Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.8 LAccepted-Finance | L1 | Accepted-Finance Low | |
| 2 | L2₹12.2 L+₹37,136 (3.14%)Accepted-Finance | L2 | Accepted-Finance High |
Tender Value
₹12 L
EMD Value
₹12,000
Closing Date
4 Mar 2025, 3:00 pmClosed
BDO BP
KNR union at Padappai
Providing Cement Concrete Drainage and RCC Slab Culvert in Othaivaasai Street at Sethupet Panchayat
2025_RDTN_527230_1
637 / 12 / PUGF / Dated 03-12-2024
Open Tender
Civil Works - Roads
Works
120 days
Sethupet
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹12,000
4 Mar 2025
24 Feb 2025
4 Mar 2025
24 Feb 2025
4 Mar 2025
24 Feb 2025
Earth work excavation for foundation in all soils and sub-soils to full depth as may be directed In hard stiff clay, stiff blackcotton soil, hard red earth, shale murams, gravel stony earth and earth muds with 50%(fifty percent) fair size boulders and hard gravely soils(SS20B)
Supply & Filling of M sand from Approved quarry including cost & Conveyance of all materials, etc Complete complying with standard specification.
Cement Concrete 1:4:8 (one cement , five sand, and Ten hard broken stone) Using 40 mm gauge Hand Broken Granite stone jelly for Foundation including watering whenever necessary and laid in layers not more than 15 cm thick.compacting etc., complete
Cement Concrete 1:2:4 (one cement , two sand, and four hard broken stone) Using 20 mm gauge Hand Broken Granite stone jelly for Foundation including watering whenever necessary and laid in layers not more than 15 cm thick.compacting etc., complete
Supplying and erecting centering of sides and soffits including supports and strutting for plane surfaces etc. complete complying with standard specification and as directed
Plastering with CEMENT MORTAR 1:5 (one cement and Five sand) 20 mm. thick in all floor including curing etc.Complete complying with standard specification.
Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel grills for all RCC works as per design given including cost of steel and G.I. binding wire in all floors etc. complete
Cement Concrete 1:1-1/2:3 (One Cement, One and a half crushed stone M.Sand and Three hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc.
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
finance_627854.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .