 | Lead up to 5 Km | MT | 2000.00 | 52.99 | 1,05,980 |
| 80 | Lead beyond 50 Km and up to 100 Km | MT | 1500.00 | 519.02 | 7,78,530 |
| 81 | Lead beyond 100 Km and up to 150 Km | MT | 800.00 | 827.65 | 6,62,120 |
| 82 | Extra for every Km per MT beyond 150 Km over item no. 172057 | MT-Km | 6000.00 | 3.15 | 18,900 |
| 83 | From Truck / Trailer | MT | 1500.00 | 84.43 | 1,26,645 |
| 84 | From Truck / Trailer | MT | 1200.00 | 88.06 | 1,05,672 |
| 85 | From Truck / Trailer | MT | 100.00 | 117.93 | 11,793 |
| 86 | Rails, switches, crossings, SEJ, Glued Joints, Check Rails etc. | MT | 200.00 | 351.11 | 70,222 |
| 87 | All type of PSC sleepers | MT | 600.00 | 383.69 | 2,30,214 |
| 88 | P.Way fittings of all types and other similar loose items | MT | 100.00 | 358.83 | 35,883 |
| 89 | Stacking of glued joints in single layer for electrical testing, in such a manner that glued joints - (a) shall not touch ground, (b) shall not touch one another, (c) shall not touch any rail or any metallic body, (d) shall not be water-logged from any side and (e) end post shall not rest on supports of glued joint | Each | 50.00 | 60.37 | 3,018.5 |
| 90 | Cutting foot of rail by gas or any other approved method for check rails and grinding sharp edges into smooth profile. Payment shall be made for length of cutting of foot. | RM | 50.00 | 138.16 | 6,908 |
| 91 | Fixing check rails to running rails on level crossings with MS brackets, MS packing plates, bolts & nuts, spring washers etc. including lubrication as per approved drawing & specifications, as directed. Rails, MS brackets, packing plates, bolts & nuts, spring washers will be supplied by Railways. Note: One set consists two check Rails. | Set | 50.00 | 4,670.74 | 2,33,537 |
| 92 | Manufacturing, supplying and fixing Curve Indicator / Point Indicator / SEJ Boards to be provided at various locations on formation, made out of MS sheet 2mm thick of size 450mm x 300mm duly fixed with MS frame of 25mm x 25mm x 3mm angle welded to 50mm x 50mm x 3mm MS angle, 1000mm long post split and bent 100mm at bottom end with all lead & lift as per specification and including painting of details with enamel paint, as directed by Engineer in-charge (Earthwork & concreting will be paid separately) | Each | 50.00 | 822.97 | 41,148.5 |
| 93 | For erection | Each | 30.00 | 237.68 | 7,130.4 |
| 94 | For removal | Each | 30.00 | 192.8 | 5,784 |
| 95 | Supply and fixing in position pre-cast cement concrete Fouling Mark as per approved drawing at station yard, duly painting the top surface and slopes with white enamel paint in two coats and inscribed letters with black of Fouling Mark, complete in all respects with all labour, materials including cement, tools and plants etc. | Each | 35.00 | 476.92 | 16,692.2 |
| 96 | Providing and erecting water proof Gypsy Tent of size 3m x 3m for a specific period of time and removal of the same after completion of work or as directed by Engineer in-charge. | Day | 20.00 | 489.55 | 9,791 |
| 97 | Office Table of size 1.2m x 0.9m per day | Each | 50.00 | 82.95 | 4,147.5 |
| 98 | Office Chairs with cushioned seat, back and arms per day | Each | 50.00 | 34.61 | 1,730.5 |
| 99 | JCB Backhoe Loaders 3DX Plus or similar with minimum 1.10 cum bucket capacity | Hour | 100.00 | 794.59 | 79,459 |
| 100 | Hydra or similar tyre mounted Pick-n-Carry crane of 12T capacity for misc. works of handling of material | Hour | 50.00 | 942.83 | 47,141.5 |
| 101 | Arranging labour as and when required by the Engineer in charge, for various works under SSE/P.Way, with contractor's T&P, equipments, hand signal flags, etc. as per specifications, special conditions and detailed scope of work as furnished in the tender and as directed by the Engineer in charge. Note: Item shall be operated with prior approval of concerned Sr. DEN / DEN in charge. | Day | 300.00 | 651.58 | 1,95,474 |
| Schedule total | ₹2,39,46,939.86 | ||||
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .