Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.0 LAccepted-AOC SAROJA CONTRACTOR SENJI TAMIL NADU TN | L1 | Accepted-AOC Accept | |
| 2 | L2₹5.1 L+₹607.50 (0.12%)Rejected-AOC KRISHNAGIRI | TAMIL NADU | 635001 | L2 | Rejected-AOC Accept |
| Sl No | Description | Qty | Unit | R RAJENDIRAN L2 | Saroja L1 |
|---|---|---|---|---|---|
| 1.01Construction of Retainingwall @ East side Near Village in Madhapoondi Pt | |||||
| 1.02 | Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B. | 20.25 | Cum | 263.78 ₹5,341.54 Lowest | 263.78 ₹5,341.54 Lowest |
| 1.03 | Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete. | 3.04 | Cum | 5,818.55 ₹17,688.39 Lowest | 5,818.55 ₹17,688.39 Lowest |
| 1.04 | Supplying and erecting centring for sides and suffits including supports and structing upto 3.29m height for plane surface in all cross bracting using MS sheets of size 90 x 60cm and 10kg stiffened with angle of size 25 x 25 x 3mm for boarding laid over silver oak joists os size 10 x 6.5mm at about 90cm C/C and supported by casuring props of 10cm 13cm dia at C/C etc., complete. | 63 | sqm | 547.5 ₹34,492.5 Lowest | 547.5 ₹34,492.5 Lowest |
| 1.05 | Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete. | 27.34 | Cum | 6,123.07 ₹1,67,404.73 Lowest | 6,123.07 ₹1,67,404.73 Lowest |
| 1.06 | Fixing of Name Board including cost, painting, Lettering, installation etc. | 1 | no | 1,000 ₹1,000 Lowest | 1,000 ₹1,000 Lowest |
| 1.07 | Photographic charges for taking photos in various stages before execution, during execution and after execution | 1 | no | 500 ₹500 Lowest | 500 ₹500 Lowest |
| 1.08Construction of Retainingwall @ Minor Bridge Wingwall in Madhapoondi Pt | |||||
| 1.09 | Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B. | 3.6 | Cum | 263.78 ₹949.61 Lowest | 263.78 ₹949.61 Lowest |
| 1.10 | Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete. | 0.72 | Cum | 5,818.55 ₹4,189.36 Lowest | 5,818.55 ₹4,189.36 Lowest |
Tender Value
₹5.1 L
EMD Value
₹5,110
Closing Date
4 Nov 2025, 3:00 pmClosed
BDO VP
BDO Gingee
Retaining wall at minor bridge, East side Compound wall , bride parapet wall works t madapoondi
2025_RDTN_617681_2
Mine-Minerals 2025-26
Open Tender
Civil Works
Works
45 days
Gingee
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹5,110
Yes
19 Nov 2025
27 Oct 2025
4 Nov 2025
27 Oct 2025
4 Nov 2025
27 Oct 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.57 MB
BOQ_738178.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .