| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.3 LAccepted-Finance | L1 | Accepted-Finance BOQ Admitted | |
| 2 | L2₹1.7 L+₹43,000 (33.3%)Accepted-Finance | L2 | Accepted-Finance BOQ Admitted | |
| 3 | L3₹1.9 L+₹61,000 (47.3%)Accepted-Finance 2 116 K KARSHINI ILLAM NEW SUNDARAM NAGAR WEST KORAMPALLAM TUTICORIN 628 101 | TUTICORIN | TAMIL NADU | 628101 | L3 | Accepted-Finance BOQ Admitted | |
| 4 | Rejected-Technical TUTICORIN TAMIL NADU | TUTICORIN | TAMIL NADU | 626202 | - | Rejected-Technical BQR No.2 not accepted |
Tender Value
₹1.7 L
EMD Value
₹1,700
Closing Date
28 Mar 2022, 3:45 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Chief Engineer/TTPS
O/o CE/TTPS
223-ECHP-I-Replacement of rotor assy
2022_EB_225782_1
223-ECHP-I-Replacement of rotor assy
Open Tender
Miscellaneous Works
Works
15 days
TTPS
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹1,700
13 Apr 2022
15 Mar 2022
29 Mar 2022
15 Mar 2022
28 Mar 2022
15 Mar 2022
90 days
Replacement of worn out rotor shaft assembly in Crusher A.
Charges for removal of worn-out rotor shaft assembly from crusher ‘A’ after removing the flange coupling bolts, crusher top cover, chute liner, receiving chute front cover, Plummer block bed bolts on both side etc., and shifting to screen floor – Removal of worn out centre discs, end discs, disc spacer, flange coupling, both end of bearings from Plummer blocks in the existing worn out rotor assembly - Drawal of related materials from stores - Cleaning the entire length of reconditioned rotor shaft at ground floor – All the related spare materials shifting to assembling work spot – Assembling the spares like centre discs, end discs, disc spacer, frame seal sleeve, suspension bars in the spare reconditioned rotor shaft and well tightened the both end lock nuts – lifting the assembled crusher rotor shaft from ground floor to screen floor - complete cleaning of bearing seating area of rotor shaft and then assembling of both end new bearings, sleeves distance sleeve labyrinth with Plummer blocks etc…-After assembling of bearings with plummer blocks then checking the bearing clearance and free rotation of plummer blocks on both sides – Shifting the new bearing assembly rotor shaft from screen floor to crusher floor and positioning with proper location of crusher A rotor seating area -oil heating the rotor shaft flange coupling and then assembled in drive end side of rotor shaft - After proper seating of rotor shaft assembly then all the plummer block fixing bolts are provided - Alignment of rotor shaft assembly with respect to jack shaft driven pulley and rotor freeness and bearing clearance checked end well tightened – After completion of all works then assembling of crusher liners, top cover and other released items - Finally connecting the flange coupling bolt and conducting trail running of crusher A including hire charges for T&P’s and all other consumables, etc., complete.
SANTHANAKUMAR ENTERPRISES
GAYATHRI ENGINEERING ENTERPRISES
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .