| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.2 LAdmitted-Finance | -34.12% | ₹2.2 L | L1 | Admitted-Finance |
| 2 | L2₹2.8 L+₹54,172.08 (24.2%)Admitted-Finance | -18.18% | ₹2.8 L+₹54,172.08 (24.2%) | L2 | Admitted-Finance |
| 3 | L3₹3.4 L+₹1.1 L (50.3%)Admitted-Finance | -1.00% | ₹3.4 L+₹1.1 L (50.3%) | L3 | Admitted-Finance |
| 4 | L4₹3.5 L+₹1.2 L (54.8%)Admitted-Finance | +2.00% | ₹3.5 L+₹1.2 L (54.8%) | L4 | Admitted-Finance |
Tender Value
₹3.4 L
EMD Value
₹6,780
Closing Date
7 Sept 2026, 6:00 pmClosed
Executive Engineer, REW Jammu
Office of the Executive Engineer, REW Jammu
Renovation of Community Bunker Wno 3 Platan Pyt Platan Block Khour and Constt. of P/Work near land of Subash Chander Wno. 7 Pyt Platan Block Khour and Constt. of culvert over Seam wall near Gali near Kaliveer devsathan W. no. 3 Pyt Platan Block Khour
2026_RDPR_322811_5
e-NIT No. 498 REWJ of 2026-27 dated 25-08-2026
Open Tender
Civil Works
Percentage
Jammu
Please refer Tender documents.
3 documents required · 3 mandatory
₹500
MH0515
₹6,780
11 Sept 2026
31 Aug 2026
8 Sept 2026
31 Aug 2026
7 Sept 2026
31 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork in excavation by manual means in trenches for foundations, drains, pipes, cables etc(not exceeding 1.5m in width)including dressing of sides and ramming of bottom lifts upto 1.5m inc. getting out excavated earth and disposal of surplus excavated earth as directed:in all kinds of soil | 1 | cum. | 256.85 | ₹256.59 |
| 2 | P/L in position Cement conc. 1 cement:5fine sand:10graded crushed stone agg. 40 mm excluding the cost of centring & shuttering all work upto plinth level. | 1 | cum. | 4,826.5 | ₹4,821.67 |
| 3 | P/L in position Cement conc. 1 cement:3fine sand:6graded crushed stone agg. 20 mm excluding the cost of centring & shuttering all work upto plinth level. | - | cum. | 5,733.6 | - |
| 4 | Reinforced cement concrete including curing but excluding the cost of centering,shuttering and reinforcement withl 1:1.5:3 (1 Cement:1.5 Coarse sand:3 Graded stone aggregate 20mm nominal size) | 2.51 | cum. | 7,788.4 | ₹19,548.88 |
| 5 | Providing and laying Vitrified tiles in different sizes (thickness to be specified by the manufacturer), with water absorption less than 0.08% and conforming to IS: 15622, of approved brand & manufacturer, in all colours and shades, in skirting, riser of steps, laid with cement based high polymer modified quick set tile adhesive (water based) conforming to IS: 15477, in average 6 mm thickness, including grouting of joints :Size of tile 600x600 mm | 72 | sqm. | 1,617.95 | ₹1,16,492.4 |
| 6 | Finishing walls with water proofing cement paint of required shade on New work (two or more coats applied @ 3.84 kg/10sqm) | 60 | sqm | 98.75 | ₹5,925 |
| 7 | Providing and mixing water proofing material in cement plaster work in
proportion recommended by the manufacturers: | 50 | KG | 67 | ₹3,350 |
| 8 | Steel Reinforcement for RCC Work including straightening,cutting,bending, placing in position and binding all complete above plinth level . Cold twisted bars | 200 | Kg | 123.2 | ₹24,640 |
| 9 | Centring & shuttering including strutting, propping etc. and removal of the formwork. FOR FOUNDATIONS , BASES OF COLUMNS | - | sqm. | 286.35 | - |
| 10 | Centring & shuttering including strutting, propping etc. and removal of the formwork.FOR Suspended floor | - | sqm. | 718.2 | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.37 MB
BOQ_1084357.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .