Loading…
Loading…
Tender Value
₹1.3 Cr
EMD Value
₹2.7 L
Closing Date
14 Aug 2026, 3:00 pm
AII/TRD- TRD work in connection with provision of PTFE shifting of Umra TSS of Ajmer Division.
DRM-TRD-10-2026-27
DRM-TRD-10-2026-27
Open
Works - General
12 Months
Ajmer, Rajasthan
₹0
₹2.7 L
23 Jul 2026
23 Jul 2026
31 Jul 2026
A-(Schedule-1, Section-1, General)
B-(Schedule-1, Section-2, Concrete)
C-(Schedule-1, Section-3, Ferrous)
D-(Schedule-1, Section-4, Non-Ferrous)
E-(Schedule-1, Section-5, Insulator)
F-(Schedule-1, Section-8A, General)
G-(Schedule-1, Section-9C, Copper Items)
I-Power Block Annexure
Item Breakup - A-(Schedule-1, Section-1, General)
Erection Total 96048.00 Item- 5 CORE SOR Item No.11(a)(i)Supply without Insulator and erection of cut-in (9-Tonne) Insulator. S No. Item Description of Item Unit Qty Rate Amount No
Erection Total 5378.00 CORE SOR Item No.11(a)(ii)Supply without Insulator and erection of a suspension (9-Tonne) Item- 6 Insulator. S No. Item Description of Item Unit Qty Rate Amount No
Erection Total 200700.00 Item- 7 CORE SOR Item No.11(b)Supply without Insulator and erection of 25 kV Post Insulator. S No. Item Description of Item Unit Qty Rate Amount No
Erection Total 15192.00 Item- 8 CORE SOR Item No.23(a)Transfer of equipment from one mast or support to another.. S No. Item Description of Item Unit Qty Rate Amount No
Erection Total 20247.00
Item Breakup - B-(Schedule-1, Section-2, Concrete)
Erection Total 857500.00 Item- 2 CORE SOR Item No.2(a)(ii) In rocky soil. S No. Item Description of Item Unit Qty Rate Amount No
Erection Total 960200.00 CORE SOR Item No.2(b)(i) In other than hard soil and rock (For concrete mix of M 10 and M 15 Item- 3 Grade Foundation) S No. Item Description of Item Unit Qty Rate Amount No
Supply AJMER DIVISION-ELECTRICAL/NORTH WESTERN RLY
Erection Total 391950.00
Item Breakup - C-(Schedule-1, Section-3, Ferrous)
Erection Total 2951460.00 CORE SOR Item No.3(b)(iii)Supply and erection of special fabricated and galvanised steel structures Item- 2 other than Portals & traction- Masts not covered under items 3(b)(i) & 3(b)(ii). S No. Item Description of Item Unit Qty Rate Amount No
Erection Total 1687680.00 Item- 4 CORE SOR Item No.3(d)(i)Supply and erection of a Guy Rod Assembly. S No. Item Description of Item Unit Qty Rate Amount No
Erection Total 120516.00 Item- 5 CORE SOR Item No.4(a)(i)Supply without insulator and erection of Single bracket assembly. S No. Item Description of Item Unit Qty Rate Amount No
Erection Total 120610.00 Item- 6 CORE SOR Item No.4(a)(ii)Extra on 4(a)(i) for supporting two OHES. S No. Item Description of Item Unit Qty Rate Amount No
Erection Total 7388.00 Item- 7 CORE SOR Item No.16(a) (i)Supply and erection of a structure bond. S No. Item Description of Item Unit Qty Rate Amount No
Erection Total 61200.00 Item- 8 CORE SOR Item No.16(b)Supply and erection of a longitudinal bond. S No. Item Description of Item Unit Qty Rate Amount No
Erection Total 4275.00 Item- 9 CORE SOR Item No.16(c)Supply & erection of a transverse and special bond. S No. Item Description of Item Unit Qty Rate Amount No
Erection Total 14790.00 Item- 10 CORE SOR Item No.17(a)Supply & erection of a single earth electrode. S No. Item Description of Item Unit Qty Rate Amount No
Erection AJMER DIVISION-ELECTRICAL/NORTH WESTERN RLY Total 42040.00 Item- 11 CORE SOR Item No.17(c)Supply and erection of earth bus. S No. Item Description of Item Unit Qty Rate Amount No
Erection Total 30300.00
Item Breakup - D-(Schedule-1, Section-4, Non-Ferrous)
Erection Total 1263688.00 CORE SOR Item No.12(d)Supply & erection of PTFE Neutral section for 2x25 kV AC Traction system. Item- 2 (UOM Should be read as Each Set) S No. Item Description of Item Unit Qty Rate Amount No
Erection Total 1665222.00 Item- 3 CORE SOR Item No.18(b)Supply & erection of Solid copper bus-bars 18mm. S No. Item Description of Item Unit Qty Rate Amount No
Erection Total 41172.00 CORE SOR Item No.18(c)(i)Supply & erection of solid copper bus-bar connectors: Bus terminal Item- 4 (6310). S No. Item Description of Item Unit Qty Rate Amount No
Erection Total 4734.00 Item- 5 CORE SOR Item No.18(c)(ii)Supply & erection of solid copper bus-bar connectors: Bus splice (6320). S No. Item Description of Item Unit Qty Rate Amount No
Erection Total 10340.00
Item Breakup - G-(Schedule-1, Section-9C, Copper Items)
Erection Total 203395.40
Item Breakup - H-NS ITEM
Erection Total 90390.00
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
DRM-TRD-10-2026-27.pdf
ATTACHMENT
Scheduleofratescopeandspecification.pdf Schedule of rate scope and specs
ATTACHMENT
GCCforWorks.pdf
ATTACHMENT
ExplanatoryNotesforSOR.pdf
ATTACHMENT
Scheduleofratescopeandspecification.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].