Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.1 LAccepted-AOC | ₹4.1 L | L1 | Accepted-AOC Low Price |
| 2 | L2₹4.1 LRejected-Finance | ₹4.1 L | L2 | Rejected-Finance High Price |
| Sl No | Description | Qty | Unit | BALAKRISHNAN L1 | Subashchandhraboss L2 |
|---|---|---|---|---|---|
| 1.00Construction of PVC Pipe Drainage at Chathiram Theru Karthic House to OHT in Kottaipattinam Panchayat | |||||
| 2.00 | Earth work exacavation and depositing on bank with initial lead and lift in cll clauses of soils such as as per S.S.20B for narrow foundation etc. complete | 204.12 | Cum | 263 ₹53,683.56 | 263.78 ₹53,842.77 |
| 3.00 | Supplying and Filling with M.Sand including cost and conveyance of all materials to site including all labour charges for filling etc complete | 0.97 | Cum | 2,320 ₹2,250.4 | 2,320.09 ₹2,250.49 |
| 4.00 | Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete | 1.46 | Cum | 6,118 ₹8,932.28 | 6,118.45 ₹8,932.94 |
| 5.00 | Cost and Supply of 180mm dia PVC 6 KSC Pipe including all Cost Charges etc Complete | 240 | Rm | 561 ₹1,34,640 | 561.6 ₹1,34,784 |
| 6.00 | Conveyance of the following rigd PVC pipes, lowering to trenches and laying to proper grade and alignment etc Complete | 240 | Rm | 43 ₹10,320 | 43.57 ₹10,456.8 |
| 7.00 | Supplying and errecting centering charges for sides and soffits of all R.c.c works including all labour charges etc complete | 103.2 | Sqm | 547 ₹56,450.4 | 547.5 ₹56,502 |
| 8.00 | Cement Concrete 1:2:4 mix using 20mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete | 6.48 | Cum | 7,417 ₹48,062.16 | 7,417.85 ₹48,067.67 |
| 9.00 | Supply and fabrication of steel reinforcement for concrete works including cost and conveyance of all materials to site and all labour charges etc., complete | 0.1 | Mt | 91,910 ₹9,099.09 | 91,910.02 ₹9,099.09 |
| 10.00 | Reinforced Cement concrete 1:1.5:3 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges etc., complete | 1.2 | Cum | 9,743 ₹11,691.6 | 9,743.13 ₹11,691.76 |
Tender Value
₹4.1 L
EMD Value
₹4,110
Closing Date
17 Feb 2026, 3:00 pmClosed
BDO (V.PT) (SPL OFFICER)
PT UNION OFFICE
Construction of PVC Pipe Drainage at Chathiram Theru Karthic House to OHT in Kottaipattinam Panchayat
2026_RDTN_653846_1
Panchayat G.Fund-Work (01) in Kottaipattianm Panchayat at Manamelkudi Block
Open Tender
Civil Works - Others
180 days
MANAMELKUDI
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹4,110
Yes
20 Feb 2026
10 Feb 2026
17 Feb 2026
10 Feb 2026
17 Feb 2026
10 Feb 2026
Construction of PVC Pipe Drainage at Chathiram Theru Karthic House to OHT in Kottaipattinam Panchayat
Earth work exacavation and depositing on bank with initial lead and lift in cll clauses of soils such as as per S.S.20B for narrow foundation etc. complete
Supplying and Filling with M.Sand including cost and conveyance of all materials to site including all labour charges for filling etc complete
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete
Cost and Supply of 180mm dia PVC 6 KSC Pipe including all Cost Charges etc Complete
Conveyance of the following rigd PVC pipes, lowering to trenches and laying to proper grade and alignment etc Complete
Supplying and errecting centering charges for sides and soffits of all R.c.c works including all labour charges etc complete
Cement Concrete 1:2:4 mix using 20mm HBG metal including cost and conveyance of all materials to site including all labour charges for filling etc complete
Supply and fabrication of steel reinforcement for concrete works including cost and conveyance of all materials to site and all labour charges etc., complete
Reinforced Cement concrete 1:1.5:3 mix using 20mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges etc., complete
Refilling with excavated earth including all labour charges etc complete
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package}(Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.53 MB
PRE_QUAL.pdf
Tender Documents • 0.48 MB
BOQ_784057.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid