| 1 | L1₹22.3 LAccepted-AOC CONSTRUCTION OF BOUNDARY WALL AND MAIN GATE OF GOVT AYURVEDIC DISPENSARY BUILDING AT BHUSKUNDA IN THE DISTRICT OF MAYURBHANJ | BALESHWAR | ODISHA | 756028 | ₹22.3 L | L1 | Accepted-AOC Seleted through the transparent lottery |
| 2 | L1₹22.3 LRejected-AOC ODISHA OD ODISHA | KENDUJHAR | ODISHA | 756121 | ₹22.3 L | L1 | Rejected-AOC Not Seleted through the transparent lottery |
| 3 | L1₹22.3 LRejected-AOC | ₹22.3 L | L1 | Rejected-AOC Not Seleted through the transparent lottery |
| 4 | L1₹22.3 LRejected-AOC AT PO PS HIRAKUD DIST SAMBALPUR PIN 768016 | SAMBALPUR | ODISHA | 768016 | ₹22.3 L | L1 | Rejected-AOC Not Seleted through the transparent lottery |
| 5 | L1₹22.3 LRejected-AOC | ₹22.3 L | L1 | Rejected-AOC Not Seleted through the transparent lottery |
Tender Value
₹22.3 L
EMD Value
₹22,400
Closing Date
29 May 2026, 5:00 pmClosed
SUPERINTENDING ENGINEER MAIN DAM DIVISION, BURLA
O/O- SUPERINTENDING ENGINEER MAIN DAM DIVISION, BURLA
Construction of a Masonary Platform Cum-Green room inside premises of Building Section Hirakud for the year 2026-27
2026_CEBBU_129512_2
MDD-e-02/205-26
Open Tender
Civil Works - Others
Percentage
120 days
BURLA
Please refer Tender documents.
2 documents required · 2 mandatory
₹6,000
₹22,400
Yes
8 Jul 2026
20 May 2026
30 May 2026
20 May 2026
29 May 2026
20 May 2026
20 May 2026 - 28 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation of foundation in hard of soil or gravelly soil with all leads, lifts and delifts including rough dressing and leveling the bed and depositing the excavated earth away from work site with cost of all labours and T&P etc complete as per direction of Engineer-in-charge. | 1 | Cum | 1 | ₹1 |
| 2 | Filling in foundation and plinth with sand well watered and rammed including cost, conveyance, royalty of all materials and cost of all labours and T&P etc. complete as per direction of Engineer-in-charge. | - | Cum | 1 | - |
| 3 | Cement concrete (1: 3 : 6) using hard granite crusher broken stone metal of 40mm.& down graded size of approved quality free from weathered skin and flakes including hoisting, laying and compacting the concrete to required thickness including proper watering, curing to required period with cost, conveyance, royality and taxes of all materials and cost of all labours, T&P etc. complete as per direction of Engineer-in-charge. | - | Cum | - | - |
| 4 | Brick work with Fly Ash brick in masonary (1:6) in foundation& Plinth using brick of size 23 x 11 x 8cm having crushing strength not less than 75 kg/cm2 with dimensional tolerance ± 8% including watering, curing to required period with cost, conveyance, royalty and taxes of all materials and cost of labours, T&P etc. complete as per direction of Engineer-in-charge. | 1 | Cum | - | - |
| 5 | Cement concrete (1 : 2 : 4 ) using 12mm. hard granite crusher broken chips of approved quality free from weathered skin and flakes including hoisting, laying and compacting the concrete to required thickness including proper watering, curing to required period with cost of all materials, conveyance, royality and cost of labours, T&P etc.complete as per direction of Engineer-in-charge. | 1 | Cum | 1 | ₹1 |
| 6 | Brick work with Fly Ash brick in masonary (1:6) in superstructure using brick of size 23 x 11 x 8cm having crushing strength not less than 75 kg/cm2 with dimensional tolerance ± 8% including watering, curing to required period with cost of all materials, conveyance, royalty and cost of labours, T&P etc. complete as per direction of Engineer-in-charge. | 1 | Cum | - | - |
| 7 | Providing straightening, cutting, bending, binding, fitting and placing uncoated HYSD bar reinforcement and laying in position including cost of binding wire 18mm to 20mm gauge and fixing of reinforcement including lapping (as per steel code) where necessary spot with cost of all materials, conveyance, and cost of all labours, T&P etc. complete as per direction of Engineer-in-charge. | - | Qntl | 1 | - |
| 8 | Rigid smooth centering and shuttering for R.C.C. works including false work and dismenteling the same after casting including cost of all materials, conveyance and cost of all labours, T&P etc. complete as per direction of Engineer-in-charge. (For RCC foundation, Plinth band and footing bases of column, Mass concrete, Precast slab etc.) | - | Sqm | - | - |
| 9 | Rigid smooth centering and shuttering for R.C.C. works including false work and dismenteling the same after casting including cost of all materials, conveyance and cost of all labours, T&P etc. complete as per direction of Engineer-in-charge. (For RCC beams, Columns, grider and bressmer etc.) | - | Sqm | - | - |
| 10 | Rigid smooth centering and shuttering for R.C.C. works including false work and dismenteling the same after casting including cost of all materials, conveyance and cost of all labours, T&P etc. complete as per direction of Engineer-in-charge. (For RCC floor and roof slabs, landing, balconies, projection sub-shades and chajja upto 4.30m height) | 1 | Sqm | - | - |
stage.html
html • 0.06 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_591953.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.19 MB
BOQ_591953.xls
BOQ • 0.31 MB
BID2.pdf
Tender Documents • 0.55 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .