| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹5.2 LAccepted-AOC | L-1 | Accepted-AOC Accepted and awarded | |
| 2 | L-2₹5.3 L+₹8,678.47 (1.67%)Rejected-Finance | L-2 | Rejected-Finance REJECTED AS L2 | |
| 3 | Rejected-Technical WARD NO 15 CINEMA ROAD DHANPURI MP 484114 | DHANPURI | SHAHDOL | MADHYA PRADESH | 484114 | - | Rejected-Technical TECHNIALLY REJECTED |
| Sl No | Description | Qty | Unit | VIKASH KUMAR VISHWAKARMA | MAHENDRA SINGH |
|---|---|---|---|---|---|
| 1.00Item Description/ Heading Part (A) labour Cost | |||||
| 1.01 | Cutting of Coal / Shale solid coal & shale by using chisel/pick-axe+Side dressing : 1Nos.X2X15X2.0X0.20-12.00m3,
In floor for side wall 01 nosX2 (15.56+5.00X0.30)X0.30 = 37.1 m3
,In floor – 1Nos.X15.6X0.50X0.30 = 23.40 m3. Total = 39.11 m3 | 39.11 | m3 | 63,749.3 ₹75,224.17 | 62,732.44 ₹74,024.28 Lowest |
| 1.02 | Reinforced cement concrete (1:2:4) in wall/roof ceiling of air crossing/shotcreting (any thickness) in UG including cost of materials, mixing, transportation, placing, bending, placing and blinding etc. (but excluding cost of RCC material) Wall: 01 nos (15.60+15.60+5.0+5.02.30X0.30) = 28.43 M3
in floor - 1Nos X (15X5.0X0.10) = 7.500 m3. Total = 35.93 M3 | 35.93 | m3 | 1,27,156.27 ₹1,50,044.4 | 1,25,072.33 ₹1,47,585.35 Lowest |
| 1.03 | Centering shuttering, binding and reinforcement of cement concrete wall & slab including cost of fixing, removing after completion of work
1Nos(2x15.0x2.00)=60.00m2
1nos(2x5.00x2.00)20.00m2 Total=80.00m2 | 80 | m2 | 54,320 ₹64,097.6 | 53,440 ₹63,059.2 Lowest |
| 1.04 | 6mm cement plaster (1:6)
wall1nos(2x15x2.00)60.00m2
1 nos(2x5.00x2=20m2
im floor1nos(15.00x5.00)75.00m2 Total155.00m2 | 155 | m2 | 38,285 ₹45,176.3 | 37,665 ₹44,444.7 Lowest |
| 1.05 | Transportation of all building materials in tub by manual pushing, coupling /uncoupling etc for a distance every 1.0 Km or part thereof and bringing empty tubs to surface. = 55.22 m3 Cement | 237 | bag | 1,185 ₹1,398.3 Lowest | 1,185 ₹1,398.3 Lowest |
| 1.06 | Sand+stone chip | 49.16 | m3 | 7,865.6 ₹9,281.41 | 7,718.12 ₹9,107.38 Lowest |
| 1.07 | steel rod(12mm) | 0.53 | te | 28.62 ₹33.77 Lowest | 28.62 ₹33.77 Lowest |
| 1.08 | Loading of all kind building materials in to tub at Inc mouth Cement | 237 | bag | 1,659 ₹1,957.62 Lowest | 1,659 ₹1,957.62 Lowest |
| 1.09 | Sand+ stone chips | 49.16 | m3 | 10,225.28 ₹12,065.83 | 10,077.8 ₹11,891.8 Lowest |
Tender Value
₹7.2 L
EMD Value
₹9,000
Closing Date
1 Sept 2025, 5:00 pmClosed
STAFF OFFICER (MINING), SOHAGPUR AREA, SECL
Staff Officer (Mining) SECL Sohagpur Area, PO- Dhanpuri, Distt- Shahdol (MP),Mobile No.- 9425533459
Construction of 01 nos UG water tank for filter water supply to LHCM at seam VIB at Rajedra UG Mine
2025_SECL_341774_1
SECL/SGP/SO(M)/et/35/25-26/710 dt19.08.25
Open Tender
Civil Works - Others
Item Rate
180 days
Rajendra UG Mine
As per NIT
9 documents required · 9 mandatory
₹9,000
8 Nov 2025
19 Aug 2025
2 Sept 2025
19 Aug 2025
1 Sept 2025
20 Aug 2025
19 Aug 2025 - 1 Sept 2025
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .