Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹11.4 LAdmitted-Finance GOA | L1 | Admitted-Finance | ||
| 2 | L2₹13.8 L+₹2.4 L (21.3%)Admitted-Finance BHO 834 1 DEVACHAHAVADA PANAS SANVORDEM GOA | SOUTH GOA | GOA | 403103 | L2 | Admitted-Finance |
Tender Value
₹13.2 L
EMD Value
₹26,394
Closing Date
21 Sept 2026, 1:00 pmClosed
VP Sarpanch
VP Bandora
Reconstruction of existing crematorium with room and other works at Kharwade in ward No.06 in VP Bandora Ponda Taluka
2026_VP_31799_1
VPB/BAN/NIT/26-27/660
Open Tender
Civil Works - Buildings
Works
90 days
VP Bandora
Please refer Tender documents.
5 documents required · 5 mandatory
₹5,000
₹26,394
7 Oct 2026
11 Sept 2026
23 Sept 2026
11 Sept 2026
21 Sept 2026
11 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling G.I. sheets roofing including ridges, hips valleys and gutters etc. and stacking the material within 50 meters lead. | 30 | M2 | 78 | ₹2,340 |
| 2 | Dismantling steelwork in built up sections in angles, tees, flats and channels including all gusset plates bolts, nuts, cutting dismembering and staking within 50 mts. Lead | 4.18 | Qtls | 293 | ₹1,224.74 |
| 3 | Demolishing R.C.C. work including stacking of steel bars & disposal of unserviceable within 50 mts. lead. | 2.82 | M3 | 1,618 | ₹4,562.76 |
| 4 | Demolishing laterite stone masonry in cement mortar including stacking of serviceable material & disposal of unserviceable material within 50 mts. lead. | 1.47 | M3 | 1,136 | ₹1,669.92 |
| 5Earthwork in excavation by mechanical means (hydraulic excavator)/manual means in foundation pipeline trenches drain (not exceeding 1.5 m in width or 10 sq.m. on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m including getting out the excavated soil and disposal of surplus excavated soil as directed within a lead of 50 m. | |||||
| 5.01 | All kinds of soil | 73.28 | M3 | 291 | ₹21,324.48 |
| 6 | Rubble packing with hard laterite stone under floors including watering ramming and consolidating etc. in pipeline trenches and other foundations complete. | 23.41 | M3 | 2,211 | ₹51,759.51 |
| 7 | Providing & laying cement concrete 1:3:6 (1 cement: 3 coarse sand: 6 graded granitic or basaltic stone aggrt. 20 mm. nominal size)
excluding cost of centering, shuttering and finishing in a) All works upto plinth level | 13.03 | M3 | 6,325 | ₹82,414.75 |
| 8Centering & shuttering including Strutting, Propping & removal of forms for : | |||||
| 8.01 | Foundations, Footings, Bases for columns | 20.04 | M2 | 407 | ₹8,156.28 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.36 MB
BOQ_32179.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .