Loading…
Loading…
Tender Value
₹13.4 L
EMD Value
₹27,000
Closing Date
5 Aug 2026, 5:00 pm
EEECD(D)GKP
MOHADDIPUR GORAKHPUR
CONSTRUCTION OF BOUNDARY WALL AT 3311 KV SS khantara DIST siddharthnagar
2026_PVVNV_1169687_1
86/ECD(D)GKP/2026-27
Open Tender
Civil Works
Percentage
SIDDHARTHNAGAR
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,360
EEECD(D)GKP
₹27,000
5 Aug 2026
15 Jul 2026
6 Aug 2026
15 Jul 2026
5 Aug 2026
15 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of surplus earth lead upto 50 m and for all lift, as directed by Engineer-in-charge. | 21 | CUM | 191 | ₹4,011 |
| 1.02 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:4:8 (1 cement : 4coarse sand (zone-III) derived from natural sources : 8 graded stone | 7.5 | CUM | 5,007 | ₹37,552.5 |
| 1.03 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:1½:3 (1 Cement: 1½ coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 4.5 | CUM | 6,131 | ₹27,589.5 |
| 1.04 | Providing and laying in position cement concrete of 1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 23.5 | CUM | 5,791 | ₹1,36,088.5 |
| 1.05 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 6.5 | CUM | 6,649 | ₹43,218.5 |
| 1.06 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 3.5 | CUM | 7,977 | ₹27,919.5 |
| 1.07 | Centering and shuttering including strutting, propping etc. and removal of form for Lintels, beams, plinth beams, girders, bressumers and cantilevers | 18 | SQM | 541 | ₹9,738 |
| 1.08 | Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns, etc. for mass concrete | 22 | Sqm | 288 | ₹6,336 |
| 1.09 | Centering and shuttering including strutting, propping etc. and removal of form for Columns, Pillars, Piers, Abutments, Posts and Struts | 30 | Sqm | 707 | ₹21,210 |
| 1.1 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level. | 700 | kg | 79 | ₹55,300 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.69 MB
BOQ_2194835.xls
BOQ • 0.30 MB
nitnews.pdf
Additional Documents • 1.13 MB
Tdocu.pdf
Tender Documents • 0.38 MB
ext.pdf
PDF • 0.68 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].