Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance NO 4 ARANMANAI RAMASAMY KOTHANAR WEST STREET RAMANATHAPURAM | RAMANATHAPURAM | TAMIL NADU | 623115 | Admitted-Finance |
| 2 | Admitted-Finance 97 1 YADHAVA STREET VELIPATTINAM RAMANATHAPURAM 523504 | 523504 | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹38,000
Closing Date
8 Aug 2022, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Additional Collector( Dev), RDDA,Ramanathapuram
District Rural Development Agency, Ramanathapuram
Rejuvenation of Water Bodies in Package No.RMD-1/AGAMT 2021-22 of Ramanathapuram Block in Ramanathapuram District under AGAMT 2021-22
2022_RDTN_242238_1
R7/5593/2021/dated 05.07.2022 RMD-1
Open Tender
Civil Works
Item Rate
180 days
RDDA
Refer to Tender
6 documents required · 6 mandatory
₹0
₹38,000
District Rural Development Agency, Ramanathapuram
9 Sept 2022
18 Jul 2022
8 Aug 2022
18 Jul 2022
8 Aug 2022
20 Jul 2022
20 Jul 2022
90 days
Amount
1. Improvements of Sommu Pillai Oorani,Construction of Bathing Ghate and inlet with Revertment in Karukudi Panchayat
Clearing light jungles and clearing away carefully and burning it including all labour charges etc. (Annexure III - A2)
Earth work excavation in all classes of soils and subsoils except in hard rock requiring blastering and coveying for formation of bund with lead of 0 to 100m deploying earth moving machineries and tippers including benching and formation of bunds sectioning etc., completed. (Annexure III - F1)
Revertment dry Packing
Earthwork excavation and depositing on bank with initial lead and lift in hard stiff clay siff block cotton hard red earth shales murrums, gravel stoney earth, earth mixed 50% fair sized boulders and hard gravelly soil as per 63 20B SI 61 per specification
Sand filling with M-sand and well rammed, watered and consolidated complying with standard specification, including cost and conveyance of material and labour charges etc., complete.
Cement Concrete 1:4:8 (One cement four sand and Eight hard broken stone) using 40mm. Gauge hand broken granite stone jelly for foundation including watering wherever necessary and laid in layers not more than 15 cm. thick, compacting etc. complete complying with standard specification and as directed
Cement Concrete 1:3:6 (One cement four sand and Eight hard broken stone) using 20mm. Gauge hand broken granite stone jelly for foundation including watering wherever necessary and laid in layers not more than 15 cm. thick, compacting etc. complete complying with standard specification and as directed
Supplying and erecting centering shuttering including necessary supports for plane
Gravel backing for revetments including cost andconveyance and all labour charges etc complete - 10 cum.
Rough stone dry packing for aprons and revetments including cost and conveyance and all labour charges etc complete
Bathing Ghate
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B
Collection and supply of sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard specifications
Cement Concrete 1:4:8 mix using 40 mm ISS HBG metal including cost and conveyace of all materials and all labour charges, etc.
Cement Concrete 1:3:6 (One cement four sand and Eight hard broken stone) using 20mm. Gauge hand broken granite stone jelly for foundation
Supplying and erecting centering shuttering including necessary supports for plane
Supplying and Fabrication of steel Including cost and Conveyance of bending to shape in all position
RCC 1:2:4 using 20mm gauge hard brokengrainate stone jelly for all labour coast
Plastering with cement mortar 1:5 mix to 20 mm thick including,cost and conveyance of all materials to site and all labour
Exterior Emulsion painting two Coats with Best Approved Quality and colour Paint Over one coat of base coat Incuding cost and conveyance
2.-Improvements of Mudukutharavai Villege in Alamarathu oorani Construction of Bathing Ghate inlet in Thekkutharavai Panchayat
Clearing light jungles and clearing away carefully and burning it including all labour charges etc. (Annexure III - A2)
Earth work excavation in all classes of soils and subsoils except in hard rock requiring blastering and coveying for formation of bund with lead of 0 to 100m deploying earth moving machineries and tippers including benching and formation of bunds sectioning etc., completed. (Annexure III - F1)
Bathing Ghate
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B
Collection and supply of sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard specifications
Cement Concrete 1:4:8 mix using 40 mm ISS HBG metal including cost and conveyace of all materials and all labour charges, etc.
Cement Concrete 1:3:6 (One cement four sand and Eight hard broken stone) using 20mm. Gauge hand broken granite stone jelly for foundation
Supplying and erecting centering shuttering including necessary supports for plane
Supplying and Fabrication of steel Including cost and Conveyance of bending to shape in all position
RCC 1:2:4 using 20mm gauge hard brokengrainate stone jelly for all labour coast
Exterior Emulsion painting two Coats with Best Approved Quality and colour Paint Over one coat of base coat Incuding cost and conveyance
Inlet
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B
Collection and supply of sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard specifications
Cement Concrete 1:4:8 mix using 40 mm ISS HBG metal including cost and conveyace of all materials and all labour charges, etc.
Cement Concrete 1:3:6 (One cement four sand and Eight hard broken stone) using 20mm. Gauge hand broken granite stone jelly for foundation
Supplying and erecting centering shuttering including necessary supports for plane
Supplying cost of RCC pipe and Calour 0.60mm dia including all tha labour
3.Improvements of Amman kovil Villege,Pappathi amman Kovil Oorani Construction of Bathing Ghat,inlet in Thekkutharavai Panchayat
Clearing light jungles and clearing away carefully and burning it including all labour charges etc. (Annexure III - A2)
Earth work excavation in all classes of soils and subsoils except in hard rock requiring blastering and coveying for formation of bund with lead of 0 to 100m deploying earth moving machineries and tippers including benching and formation of bunds sectioning etc., completed. (Annexure III - F1)
Bathing Ghate
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B
Collection and supply of sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard specifications
Cement Concrete 1:4:8 mix using 40 mm ISS HBG metal including cost and conveyace of all materials and all labour charges, etc.
Cement Concrete 1:3:6 (One cement four sand and Eight hard broken stone) using 20mm. Gauge hand broken granite stone jelly for foundation
Supplying and erecting centering shuttering including necessary supports for plane
Supplying and Fabrication of steel Including cost and Conveyance of bending to shape in all position
RCC 1:2:4 using 20mm gauge hard brokengrainate stone jelly for all labour coast
Plastering with cement mortar 1:5 mix to 20 mm thick including,cost and conveyance of all materials to site and all labour
Exterior Emulsion painting two Coats with Best Approved Quality and colour Paint Over one coat of base coat Incuding cost and conveyance
Inlet 1
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B
Collection and supply of sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard specifications
Cement Concrete 1:4:8 mix using 40 mm ISS HBG metal including cost and conveyace of all materials and all labour charges, etc.
Cement Concrete 1:3:6 (One cement four sand and Eight hard broken stone) using 20mm. Gauge hand broken granite stone jelly for foundation
Supplying and erecting centering shuttering including necessary supports for plane
Supplying cost of RCC pipe and Calour 0.60mm dia including all tha labour
Inlet 2
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B
Collection and supply of sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard specifications
Cement Concrete 1:4:8 mix using 40 mm ISS HBG metal including cost and conveyace of all materials and all labour charges, etc.
Cement Concrete 1:3:6 (One cement four sand and Eight hard broken stone) using 20mm. Gauge hand broken granite stone jelly for foundation
Supplying and erecting centering shuttering including necessary supports for plane
Supplying cost of RCC pipe and Calour 0.60mm dia including all tha labour
4.Improvements of Thekutharvai Villege,Mohamathiaya Oorani Construction of Bathing Ghat,inlet in Thekkutharavai Panchayat
Clearing light jungles and clearing away carefully and burning it including all labour charges etc. (Annexure III - A2)
Earth work excavation in all classes of soils and subsoils except in hard rock requiring blastering and coveying for formation of bund with lead of 0 to 100m deploying earth moving machineries and tippers including benching and formation of bunds sectioning etc., completed. (Annexure III - F1)
Bathing Ghate
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B
Collection and supply of sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard specifications
Cement Concrete 1:4:8 mix using 40 mm ISS HBG metal including cost and conveyace of all materials and all labour charges, etc.
Cement Concrete 1:3:6 (One cement four sand and Eight hard broken stone) using 20mm. Gauge hand broken granite stone jelly for foundation
Supplying and erecting centering shuttering including necessary supports for plane
Supplying and Fabrication of steel Including cost and Conveyance of bending to shape in all position
RCC 1:2:4 using 20mm gauge hard brokengrainate stone jelly for all labour coast
Exterior Emulsion painting two Coats with Best Approved Quality and colour Paint Over one coat of base coat Incuding cost and conveyance
Inlet 1
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B
Collection and supply of sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard specifications
Cement Concrete 1:4:8 mix using 40 mm ISS HBG metal including cost and conveyace of all materials and all labour charges, etc.
Cement Concrete 1:3:6 (One cement four sand and Eight hard broken stone) using 20mm. Gauge hand broken granite stone jelly for foundation
Supplying and erecting centering shuttering including necessary supports for plane
Supplying cost of RCC pipe and Calour 0.60mm dia including all tha labour
Inlet 2
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B
Collection and supply of sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard specifications
Cement Concrete 1:4:8 mix using 40 mm ISS HBG metal including cost and conveyace of all materials and all labour charges, etc.
Cement Concrete 1:3:6 (One cement four sand and Eight hard broken stone) using 20mm. Gauge hand broken granite stone jelly for foundation
Supplying and erecting centering shuttering including necessary supports for plane
Supplying cost of RCC pipe and Calour 0.60mm dia including all tha labour
5.-Improvements of AD Colony Habitation oorani and Construction of bathing Ghat in Kavanoor Panchayat
Bathing Ghate
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B
Collection and supply of sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard specifications
Cement Concrete 1:4:8 mix using 40 mm ISS HBG metal including cost and conveyace of all materials and all labour charges, etc.
Cement Concrete 1:3:6 (One cement four sand and Eight hard broken stone) using 20mm. Gauge hand broken granite stone jelly for foundation
Supplying and erecting centering shuttering including necessary supports for plane
Supplying and Fabrication of steel Including cost and Conveyance of bending to shape in all position
RCC 1:2:4 using 20mm gauge hard brokengrainate stone jelly for all labour coast
Plastering with cement mortar 1:5 mix to 20 mm thick including,cost and conveyance of all materials to site and all labour
Exterior Emulsion painting two Coats with Best Approved Quality and colour Paint Over one coat of base coat Incuding cost and conveyance
6.Improvements of The Periya Oorani in Kavanoor villege and Construction of retaining Wall in Kavanoor Panchayat
Clearing light jungles and clearing away carefully and burning it including all labour charges etc. (Annexure III - A2)
Earth work excavation in all classes of soils and subsoils except in hard rock requiring blastering and coveying for formation of bund with lead of 0 to 100m deploying earth moving machineries and tippers including benching and formation of bunds sectioning etc., completed. (Annexure III - F1)
Retaining Wall
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B
Collection and supply of sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard specifications
Cement Concrete 1:4:8 mix using 40 mm ISS HBG metal including cost and conveyace of all materials and all labour charges, etc.
Cement Concrete 1:3:6 (One cement four sand and Eight hard broken stone) using 20mm. Gauge hand broken granite stone jelly for foundation
Supplying and erecting centering shuttering including necessary supports for plane
Outlet
Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B
Collection and supply of sand and filling in to the basement including cost and conveyance to the siteand all labour charges for filling as per standard specifications
Cement Concrete 1:4:8 mix using 40 mm ISS HBG metal including cost and conveyace of all materials and all labour charges, etc.
Cement Concrete 1:3:6 (One cement four sand and Eight hard broken stone) using 20mm. Gauge hand broken granite stone jelly for foundation
Supplying and erecting centering shuttering including necessary supports for plane
Supplying cost of RCC pipe and Calour 0.60mm dia including all tha labour
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
VENKATESWARA CONSTRUCITON
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .