Loading…
Loading…
Tender Value
₹2.8 Cr
EMD Value
₹5.6 L
Closing Date
14 Jul 2026, 4:00 pm
Similar tender results from the same govt authority in the past 3 years.
SE PWD R and B KATHUA SAMBA CIRCLE KATHUA
SE PWD R and B KATHUA SAMBA CIRCLE KATHUA
Please refers to BOQ
2026_PWDJK_313615_1
e-NIT No.PWD/SE/KS/20 of 2026-27 Dated 24-06-2026
Open Tender
Civil Works - Roads
365 days
KATHUA
Please refers to NIT/SBD
5 documents required · 5 mandatory
₹6,000
SE PWD R and B KATHUA SAMBA CIRCLE KATHUA
₹5.6 L
SE PWD R and B KATHUA SAMBA CIRCLE KATHUA
25 Jun 2026
25 Jun 2026
15 Jul 2026
25 Jun 2026
14 Jul 2026
25 Jun 2026
10 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolishing R.C.C. work manually/by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge | 22.43 | Cum | 2,516.85 | ₹56,452.95 |
| 2 | Demolishing brick work manually/by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge: In cement mortar | 135.31 | Cum | 1,458.45 | ₹1,97,342.87 |
| 3 | Disposal of building rubbish by mechanical transport including loading, unloading and stacking - 1Km | 157.75 | Cum | 128.75 | ₹20,310.31 |
| 4 | Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excl. the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer-in charge. Note: - Cement in this item is @ 330 kg/ cum. Excess or less cement used as per design mix is content considered payable or recoverable separately. | 375.39 | Cum | 9,412.05 | ₹35,33,189.45 |
| 5 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto all level Thermo-Mechanically Treated bars of grade Fe-500D or more | 59,898.21 | Kg | 123.2 | ₹73,79,459.47 |
| 6 | Add or deduct for using more or less cement in the items of design mix over and above the specified cement content therein. | 150.16 | Quintel | 941 | ₹1,41,300.56 |
| 7 | Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchors blocks, plain window sills, fillets, sunken floor etc upto floor V level, including curing but excluding the cost of centring, shuttering and finishing with 1:5:10 (1 cement : 5 coarse sand : 10 graded brick aggregate 40 mm nominal size (Under Flooring) | 98.95 | Cum | 4,469.25 | ₹4,42,232.29 |
| 8 | Providing and laying damp-proof Course 40 mm thick with cement concrete 1:2:4 (1cement:2 coarse sand: 4 graded stone aggregate 20 mm nominal size) and curing complete | 760.93 | Sqm | 346.7 | ₹2,63,814.43 |
| 9Centring and shuttering including strutting propping etc and removal of form work for | |||||
| 9.01 | Columns, pillars, piers, abutments, posts and struts. | 521.99 | Sqm | 742.55 | ₹3,87,603.67 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.41 MB
BOQ_1015323.xls
BOQ • 0.51 MB
Download all tender documents and submit your bid