Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical | Accepted-Technical All Documents ok |
| 2 | Accepted-Technical | Accepted-Technical All Documents Ok |
| 3 | Accepted-Technical BAHARAKOTA P O MANIKPARA P S JHARGRAM DIST JHARGRAM | MANIKPARA | JHARGRAM | WEST BENGAL | Accepted-Technical All Documents Ok |
| 4 | Accepted-Technical | Accepted-Technical All Documents Ok |
Tender Value
₹4.9 L
EMD Value
₹9,743
Closing Date
13 Nov 2026, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EE/JFMPD
Ghoradhara, Jhargram
Boundary wall in Jhargram Irrigation Colony
2026_IWD_5081600_1
WBIW/EE/JFMPD/e NIT-06
Open Tender
CIVIL WORKS
Percentage
Ghoradhara
Please refer Tender documents.
5 documents required · 5 mandatory
₹9,743
Yes
25 Nov 2026
30 Oct 2026
17 Nov 2026
30 Oct 2026
13 Nov 2026
30 Oct 2026
120 days
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation of foundation trenches ordrains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing,spreading or stacking the spoils within a lead of 75 m.as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete.
(a) Depth of excavation not exceeding 1,500 mm. | 12.49 | Cum. | 142.15 | ₹1,775.4 |
| 2 | Earth work in filling in foundation trenches or plinth with good earth, in layers not exceeding 150 mm. including watering and ramming etc. layer by layer complete. (Payment to be made on the basis of measurement of finished quantity of work) (a) With earth obtained from excavation of foundation. 1/5 th of treanch volume for foundation | 2.5 | Cum. | 92.41 | ₹230.85 |
| 3 | Surface Dressing of the ground in any kind of soil including removing vegetation inequalities not exceeding 15 cm. depth and disposal of the rubbish within a lead upto 75 m as directed. | 160 | Sqm | 11.92 | ₹1,907.2 |
| 4 | (A) Filling in foundation or plinth by silver sand in layers not exceeding 150 mm as directed and consolidating the same by thorough saturation with water, ramming complete including the cost of supply of sand. (payment to be made on measurement of finished quantity) | 2 | Cum. | 607.64 | ₹1,215.28 |
| 5 | Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor) (a) 25 mm to 30 mm thick wooden shuttering as per decision & direction of Engineer-In-Charg | 75.64 | Sqm | 382.57 | ₹28,937.59 |
| 6 | Ordinary Cement concrete (mix 1:1.5:3) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement if any, in ground flooras per relevant IS codes. | 10.4 | Cum. | 6,808.34 | ₹70,793.12 |
| 7 | Ordinary Cement concrete (mix 1:2:4) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement,if any, in ground floor as per relevant IS codes.a) Pakur Variety | 4.41 | Cum. | 6,215.87 | ₹27,411.99 |
| 8 | Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawing and direction. (i) Tor steel/Mild Steel I. SAIL/ TATA/RINL let @ 1.1% of PCC work | 0.85 | MT | 65,862.19 | ₹55,982.86 |
| 9 | 125 mm. thick brick work with 1st class bricks in cement mortar (1:4) in ground floor | 144.56 | Sqm | 835.45 | ₹1,20,773.49 |
| 10 | Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor).[Excluding cost of chipping over concrete surface] (ii) With 1:4 cement mortar (b) 15 mm thick plaster | 422.35 | Sqm | 176.64 | ₹74,603.9 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.79 MB
Tendernotice_2.pdf
PDF • 1.13 MB
BOQ_5192618.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .