Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.2 CrAccepted-AOC | ₹1.2 Cr | L1 | Accepted-AOC As per LOA |
| 2 | L2₹1.3 Cr+₹15.7 L (13.4%)Rejected-AOC 309 SKYLARK BUILDING 309 SKYLARK BUILDING 60 NEHRU PLACE NEW DELHI NEW DELHI DELHI 110019 | SOUTH EAST DELHI | DELHI | 110019 | ₹1.3 Cr+₹15.7 L (13.4%) | L2 | Rejected-AOC L2 bidder |
| 3 | Rejected-Technical | - | - | Rejected-Technical As per TEC Evaluation |
| 4 | Rejected-Technical U 110 FIRST FLOOR SAPNA ARORA U 110 1ST FLOOR SURYA ARCADE MAIN VIKAS MARG DELHI 110092 SHAKARPUR EAST DELHI DELHI 110092 | EAST DELHI | DELHI | 110092 | - | - | Rejected-Technical As per TEC Evaluation |
Tender Value
Refer Docs
Closing Date
8 Jun 2021, 5:30 pmClosed
GM-III, Contracts-EnM
Contracts EnM-III, 2nd Floor, Jyoti Sadan, NHPC Office Complex, Sector-33, Faridabad-121003 Telefax - 0129-2254687,
Supply, Installation, Testing n Commissioning of UPS, LT Panels, LT cables etc. as per Scope of Work and Comprehensive AMC of UPS for 8 Years after Warrantee at NHPC Corporate Office, Faridabad
2021_NHPC_624014_1
NH/Conts(EnM)-III/CO-141/ PR10020/475/2021
Open Tender
Miscellaneous Works
Works
120 days
Faridabad
As per Tender Document
8 documents required · 8 mandatory
₹1,000
Yes
NHPC Ltd
Exempted
11 Nov 2021
30 Apr 2021
10 Jun 2021
30 Apr 2021
8 Jun 2021
30 Apr 2021
Amount
Item Description
Supply of 75 KVA/75 KW UPS. (Including Freight & Insurance) Each Modular UPS of 75 KVA / 75 KW having Modules of 25-30KW in 200 KVA Expandable chassis should have following specifications: True online double conversions, IGBT Rectifier & inverter based UPS. Three phases Input/ three phase output with SMF batteries Suitable for backup on 75 KW Load using 12V, VRLA Battery with Each UPS, Input voltage range 340-478V at 100% load, 220-478 V @ 50% load. Input power factor 0.99, input THDi less than 5%. Output THD is less than 3% for linear load. Less than 5 % for nonlinear load. Parallel communication port, RS232, USB, EPO and SNMP interface, BMS interface, Dust Filter at Air Inlet point are required. UPS should be provided with environment monitoring probe to measure temperature and humidity of UPS room. LCD Display indicating all important parameters. SNMP software should be compatible to Microsoft windows XP, Windows Vista, Window 8, Window server 2003 R2, UPS software should be compatible to Google chrome and as per details in technical specifications complete in all respect.
Erection / Installation, Testing & Commissioning of 75 KVA/75 KW UPS. Iinstallation, testing & commissioning of 75 KVA/75 KW UPS. as per details above (Item em No-1.1)
Supply, installation, testing & commissioning of 20 KVA /18 KW UPS. (Including Freight & Insurance) Each UPS of 20 KVA / 18 KW should have following specifications: True online double conversions, IGBT Rectifier & inverter based UPS. Three phases Input/ three phase output with SMF batteries Suitable for backup on 18 KW Load using 12V, VRLA Battery with Each UPS, Input voltage range 340-478V at 100% load, 220-478 V @ 50% load. Input power factor 0.99, input THDi less than 5%. Output THD is less than 3% for linear load. Less than 5 % for nonlinear load. Parallel communication port, RS232, USB, EPO and SNMP interface, BMS interface, Dust Filter at Air Inlet point are required. UPS should be provided with environment monitoring probe to measure temperature and humidity of UPS room. LCD Display indicating all important parameters. SNMP software should be compatible to Microsoft windows XP, Windows Vista, Window 8, Window server 2003 R2, UPS software should be compatible to Google chrome and as per details in technical specifications complete in all respect.
Erection/ Installation, Testing & Commissioning of 20 KVA /18 KW UPS. Installation, testing & commissioning of 20 KVA /18 KW UPS. as per details above (Item em No-2.1)
Installation, Testing and Commissioning of L.T. bus ducts & Switch Boards, comprising of incomer panels, outgoing panels, bus coupler, On load changeover switch, Circuit Breaker with electrical as well as Mechanical Interlock and necessary indications, required no of Current Transformers with numerical relays. as per details aove (Item No-3.1)
Installation, Testing and Commissioning of UPS Output panel , IP-42 with MCCBs/MCBs, relays & meters with stand (Height 150mm) as per details above (Item No-4.1)
Installation, Testing and Commissioning of UPS Output panel , IP-42 with MCCBs/MCBs, relays & meters with stand (Height 150mm) as per details above (Item No-5.1)
Supply, Installation, Testing and Commissioning of 8 Way TPN MCB Distribution board with IP42 protection, prewired as per technical specification. Incomer (From UPS O/P TPN MCB) 01 nos 100 Amp TPN MCB Outgoing 8 Nos 63 Amp TPN MCB for floor DB As per details in technical specifications complete in all respect.
Supply, Installation, Testing and Commissioning of 6 Way TPN MCB Distribution board with IP42 protection, prewired as per technical specification. Incomer (From UPS O/P TPN MCB) 01 nos 100 Amp TPN MCB Outgoing 6 Nos 63 Amp TPN MCB for floor DB
Supplying and laying of following size 1100 V grade, stranded aluminium conductor, XLPE insulated, PVC Inner sheathed, armoured, PVC Outer sheath cables. The cables shall be laid in existing cable tray/ trench etc.
Supplying and laying of following size 1100/660 V Grade, PVC insulated, Single / multi Core, multi strand Un armored Copper Conductor Cables. The cables shall be laid in existing cable tray/ trench etc.
1CX25 Sq.mm Copper YY
1CX120 Sq.mm Copper YY
Supplying and making end termination with brass compression gland and aluminium lugs for following size of PVC insulated and PVC sheathed / XLPE aluminium conductor cable of 1.1 KV grade as required
Supplying and making end termination with brass compression gland and Copper lugs for following size of PVC insulated copper conductor cable of 1100/660 V Grade as required
Chemical Copper Earthing complete with all respect
Supplying and laying 25 mm X 5 mm copper strip at 0.50 metre below ground as strip earth electrode, including connection/ terminating with nut, bolt, spring, washer etc. as required. (Jointing shall be done by overlapping and with 2 sets of brass nut bolt & spring washer spaced at 50mm)
Supplying and installing following size of perforated Hot Dipped Galvanized Iron cable tray (Galvanization thickness not less than 50 microns) with perforation not more than 17.5%, in convenient sections, joined with connectors, suspended from the ceiling with G.I. suspenders including G.I. bolts & nuts, etc. as required.
300 mm width X 50 mm depth X 1.6 mm thickness
After completion of warranty period of two years Comprehensive Annual Maintenance Contract (AMC)
After completion of warranty Comprehensive AMC for 2 x 75 KVA (2 Nos UPS of 75KVA Each) modular UPS system as per details in scope of work.
First year
Second Year
Third year
Fourth Year
Fifth Year
Sixth Year
Seventh Year
Eighth Year
After completion of warranty, Comprehensive AMC for 2 x 20 KVA (2 Nos UPS of 20 KVA Each) UPS system as per details in scope of work.
First year
Second Year
Third year
Fourth Year
Fifth Year
Sixth Year
Seventh Year
Eighth Year
Nikom Infrasolutions Pvt. Ltd.
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .