Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹47.9 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | Rejected-Technical | - | Rejected-Technical Rejected |
| Sl No | Description | Qty | Unit | Maintenance Service Engineering Works L1 |
|---|---|---|---|---|
| 1.00 | Earth work excavation soil and depositing on bank with initial lead of 10m 100m and lift of 2m in Hard stiff clay, block cotton,gravel, stoney earth and earth mixed with small size boulder etc., complete including cost of all materials lead lift etc complete as directed by the department engineer at site. | 186.29 | M3 | 250 ₹46,572.5 Lowest |
| 2.00 | Providing M sand filling in foundation including cost of sand, filling charges, watering and consolidation etc complete. including cost of labour, lead, lift etc. complete.as per standard specification and as directed by the dept. Engineer at site. | 20.27 | M3 | 1,600 ₹32,432 Lowest |
| 3.00 | Providing and laying Plain Cement Concrete 1:3:6 using 20 mm HBG stone for foundation including cost of all materials, labour, transport, curing, lead, lift etc. complete as per standard specification and as directed by the dept. Engineer at site. | 20.27 | M3 | 7,000 ₹1,41,890 Lowest |
| 4.00 | Providing and laying R:C:C 1:1.5:3 with minimum cement content of 315Kg/cum using 12 to 20mm HBG metal for Raft including cost of all materials, transport, lead, Lift, labour, for laying concrete curing etc., complete as directed by the department engineer at site. Without form work | 27.14 | M3 | 9,000 ₹2,44,260 Lowest |
| 5.00 | R:C:C 1:1.5:3 using 12 to 20mm HBG metal without form work including cost of all materials, transport, lead, Lift, labour, for laying concrete curing etc., complete as directed by the department engineer at site. Without form work Plinth | 4 | M3 | 9,500 ₹38,000 Lowest |
| 6.00 | R.C.C. 1:1.5:3 using 12- 20mm metal for foundation for Plinth using steel centering for soffits of reinforced cement concrete slabs or plain surfaces including stutting up to 3m high, using M.S. Sheets of size 90cm x 60cm. and 'B.G.10' guage, stiffened with welded M.S. angle of size 25mm x 25mm x 3mm laid over silver oak (Country wood) joists of size 10cm x 6.5cm. (spaced at about 90 cm c/c) and supported by casurina props of 10cm to 13cm. dia (spaced at 75cm c/c) complying with standard specification including cost of all materials,transport, curing, labour, lead, lift etc. complete.as per standard specification as directed by the dept. Engineer at site. | 3 | M3 | 13,000 ₹39,000 Lowest |
| 7.00 | R.C.C. 1:1.5:3 using 12- 20mm metal for foundation for Cable duct with form work using steel centering for soffits of reinforced cement concrete slabs or plain surfaces including stutting up to 3m high, using M.S. Sheets of size 90cm x 60cm. and 'B.G.10' guage, stiffened with welded M.S. angle of size 25mm x 25mm x 3mm laid over silver oak (Country wood) joists of size 10cm x 6.5cm. (spaced at about 90 cm c/c) and supported by casurina props of 10cm to 13cm. dia (spaced at 75cm c/c) complying with standard specification including cost of all materials,transport, curing, labour, lead, lift etc. complete.as per standard specification as directed by the dept. Engineer at site. | 16 | M3 | 16,000 ₹2,56,000 Lowest |
| 8.00 | Supplying and fabricating and placing in position of steel reinforcement for RCC works including labour for cutting, bending, tying and fixing in position as per specification including cost of all materials, lead, lift, labour, cost of binding wire etc. comlete as directed by the department engineer at site. | 5 | MT | 95,000 ₹4,75,000 Lowest |
| 9.00 | Providing and laying P:C:C 1:2:4 using 20mm HBG metal for plinths without form work including cost of all materials,curing, labour, lead, lift etc. complete.as per standard specification as directed by the dept. Engineer at site | 48.5 | M3 | 7,500 ₹3,63,750 Lowest |
| 10.00 | Providing and laying P.C.C 1:2:4 using 20mm HBG stone for with form work using steel centering for soffits of reinforced cement concrete slabs or plain surfaces including stutting up to 3m high, using M.S. Sheets of size 90cm x 60cm. and 'B.G.10' guage, stiffened with welded M.S. angle of size 25mm x 25mm x 3mm laid over silver oak (Country wood) joists of size 10cm x 6.5cm. (spaced at about 90 cm c/c) and supported by casurina props of 10cm to 13cm. dia (spaced at 75cm c/c) complying with standard specification including cost of all materials,transport, curing, labour, lead, lift etc. complete.as per standard specification as directed by the dept. Engineer at site. | 14.19 | M3 | 10,500 ₹1,48,995 Lowest |
Tender Value
₹48.1 L
EMD Value
₹48,100
Closing Date
10 Jul 2025, 2:00 pmClosed
SE/GCC-I/CNI
230KV GIS SS Complex, A-10, Thiru-Vi-Ka Industrial Estate, Guindy, Chennai-32
as per NIT
2025_EB_576878_1
OT-023/25-26 of SE/GCC-I/CNI
Open Tender
Civil Works
Works
120 days
Alamathy
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹48,100
Yes
4 Oct 2025
2 Jul 2025
11 Jul 2025
2 Jul 2025
10 Jul 2025
2 Jul 2025
Amount
Earth work excavation soil and depositing on bank with initial lead of 10m 100m and lift of 2m in Hard stiff clay, block cotton,gravel, stoney earth and earth mixed with small size boulder etc., complete including cost of all materials lead lift etc complete as directed by the department engineer at site.
Providing M sand filling in foundation including cost of sand, filling charges, watering and consolidation etc complete. including cost of labour, lead, lift etc. complete.as per standard specification and as directed by the dept. Engineer at site.
Providing and laying Plain Cement Concrete 1:3:6 using 20 mm HBG stone for foundation including cost of all materials, labour, transport, curing, lead, lift etc. complete as per standard specification and as directed by the dept. Engineer at site.
Providing and laying R:C:C 1:1.5:3 with minimum cement content of 315Kg/cum using 12 to 20mm HBG metal for Raft including cost of all materials, transport, lead, Lift, labour, for laying concrete curing etc., complete as directed by the department engineer at site. Without form work
R:C:C 1:1.5:3 using 12 to 20mm HBG metal without form work including cost of all materials, transport, lead, Lift, labour, for laying concrete curing etc., complete as directed by the department engineer at site. Without form work Plinth
R.C.C. 1:1.5:3 using 12- 20mm metal for foundation for Plinth using steel centering for soffits of reinforced cement concrete slabs or plain surfaces including stutting up to 3m high, using M.S. Sheets of size 90cm x 60cm. and 'B.G.10' guage, stiffened with welded M.S. angle of size 25mm x 25mm x 3mm laid over silver oak (Country wood) joists of size 10cm x 6.5cm. (spaced at about 90 cm c/c) and supported by casurina props of 10cm to 13cm. dia (spaced at 75cm c/c) complying with standard specification including cost of all materials,transport, curing, labour, lead, lift etc. complete.as per standard specification as directed by the dept. Engineer at site.
R.C.C. 1:1.5:3 using 12- 20mm metal for foundation for Cable duct with form work using steel centering for soffits of reinforced cement concrete slabs or plain surfaces including stutting up to 3m high, using M.S. Sheets of size 90cm x 60cm. and 'B.G.10' guage, stiffened with welded M.S. angle of size 25mm x 25mm x 3mm laid over silver oak (Country wood) joists of size 10cm x 6.5cm. (spaced at about 90 cm c/c) and supported by casurina props of 10cm to 13cm. dia (spaced at 75cm c/c) complying with standard specification including cost of all materials,transport, curing, labour, lead, lift etc. complete.as per standard specification as directed by the dept. Engineer at site.
Supplying and fabricating and placing in position of steel reinforcement for RCC works including labour for cutting, bending, tying and fixing in position as per specification including cost of all materials, lead, lift, labour, cost of binding wire etc. comlete as directed by the department engineer at site.
Providing and laying P:C:C 1:2:4 using 20mm HBG metal for plinths without form work including cost of all materials,curing, labour, lead, lift etc. complete.as per standard specification as directed by the dept. Engineer at site
Providing and laying P.C.C 1:2:4 using 20mm HBG stone for with form work using steel centering for soffits of reinforced cement concrete slabs or plain surfaces including stutting up to 3m high, using M.S. Sheets of size 90cm x 60cm. and 'B.G.10' guage, stiffened with welded M.S. angle of size 25mm x 25mm x 3mm laid over silver oak (Country wood) joists of size 10cm x 6.5cm. (spaced at about 90 cm c/c) and supported by casurina props of 10cm to 13cm. dia (spaced at 75cm c/c) complying with standard specification including cost of all materials,transport, curing, labour, lead, lift etc. complete.as per standard specification as directed by the dept. Engineer at site.
Labour charges for back filling of pits with excavated earth other then sand in layers of 150mm thick, including charges for spreading watering, consolidation as per standard specification and as directed by the engineer at site including all labour, transport charges, lead and lift etc., complete.
Fabrication, Supplying and fixing of 20mm dia GI Bolts & nutts of specified length threading for a length of 15cm at top and 15cm L at bottom and hot dip galvanising of bolt including supply of 2nos. of GI nuts & washers and fixing in the position as directed by the engineer at site including assembling of template etc., cost of all materials labour lead lift etc. complete. 20 mm dia GI Bolt & Nuts with 1mtr length
Plastering in CM 1:3 12 mm thick for bottom of roof slab, bottom and sides of sunshade partition walls etc including cost of all materials, transport, curing, labour, lead, lift etc. complete.as per standard specification and as directed by the dept. Engineer at site.
Colour washing two coats using cement paint over one coat of white washing including cost of all materials, labour, lead lift etc., complete as per standard specification and as directed by the department engineer at site.
Labour charges for assembling and re-fixing of template in correct position and aligenment for various equipment plinth and grouting the foundation bolts including cost of all materials transport, labour, lead, lift etc., complete as directed by the dept. Engineer at site.
Fabrication galvanising and supply of GI tower parts-MS of various type of normal, location specific narrow base tower, location specific special tower and its extension tower parts, tower body/leg extensions hanger rods, D-shackles, U-bolts etc including cost of all materials, labour, transport, leads, and lifts etc., complete as directed by the department engineer at site. (Exluding bolts, nuts and stubs)
Supply of hot dipped GI bolts & nuts, including packing wahsers and electro galvanished spring washers as per relevent IS test including cost of all trasport charges leads and lifts etc., as per standard specification and as directed by the department engineer at site.
Labour charges for removal of surplus earth from the site and putting into low lying area outside the yard upto 2 Kms away from the site including the cost of all labour, transport, lead, lift etc., complete as directed by the department engineer at site.
Filling with 20 mm B.G metal including cost of all labour, materials, transport, leads, lift,etc., complete and as directed by the department engineer at site.
Filling with stone dust including cost of all labour, transport, materials, leads, lift,etc., complete and as directed by the department engineer at site.
Supplying, fabricating of GI angle supports ,Flats including cutting ,welding,fabicating and placing in position , all materials, galvanizing, transportation, labour, lead, lift etc complete as per standard specification and as directed by the dept. Engr at site
Supplying, laying of PVC pipe with required PVC bend T&L bend, union including cutting, jointing, wherever necessary earth work excavation refilling dismantling masonry if necessary including cost of all materials, lead & lift etc.., complete as directed by the department engineer at site. 32 mm dia 10 kg/cm2
Supplying, laying of PVC pipe with required PVC bend T&L bend, union including cutting, jointing, wherever necessary earth work excavation refilling dismantling masonry if necessary including cost of all materials, lead & lift etc.., complete as directed by the department engineer at site. 25 mm dia 10 kg/cm2
Supplying, laying of PVC pipe with required PVC bend T&L bend, union including cutting, jointing, wherever necessary earth work excavation refilling dismantling masonry if necessary including cost of all materials, lead & lift etc.., complete as directed by the department engineer at site. 20 mm dia 10 kg/cm2
Supplying & fixing gunmetal wheel valve including cost of materials, labour, lead & lift etc., complete as directed by the department engineer at site. 32 mm dia
Supplying & fixing gunmetal wheel valve including cost of materials, labour, lead & lift etc., complete as directed by the department engineer at site. 25 mm dia
Supplying & fixing in position of 20mm dia PVC tap of approved make and quality including cost of materials, labour, lead & lift etc., complete as directed by the department engineer at site.
GST for bidders within TamilNadu
GST for bidders outside TamilNadu (IGST)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .