Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance 240 SECTOR 3 HSIIDC BAWAL REWARI HARYANA 123501 | REWARI | HARYANA | 123501 | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
Tender Value
Refer Docs
Closing Date
15 Feb 2021, 3:00 pmClosed
T.S. Bharadwaj
thyssenkrupp Industrial Solutions _India_ Private Limited Uhde House, LBS Marg, Vikhroli_W, Mumbai 400083, India
Pressure Relief Valves_Safety Valves
2020_NALCO_605954_1
6695-PPM-00-EC-0012
Limited
Miscellaneous Goods
Supply
330 days
Damanjodi
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
Exempted
16 Sept 2021
28 Dec 2020
17 Feb 2021
28 Dec 2020
15 Feb 2021
28 Dec 2020
Amount
Supply of Pressure Relief Valves (Safety Valves) including Packing & Forwarding, all fittings, accessories and associated items including all Mandatory & Commissioning Spares, as per MR.
Tell-tale Safety Valve -14 Nos. 03-PSV-006 03-PSV-040 03-PSV-007 03-PSV-042 03-PSV-019 03-PSV-045 03-PSV-020 03-PSV-047 03-PSV-027 03-PSV-051 03-PSV-028 03-PSV-053 03-PSV-037 03-PSV-056
03-PCV-102 Failure -1No. 03-PSV-104
Digester overpressure protection -6Nos. 03-PSV-107 03-PSV-109 03-PSV-111 03-PSV-123 03-PSV-124 03-PSV-125
Flash Vessel overpressure protection -8Nos. 03-PSV-209 03-PSV-210 03-PSV-211 03-PSV-212 03-PSV-224 03-PSV-225 03-PSV-226 03-PSV-227
03-PCV-267 Failure 03-PSV-269 -1No.
Tell-tale Safety Valve 05-PSV-108 -1No.
CCL Thermal Safety valve 05-PSV-109-1No.
Tell-tale Safety Valve -1No. 06-PSV-264
CCL Thermal Safety valve -1No. 06-PSV-507
Cooling Water TSV -8Nos. 07-PSV-701 07-PSV-702 07-PSV-703 07-PSV-704 07-PSV-705 07-PSV-706 07-PSV-707 07-PSV-708
CCL Thermal Safety valve -1No. 07-PSV-020
Tell-tale Safety Valve -1No. 07-PSV-029
Cooling Water TSV -1No. 08-PSV-001
RMP Water TSV -1No. 08-PSV-002
MPS Header to Evaporators -1No. 25-PSV-024
MPS Header to Digestion -2Nos. 25-PSV-029 25-PSV-032
MPS Header to Calciner -1No. 25-PSV-030
LPS Header to Digestion, IBSH -3Nos. 25-PSV-004 25-PSV-005 25-PSV-006
LPS Header to Evaporator 1 & 2 -4Nos. 25-PSV-009 25-PSV-010 25-PSV-014 25-PSV-015
LPS Header to Area 04, 05, 06 & 07 users 25-PSV-019 25-PSV-020 -2Nos.
30-PCV-008 failure -1No. 30-PSV-102
Service Air vessel overpressure protection -2Nos. 28-PSV-001 28-PSV-002
Instrument Air vessel overpressure protection -2Nos. 28-PSV-021 28-PSV-022
HFO Unloading line TSV -1No. 30-PSV-021
30-PCV-007 failure -1No. 30-PSV-101
HFO Transfer line TSV 30-PSV-050 -1No.
Caustic Transfer line overpressure protection 57-PSV-021 -1No.
HP Caustic Transfer line overpressure protection -1No. 57-PSV-051
Purge water line overpressure protection -1No. 08-PSV-101
Description of Work / Item(s)
Amount
Charges for rendering Site Supervision of Erection, Testing & Commissioning at Damanjodi site, as menitoned in MR.
Tell-tale Safety Valve -14 Nos. 03-PSV-006 03-PSV-040 03-PSV-007 03-PSV-042 03-PSV-019 03-PSV-045 03-PSV-020 03-PSV-047 03-PSV-027 03-PSV-051 03-PSV-028 03-PSV-053 03-PSV-037 03-PSV-056
03-PCV-102 Failure -1No. 03-PSV-104
Digester overpressure protection -6Nos. 03-PSV-107 03-PSV-109 03-PSV-111 03-PSV-123 03-PSV-124 03-PSV-125
Flash Vessel overpressure protection -8Nos. 03-PSV-209 03-PSV-210 03-PSV-211 03-PSV-212 03-PSV-224 03-PSV-225 03-PSV-226 03-PSV-227
03-PCV-267 Failure 03-PSV-269 -1No.
Tell-tale Safety Valve 05-PSV-108 -1No.
CCL Thermal Safety valve 05-PSV-109-1No.
Tell-tale Safety Valve -1No. 06-PSV-264
CCL Thermal Safety valve -1No. 06-PSV-507
Cooling Water TSV -8Nos. 07-PSV-701 07-PSV-702 07-PSV-703 07-PSV-704 07-PSV-705 07-PSV-706 07-PSV-707 07-PSV-708
CCL Thermal Safety valve -1No. 07-PSV-020
Tell-tale Safety Valve -1No. 07-PSV-029
Cooling Water TSV -1No. 08-PSV-001
RMP Water TSV -1No. 08-PSV-002
MPS Header to Evaporators -1No. 25-PSV-024
MPS Header to Digestion -2Nos. 25-PSV-029 25-PSV-032
MPS Header to Calciner -1No. 25-PSV-030
LPS Header to Digestion, IBSH -3Nos. 25-PSV-004 25-PSV-005 25-PSV-006
LPS Header to Evaporator 1 & 2 -4Nos. 25-PSV-009 25-PSV-010 25-PSV-014 25-PSV-015
LPS Header to Area 04, 05, 06 & 07 users 25-PSV-019 25-PSV-020 -2Nos.
30-PCV-008 failure -1No. 30-PSV-102
Service Air vessel overpressure protection -2Nos. 28-PSV-001 28-PSV-002
Instrument Air vessel overpressure protection -2Nos. 28-PSV-021 28-PSV-022
HFO Unloading line TSV -1No. 30-PSV-021
30-PCV-007 failure -1No. 30-PSV-101
HFO Transfer line TSV 30-PSV-050 -1No.
Caustic Transfer line overpressure protection 57-PSV-021 -1No.
HP Caustic Transfer line overpressure protection -1No. 57-PSV-051
Purge water line overpressure protection -1No. 08-PSV-101
Pentair Sanmar Limited
Pentair Sanmar Limited
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .