Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.0 CrAccepted-AOC 0 BAGHI NAUGARH NAUGARH CHANDAULI UTTAR PRADESH 232111 | CHANDAULI | UTTAR PRADESH | 232111 | L1 | Accepted-AOC LOWEST | |
| 2 | L2₹3.0 Cr+₹19,009.20 (0.06%)Rejected-Finance MOHALLA SARASWATI NAGAR DISTRICT BAHRAICH | BAHRAICH | UTTAR PRADESH | 271801 | L2 | Rejected-Finance HIGH RATE BIDDER | |
| 3 | L3₹3.1 Cr+₹4.9 L (1.64%)Rejected-Finance GRAM DERE RRAJA POST PANAPUR TEHSIL GAUSPUR DISTRICT BARABANKI UTTAR PRADESH | GAUSPUR | BARABANKI | UTTAR PRADESH | L3 | Rejected-Finance HIGH RATE BIDDER | |
| 4 | L4₹3.1 Cr+₹7.9 L (2.64%)Rejected-Finance | L4 | Rejected-Finance HIGH RATE BIDDER | |
| 5 | L5₹3.2 Cr+₹20.2 L (6.72%)Rejected-Finance NEAR KATI CHAURAHA HUZURPUR ROAD BAHRAICH | BAHRAICH | UTTAR PRADESH | 271801 | L5 | Rejected-Finance HIGH RATE BIDDER |
| Sl No | Description | Qty | Unit | M/S K.K. TRADERS L4 | M/S SENGER CONSTRUCTION L5 | M/S Singh Construction L6 | AKANKSHA ASSOCIATES L1 | M P Traders L2 | MAMTA SHARMA CONTRACTOR CO BARABANKI L3 | M/S PRABHAT TRADERS L7 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Earth work in excavation of side drain in all type of soil with proper disposal of earth including all lead & lift, levelling, dressing to profile and manual compaction etc required for proper completion of work. as per direction of Engineer-in-charge. | 33,503.86 | M3 | 29.99 ₹10,04,780.76 Lowest | 51 ₹17,08,696.86 | 40 ₹13,40,154.4 | 52.28 ₹17,51,581.8 | 41 ₹13,73,658.26 | 59 ₹19,76,727.74 | 35 ₹11,72,635.1 |
| 2.00 | Earth work in excavation of foundation in all type of soil with back filling and proper disposal of surplus earth including all lead & lift, levelling, dressing and manual compaction etc required for proper completion of work | 11,628.68 | M3 | 49.99 ₹5,81,317.71 Lowest | 51 ₹5,93,062.68 | 60 ₹6,97,720.8 | 81.22 ₹9,44,481.39 | 50 ₹5,81,434 | 99 ₹11,51,239.32 | 50 ₹5,81,434 |
| 3.00 | Supplying & laying Geotextile sheet 200 GSM woven multifilament polypropylene yarn on slope with pegs including all cost of material, labour, T&P etc required for proper completion of work | 12,667.05 | M2 | 99.99 ₹12,66,578.33 | 60 ₹7,60,023 Lowest | 75 ₹9,50,028.75 | 102.52 ₹12,98,600.63 | 85 ₹10,76,699.25 | 99 ₹12,54,037.95 | 100 ₹12,66,705 |
| 4.00 | Laying C.C 1:2:4 with cement, Hamirpur coarse sand and 4.75mm to 20mm Kabrai stone grit with mixing, laying, curing, ramming, including cost of all material, labour T&P etc required for proper completion of work. | 54.94 | M3 | 8,111.99 ₹4,45,672.73 | 10,000 ₹5,49,400 | 9,500 ₹5,21,930 | 8,400 ₹4,61,496 | 8,000 ₹4,39,520 Lowest | 8,382 ₹4,60,507.08 | 9,500 ₹5,21,930 |
| 5.00 | Supplying & laying Mirzapur cut stone boulder 25 kg to 60 kg of size approx. 20cm x 20cm x 15cm manually placed and closely packed in pitching including cost of all material, labour T&P etc required for proper completion of work. | 3,547.48 | M3 | 4,149.99 ₹1,47,22,006.53 | 4,800 ₹1,70,27,904 | 4,600 ₹1,63,18,408 | 4,050 ₹1,43,67,294 Lowest | 4,300 ₹1,52,54,164 | 4,216 ₹1,49,56,175.68 | 4,800 ₹1,70,27,904 |
| 6.00 | Supplying & laying Mirzapur cut stone boulder 25 kg to 60 kg of size approx. 20cm x 20cm x 15cm manually placed & closely packed in 8 SWG G.I. wire crate of size 1.0M x 1.0M x 1.0M, Mesh size 20cm x 20cm double knotted including all cost of material, labour, T&P etc required for proper completion of work including cost of wire crate. | 254.85 | M3 | 5,449.99 ₹13,88,929.95 | 5,500 ₹14,01,675 | 5,300 ₹13,50,705 | 5,000 ₹12,74,250 Lowest | 5,200 ₹13,25,220 | 5,100 ₹12,99,735 | 5,500 ₹14,01,675 |
| 7.00 | Laying C.C 1:1.5:3 with cement, Hamirpur coarse sand & 4.75 to 20mm Kabrai stone grit with mechanical mixing, vibration, laying, curing including cost of all material, labour, T&P etc required for proper completion of work. | 19.61 | M3 | 9,999.99 ₹1,96,099.8 | 11,000 ₹2,15,710 | 9,500 ₹1,86,295 | 8,900 ₹1,74,529 Lowest | 9,200 ₹1,80,412 | 9,120 ₹1,78,843.2 | 10,500 ₹2,05,905 |
| 8.00 | Centering & Shuttering for C.C work with cost of shuttering including cost of all material, labour, T&P etc required for proper completion of work | 816.55 | M2 | 251.99 ₹2,05,762.43 | 251 ₹2,04,954.05 | 300 ₹2,44,965 | 313.86 ₹2,56,284.67 | 150 ₹1,22,482.5 Lowest | 350 ₹2,85,792.5 | 250 ₹2,04,137.5 |
| 9.00 | Making subgrade for boulder pitching work including watering, ramming and preparation of surface including all lead & lift, levelling, dressing etc required for proper completion of work as per direction of Engineer-in-charge. | 11,829.15 | M2 | 17.99 ₹2,12,806.41 | 10 ₹1,18,291.5 | 10 ₹1,18,291.5 | 14.19 ₹1,67,912.42 | 10 ₹1,18,291.5 | 13.1 ₹1,54,961.86 | 5 ₹59,145.75 Lowest |
| 10.00 | First class 150 Brick work in 1:4 C.M. with cement & coarse sand including all cost of material, labour, T&P etc required for proper completion of work | 1,292.95 | M3 | 6,899.99 ₹89,21,342.07 | 5,551 ₹71,77,165.45 | 6,400 ₹82,74,880 | 5,600 ₹72,40,520 | 5,975 ₹77,25,376.25 | 5,290 ₹68,39,705.5 Lowest | 6,800 ₹87,92,060 |
Tender Value
₹4.0 Cr
EMD Value
₹7.9 L
Closing Date
3 Aug 2026, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SUPERINTENDING ENGINEER
IX CIRCLE IRRIGATION WORKS BAHRAICH
Construction of Side drain and Protection work on left bank of Rapti Main canal from km 25.500 to Km. 28.00 in District Shrawasti.
2026_UPIDC_1167986_6
01/SE-IX/2026-27
Open Tender
Civil Works
Item Rate
180 days
BHINGA, SHRAWASTI
Please refer Tender documents.
2 documents required · 2 mandatory
₹6,681
₹7.9 L
IX CIRCLE IRRIGATION WORKS BAHRAICH
31 Oct 2026
13 Jul 2026
3 Aug 2026
13 Jul 2026
3 Aug 2026
13 Jul 2026
13 Jul 2026
90 days
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0.0 | Earth work in excavation of side drain in all type of soil with proper disposal of earth including all lead & lift, levelling, dressing to profile and manual compaction etc required for proper completion of work. as per direction of Engineer-in-charge. | 33,503.86 | M3 | 67.5 | ₹22,61,510.55 |
| 0.0 | Earth work in excavation of foundation in all type of soil with back filling and proper disposal of surplus earth including all lead & lift, levelling, dressing and manual compaction etc required for proper completion of work | 11,628.68 | M3 | 104 | ₹12,09,382.72 |
| 0.0 | Supplying & laying Geotextile sheet 200 GSM woven multifilament polypropylene yarn on slope with pegs including all cost of material, labour, T&P etc required for proper completion of work | 12,667.05 | M2 | 131 | ₹16,59,383.55 |
| 0.0 | Laying C.C 1:2:4 with cement, Hamirpur coarse sand and 4.75mm to 20mm Kabrai stone grit with mixing, laying, curing, ramming, including cost of all material, labour T&P etc required for proper completion of work. | 54.94 | M3 | 11,030.26 | ₹6,06,002.48 |
| 0.0 | Supplying & laying Mirzapur cut stone boulder 25 kg to 60 kg of size approx. 20cm x 20cm x 15cm manually placed and closely packed in pitching including cost of all material, labour T&P etc required for proper completion of work. | 3,547.48 | M3 | 5,437.62 | ₹1,92,89,848.2 |
| 0.0 | Supplying & laying Mirzapur cut stone boulder 25 kg to 60 kg of size approx. 20cm x 20cm x 15cm manually placed & closely packed in 8 SWG G.I. wire crate of size 1.0M x 1.0M x 1.0M, Mesh size 20cm x 20cm double knotted including all cost of material, labour, T&P etc required for proper completion of work including cost of wire crate. | 254.85 | M3 | 6,462.62 | ₹16,46,998.71 |
| 0.0 | Laying C.C 1:1.5:3 with cement, Hamirpur coarse sand & 4.75 to 20mm Kabrai stone grit with mechanical mixing, vibration, laying, curing including cost of all material, labour, T&P etc required for proper completion of work. | 19.61 | M3 | 11,622 | ₹2,27,907.42 |
| 0.0 | Centering & Shuttering for C.C work with cost of shuttering including cost of all material, labour, T&P etc required for proper completion of work | 816.55 | M2 | 400 | ₹3,26,620 |
| 0.0 | Making subgrade for boulder pitching work including watering, ramming and preparation of surface including all lead & lift, levelling, dressing etc required for proper completion of work as per direction of Engineer-in-charge. | 11,829.15 | M2 | 20 | ₹2,36,583 |
| 0.0 | First class 150 Brick work in 1:4 C.M. with cement & coarse sand including all cost of material, labour, T&P etc required for proper completion of work | 1,292.95 | M3 | 7,280.64 | ₹94,13,503.49 |
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.94 MB
LOT06.pdf
Tender Documents • 5.21 MB
BOQ_2190595.xls
BOQ • 0.28 MB
BOQ_2190595.xls
PDF • 0.31 MB
DATE.pdf
PDF • 0.26 MB
BOQ06.xls
PDF • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .