| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.3 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹10.3 L+₹74,817.80 (7.82%)Rejected-AOC | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | C Maria Cross L1 | DEVALLA PUNNAIAH L2 |
|---|---|---|---|---|---|
| 1.00 | Chipping of concrete and roughening the surface and removal of debris away from the site including cost of all materials, labour charges, lead, T&P, lift, etc., complete an as directed by Engineer incharge of the work | 20 | m2 | 46 ₹920 Lowest | 55 ₹1,100 |
| 2.00 | Brick work in CM 1:5 using Fly ash brick including cost of all materials, T&P, lead, lift, etc., complete and as directed by Engineer in charge at site. | 1.2 | m3 | 6,881 ₹8,257.2 Lowest | 7,200 ₹8,640 |
| 3.00 | Plastering with CM 1:3, 12mm thick including cost of all materials, T&P, lead, lift, curing etc., complete and as directed by Engineer incharge at site. | 28 | m2 | 317 ₹8,876 Lowest | 330 ₹9,240 |
| 4.00 | Painting of steel structures with two coats of Epoxy primer including removing the rust using wire brush and cost of all materials, T&P, lead, lift, etc., complete and as directed by site Engineer incharge of the work. | 1,971 | m2 | 321 ₹6,32,691 Lowest | 350 ₹6,89,850 |
| 5.00 | Colour washing with two coats of interior emulsion paint and one coat of primer over old plastered surface including the cost of scrapping, all materials, lead, lift, labour, T&P etc, complete and as directed by the Engineer incharge of the work. | 1,054 | m2 | 240 ₹2,52,960 Lowest | 250 ₹2,63,500 |
| 6.00 | Providing two legged scaffolding using 10 to 13 cm dia casuarinas props, distance between two rows being 1.25m and spacing of posts being 2m in both rows, with two horizontal posts with 0.50m overlap on either side and braces at 2m c/c including longitudinal and transverse middle braces to step up and providing a platform with C.W Planks of 40mm thick and 1m width etc., complete using coir and nails for pipeline work including cost of all materials, labuor, lead, lift, etc, complete | 516 | m2 | 103 ₹53,148 Lowest | 115 ₹59,340 |
Tender Value
Refer Docs
EMD Value
₹8,900
Closing Date
23 Jul 2025, 2:00 pmClosed
SE CM NCTPS II
Office of CE NCTPS II chennai 120
NCTPS II Civil Maintenance Circle Civil Maintenance Division Repair and maintenance works to the steel structure at 27m level C row grid 9 to 15aand 3 nos staircase at A row column side at Power House building
2025_EB_580229_1
CE/NCTPS-II/SE/CM/14/2025-26
Open Tender
Civil Works
Works
NCTPS II
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹8,900
Yes
3 Dec 2025
10 Jul 2025
24 Jul 2025
10 Jul 2025
23 Jul 2025
10 Jul 2025
Amount
Chipping of concrete and roughening the surface and removal of debris away from the site including cost of all materials, labour charges, lead, T&P, lift, etc., complete an as directed by Engineer incharge of the work
Brick work in CM 1:5 using Fly ash brick including cost of all materials, T&P, lead, lift, etc., complete and as directed by Engineer in charge at site.
Plastering with CM 1:3, 12mm thick including cost of all materials, T&P, lead, lift, curing etc., complete and as directed by Engineer incharge at site.
Painting of steel structures with two coats of Epoxy primer including removing the rust using wire brush and cost of all materials, T&P, lead, lift, etc., complete and as directed by site Engineer incharge of the work.
Colour washing with two coats of interior emulsion paint and one coat of primer over old plastered surface including the cost of scrapping, all materials, lead, lift, labour, T&P etc, complete and as directed by the Engineer incharge of the work.
Providing two legged scaffolding using 10 to 13 cm dia casuarinas props, distance between two rows being 1.25m and spacing of posts being 2m in both rows, with two horizontal posts with 0.50m overlap on either side and braces at 2m c/c including longitudinal and transverse middle braces to step up and providing a platform with C.W Planks of 40mm thick and 1m width etc., complete using coir and nails for pipeline work including cost of all materials, labuor, lead, lift, etc, complete
DEVALLA PUNNAIAH (BID ID -1407528)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .