Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance 121004 | Admitted-Finance |
| 2 | Admitted-Finance 101 PRIDE KUMAR SENATE BUILDING SENAPATI BAPAT ROAD SENAPATI BAPAT ROAD PUNE MAHARASHTRA 411016 | PUNE | MAHARASHTRA | 411016 | Admitted-Finance |
| 3 | Admitted-Finance 0 601 RUNWAL ANTHURIUM TOWER NO 5 OPP VEENA NAGAR L B S MULUND WEST MUMBAI MAHARASHTRA 400080 | MUMBAI SUBURBAN | MAHARASHTRA | 400080 | Admitted-Finance |
| 4 | Admitted-Finance N A | PALWAL | HARYANA | 121004 | Admitted-Finance |
| 5 | Admitted-Finance 405 406 MARBLE ARCH RACE COURSE CIRCLE VADODARA 390007 GUJARAT INDIA | VADODARA | VADODARA | GUJARAT | 390007 | Admitted-Finance |
Tender Value
Refer Docs
Closing Date
4 Jun 2022, 3:00 pmClosed
Mr.SUSHANT DESHPANDE
thyssenkrupp Industrial Solutions India Pvt Ltd Vikhroli Mumbai India
Supply of API CENTRIFUGAL PUMPS FOR MSB AND PFCC UNIT FOR NREP as per Technical Specifications for Numaligarh Refinery Limited
2022_NRL_681287_2
TK-1P22A-MP-RFQ-0054
Open Tender
Mechanical Tools and Equipment
Supply
365 days
Numaligarh Refinery Limited Assam
Please refer Tender documents.
8 documents required · 8 mandatory
₹0
Exempted
14 Sept 2022
20 Apr 2022
6 Jun 2022
20 Apr 2022
4 Jun 2022
4 May 2022
20 Apr 2022 - 27 Apr 2022
SUPPLY OF API CENTRIFUGAL PUMPS FOR MSB & PFCC UNIT FOR NREP
Design, engineering, procurement, fabrication, packaging, inspection, testing, transportation, route survey (if required) and SUPPLY OF API CENTRIFUGAL PUMPS FOR MSB & PFCC UNIT Hot Oil Recirculation Pumps (Tag No.: 1P22-PA-7701A/B/C) (Qty-3 Nos) with accessories, Commissioning Spares, as per details given in MR including any Special Tools and Tackles as specified in MR and Delivery as specified in the NIT.
Design, engineering, procurement, fabrication, packaging, inspection, testing, transportation, route survey (if required) and SUPPLY OF API CENTRIFUGAL PUMPS FOR MSB & PFCC UNIT -LP Condensate Pumps (Tag No.:1P24-PA-5601 A/B) (Qty-2 Nos) with accessories, Commissioning Spares, as per details given in MR including any Special Tools and Tackles as specified in MR and Delivery as specified in the NIT.
Design, engineering, procurement, fabrication, packaging, inspection, testing, transportation, route survey (if required) and SUPPLY OF API CENTRIFUGAL PUMPS FOR MSB & PFCC UNIT -Cooling Water Booster Pump (Tag No.: 1P23-PA-4301 A/B) (Qty-2 Nos) with accessories, Commissioning Spares, as per details given in MR including any Special Tools and Tackles as specified in MR and Delivery as specified in the NIT.
Design, engineering, procurement, fabrication, packaging, inspection, testing, transportation, route survey (if required) and SUPPLY OF API CENTRIFUGAL PUMPS FOR MSB & PFCC UNIT -Hot Oil Transfer Pumps (Tag No.: 1P22-PA-7702) (Qty-1 Nos) with accessories, Commissioning Spares, as per details given in MR including any Special Tools and Tackles as specified in MR and Delivery as specified in the NIT.
Design, engineering, procurement, fabrication, packaging, inspection, testing, transportation, route survey (if required) and SUPPLY OF API CENTRIFUGAL PUMPS FOR MSB & PFCC UNIT - LIGHT Flushing Oil Pumps (Tag No.: 1P25-PA-7401A/B ) (Qty-2 Nos) with accessories, Commissioning Spares, as per details given in MR including any Special Tools and Tackles as specified in MR and Delivery as specified in the NIT.
Design, engineering, procurement, fabrication, packaging, inspection, testing, transportation, route survey (if required) and SUPPLY OF API CENTRIFUGAL PUMPS FOR MSB & PFCC UNIT - HEAVY FLUSHING OIL PUMPS (Tag No.: 1P25-PA-7402A/B ) (Qty-2 Nos) with accessories, Commissioning Spares, as per details given in MR including any Special Tools and Tackles as specified in MR and Delivery as specified in the NIT.
Charges for SITE Supervision of Erection / Installation and Testing for SUPPLY OF API CENTRIFUGAL PUMPS FOR MSB & PFCC UNIT FOR NREP PROJECT
Per diem charges for upto 8 hours work on normal working days.
Overtime rate / hour beyond normal 8 hours work on normal working days.
Overtime rate / hour for work on weekly off days / holidays (as applicable to Refinery site).
Training Charges for SUPPLY OF API CENTRIFUGAL PUMPS FOR MSB & PFCC UNIT FOR NREP PROJECT as specified in Material Requisition.
Per diem charges for training as per MR
Description of Work / Item(s)
SUPPLY OF API CENTRIFUGAL PUMPS FOR MSB & PFCC UNIT FOR NREP
Design, engineering, procurement, fabrication, packaging, inspection, testing, transportation, route survey (if required) and SUPPLY OF API CENTRIFUGAL PUMPS FOR MSB & PFCC UNIT Hot Oil Recirculation Pumps (Tag No.: 1P22-PA-7701A/B/C) (Qty-3 Nos) with accessories, Commissioning Spares, as per details given in MR including any Special Tools and Tackles as specified in MR and Delivery as specified in the NIT.
Design, engineering, procurement, fabrication, packaging, inspection, testing, transportation, route survey (if required) and SUPPLY OF API CENTRIFUGAL PUMPS FOR MSB & PFCC UNIT -LP Condensate Pumps (Tag No.:1P24-PA-5601 A/B) (Qty-2 Nos) with accessories, Commissioning Spares, as per details given in MR including any Special Tools and Tackles as specified in MR and Delivery as specified in the NIT.
Design, engineering, procurement, fabrication, packaging, inspection, testing, transportation, route survey (if required) and SUPPLY OF API CENTRIFUGAL PUMPS FOR MSB & PFCC UNIT -Cooling Water Booster Pump (Tag No.: 1P23-PA-4301 A/B) (Qty-2 Nos) with accessories, Commissioning Spares, as per details given in MR including any Special Tools and Tackles as specified in MR and Delivery as specified in the NIT.
Design, engineering, procurement, fabrication, packaging, inspection, testing, transportation, route survey (if required) and SUPPLY OF API CENTRIFUGAL PUMPS FOR MSB & PFCC UNIT -Hot Oil Transfer Pumps (Tag No.: 1P22-PA-7702) (Qty-1 Nos) with accessories, Commissioning Spares, as per details given in MR including any Special Tools and Tackles as specified in MR and Delivery as specified in the NIT.
Design, engineering, procurement, fabrication, packaging, inspection, testing, transportation, route survey (if required) and SUPPLY OF API CENTRIFUGAL PUMPS FOR MSB & PFCC UNIT - LIGHT Flushing Oil Pumps (Tag No.: 1P25-PA-7401A/B ) (Qty-2 Nos) with accessories, Commissioning Spares, as per details given in MR including any Special Tools and Tackles as specified in MR and Delivery as specified in the NIT.
Design, engineering, procurement, fabrication, packaging, inspection, testing, transportation, route survey (if required) and SUPPLY OF API CENTRIFUGAL PUMPS FOR MSB & PFCC UNIT - HEAVY FLUSHING OIL PUMPS (Tag No.: 1P25-PA-7402A/B ) (Qty-2 Nos) with accessories, Commissioning Spares, as per details given in MR including any Special Tools and Tackles as specified in MR and Delivery as specified in the NIT.
Description of Work / Item(s)
Amount
BREAK-UP OF TOTAL MANDATORY SPARES PRICES SUPPLY OF API CENTRIFUGAL PUMPS FOR MSB & PFCC UNIT Hot Oil Recirculation Pumps (Tag No.: 1P22-PA-7701A/B/C) (Qty-3 Nos)
BREAK-UP OF TOTAL MANDATORY SPARES PRICES SUPPLY OF API CENTRIFUGAL PUMPS FOR MSB & PFCC UNIT -LP Condensate Pumps (Tag No.:1P24-PA-5601 A/B) (Qty-2 Nos)
BREAK-UP OF TOTAL MANDATORY SPARES PRICES SUPPLY OF API CENTRIFUGAL PUMPS FOR MSB & PFCC UNIT -Cooling Water Booster Pump (Tag No.: 1P23-PA-4301 A/B) (Qty-2 Nos)
BREAK-UP OF TOTAL MANDATORY SPARES PRICES SUPPLY OF API CENTRIFUGAL PUMPS FOR MSB & PFCC UNIT -Hot Oil Transfer Pumps (Tag No.: 1P22-PA-7702) (Qty-1 Nos)
BREAK-UP OF TWO YEARS OPERATIONAL SPARES SUPPLY OF API CENTRIFUGAL PUMPS FOR MSB & PFCC UNIT - LIGHT FLUSHING OIL PUMPS (Tag No.: 1P25-PA-7401A/B )
BREAK-UP OF TWO YEARS OPERATIONAL SPARES SUPPLY OF API CENTRIFUGAL PUMPS FOR MSB & PFCC UNIT - HEAVY FLUSHING OIL PUMPS (Tag No.: 1P25-PA-7402A/B )
Description of Work / Item(s)
Amount
BREAK-UP OF TWO YEARS OPERATIONAL SPARES SUPPLY OF API CENTRIFUGAL PUMPS FOR MSB & PFCC UNIT Hot Oil Recirculation Pumps (Tag No.: 1P22-PA-7701A/B/C) (Qty-3 Nos)
BREAK-UP OF TWO YEARS OPERATIONAL SPARES SUPPLY OF API CENTRIFUGAL PUMPS FOR MSB & PFCC UNIT -LP Condensate Pumps (Tag No.:1P24-PA-5601 A/B) (Qty-2 Nos)
BREAK-UP OF TWO YEARS OPERATIONAL SPARES SUPPLY OF API CENTRIFUGAL PUMPS FOR MSB & PFCC UNIT -Cooling Water Booster Pump (Tag No.: 1P23-PA-4301 A/B) (Qty-2 Nos)
BREAK-UP OF TWO YEARS OPERATIONAL SPARES SUPPLY OF API CENTRIFUGAL PUMPS FOR MSB & PFCC UNIT -Hot Oil Transfer Pumps (Tag No.: 1P22-PA-7702) (Qty-1 Nos)
BREAK-UP OF TWO YEARS OPERATIONAL SPARES SUPPLY OF API CENTRIFUGAL PUMPS FOR MSB & PFCC UNIT - LIGHT FLUSHING OIL PUMPS (Tag No.: 1P25-PA-7401A/B )
BREAK-UP OF TWO YEARS OPERATIONAL SPARES SUPPLY OF API CENTRIFUGAL PUMPS FOR MSB & PFCC UNIT - HEAVY FLUSHING OIL PUMPS (Tag No.: 1P25-PA-7402A/B )
KSB LIMITED
Flowserve India Controls Private Limited
Sulzer Pumps India Pvt. Ltd.
Kirloskar Ebara Pumps Limited
KSB LIMITED
RUHRPUMPEN INDIA PRIVATE LIMITED
Flowserve India Controls Private Limited
Sulzer Pumps India Pvt. Ltd.
Flowserve India Controls Private Limited
Sulzer Pumps India Pvt. Ltd.
RUHRPUMPEN INDIA PRIVATE LIMITED
Kirloskar Ebara Pumps Limited
Flowserve India Controls Private Limited
RUHRPUMPEN INDIA PRIVATE LIMITED
Kirloskar Ebara Pumps Limited
KSB LIMITED
Design, engineering, procurement, fabrication, packaging, inspection, testing, transportation, route survey (if required) and SUPPLY OF API CENTRIFUGAL PUMPS FOR MSB & PFCC UNIT -Cooling Water Booster Pump (Tag No.: 1P23-PA-4301 A/B) (Qty-2 Nos) with accessories, Commissioning Spares, as per details given in MR including any Special Tools and Tackles as specified in MR and Delivery as specified in the NIT.
Design, engineering, procurement, fabrication, packaging, inspection, testing, transportation, route survey (if required) and SUPPLY OF API CENTRIFUGAL PUMPS FOR MSB & PFCC UNIT Hot Oil Recirculation Pumps (Tag No.: 1P22-PA-7701A/B/C) (Qty-3 Nos) with accessories, Commissioning Spares, as per details given in MR including any Special Tools and Tackles as specified in MR and Delivery as specified in the NIT.
Sulzer Pumps India Pvt. Ltd.
Kirloskar Ebara Pumps Limited
Design, engineering, procurement, fabrication, packaging, inspection, testing, transportation, route survey (if required) and SUPPLY OF API CENTRIFUGAL PUMPS FOR MSB & PFCC UNIT Hot Oil Recirculation Pumps (Tag No.: 1P22-PA-7701A/B/C) (Qty-3 Nos) with accessories, Commissioning Spares, as per details given in MR including any Special Tools and Tackles as specified in MR and Delivery as specified in the NIT.
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .