Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹7.1 CrAdmitted-Finance | -24.99% | ₹7.1 Cr | L1 | Admitted-Finance |
| 2 | L2₹8.0 Cr+₹94.4 L (13.4%)Admitted-Finance | -14.97% | ₹8.0 Cr+₹94.4 L (13.4%) | L2 | Admitted-Finance |
| 3 | L3₹8.2 Cr+₹1.2 Cr (16.6%)Admitted-Finance 401 THE GRAND MALL OPP STATE BANK ZONAL OFFICE S M ROAD AMBAWADI AHMEDABAD 380015 | AHMADABAD | GUJARAT | 380015 | -12.51% | ₹8.2 Cr+₹1.2 Cr (16.6%) | L3 | Admitted-Finance |
| 4 | L4₹8.5 Cr+₹1.5 Cr (21.0%)Admitted-Finance | -9.26% | ₹8.5 Cr+₹1.5 Cr (21.0%) | L4 | Admitted-Finance |
| 5 | L5₹9.0 Cr+₹1.9 Cr (27.4%)Admitted-Finance | -4.41% | ₹9.0 Cr+₹1.9 Cr (27.4%) | L5 | Admitted-Finance |
Tender Value
₹9.4 Cr
EMD Value
₹18.8 L
Closing Date
17 Jun 2026, 6:00 pmClosed
EE, ADA, Ajmer
ADA, Ajmer
Levelling, Dressing and Construction of Road upto GSB level and drainage work at Trithraj Pushkar Farm House, Scheme, Kanas.
2026_ADA_561778_1
NIT 06 (1)/2026-27
Open Tender
Civil Works
Percentage
270 days
ADA
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,000
Yes
ADA, Ajmer
₹18.8 L
Yes
ADA, Ajmer
3 Aug 2026
22 May 2026
18 Jun 2026
22 May 2026
17 Jun 2026
22 May 2026
2 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Site clearance including uprooting of rank vegetation, bushes, woods, trees and sapplings of girth upto 150mm and removal of rubbish etc. complete | 3,45,000 | 100 sqm | 0.99 | ₹3,41,550 |
| 2 | Earth work in excavation including stacking/ disposal of surplus earth with all lifts and lead upto 1000 meters exclusive of compensation of earth (MoRTH specification Clause 301 to 305). In ordInary soil. Mechanically by power shovel including mechanical loading and carriage upto 1 km by tipper/dumper | 1,34,400 | Cum | 35.2 | ₹47,30,880 |
| 3 | Extra for watering the earth to bring the earth upto required O.M.C excluding rolling | 10,980 | Cum | 9.9 | ₹1,08,702 |
| 4 | Extra for rolling to specification with the use of vibratory roller when earth is at suitable moisture content with desired density excluding watering. Field density not less than 95% of maximum dry density (Modified
Heavy Proctor test) | 10,980 | Cum | 8 | ₹87,840 |
| 5 | Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5with lead 500mtr to 1000 mtr | 3,02,600 | Cum | 121 | ₹3,66,14,600 |
| 6 | Providing and laying granular sub-base material having P.I.not more than 6, including compacted thickness and consolidation by 8-10 tonne power roller at OMC to achieve desired density to required camber and grade including cost of water and hire charges of machinery, including T&P and all lead of material from quarry (compacted thickness to be measured) Grading as per MoRTH specification : Table 400-1, 400-2 with
CBR value not less than 30.To achieve 95% Proctor density. | 21,000 | Cum | 313.5 | ₹65,83,500 |
| 7 | Earth work in excavation by mechanical means (Hydraulic excavator )/ manual means over areas (exceeding 30cm in depth. 1.5m in width as well as 10 sqm on plan) including disposal of excavated earth, lead upto 50m and lift upto 1.5 m , disposed earth to be levelled and neatly dressed : All kinds of soil | 2,760 | Cum | 175 | ₹4,83,000 |
| 8 | Providing and laying in position cement concrete including curing, compaction etc. complete in specified grade excluding the cost of centering and shuttering - All work up to plinth level. M10 grade Nominal Mix
1: 3: 6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20mm nominal size). | 1,935 | Cum | 3,847 | ₹74,43,945 |
| 9 | Providing and laying in position cement concrete including curing, compaction etc. complete in specified grade excluding the cost of centering and shuttering - All work up to plinth level. M20 grade Nominal Mix
1: 1.5: 3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20mm nominal size). | 905 | Cum | 4,915 | ₹44,48,075 |
| 10 | Random rubble dry stone Kharanja under floor. | 1,560 | Cum | 932 | ₹14,53,920 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.31 MB
bid01.pdf
Tender Documents • 10.07 MB
BOQ_999696.xls
BOQ • 0.30 MB
c1.pdf
PDF • 0.22 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .