| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.7 LAdmitted-Finance | ₹1.7 L | L1 | Admitted-Finance |
| 2 | L2₹1.8 L+₹16,124.50 (9.71%)Admitted-Finance | ₹1.8 L+₹16,124.50 (9.71%) | L2 | Admitted-Finance |
| 3 | Rejected-Technical | - | - | Rejected-Technical As per NIT |
| Sl No | Description | Qty | Unit | kundan kumar L2 | arun kumar tiwari L1 |
|---|---|---|---|---|---|
| 1.01 | Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in- charge. | 22.5 | cum | 1,000 ₹22,500 | 177 ₹3,982.5 Lowest |
| 1.02 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:3:6 (1 Cement: 3 coarse sand (zone-III) derived fromnatural sources : 6 graded stone aggregate 20 mm nominal
size derived from natural sources) | 3.6 | cum | 9,800 ₹35,280 | 7,000 ₹25,200 Lowest |
| 1.03 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size de rived from natural sources) | 5.4 | cum | 10,980 ₹59,292 | 8,500 ₹45,900 Lowest |
| 1.04 | Centering and shuttering including strutting, propping etc. and removal of form for foundation, footing base of column for mass concrete | 7.5 | sqmtr | 210 ₹1,575 Lowest | 392 ₹2,940 |
| 1.05 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more. | 300 | kg | 116 ₹34,800 | 107 ₹32,100 Lowest |
| 1.06 | Supplying and fixing of 13 mm thick Artificial Turf. The turf should be installed using Joining Tapes and Industrial Glue. The joints of the turf rolls should along the longer length of the field. The joining tapes should made out of non woven seaming fabric. The glue should be a mixture of an synthetic adhesive and a hardner.(Size 40ft X 10 ft) | 400 | sqfeet | 72 ₹28,800 Lowest | 140 ₹56,000 |
Tender Value
₹1.9 L
EMD Value
₹3,894
Closing Date
25 May 2026, 3:00 pmClosed
Registrar IIT Patna
2nd floor of Administrative building IIT Patna
Construction of Concrete cricket pitch with artificial turf at Kalam hostel ground of IIT Patna Campus
2026_IITP_908116_1
IITP/IWU/HZ/NIT/3/2026
Open Tender
Civil Works
Item Rate
30 days
Kalam hostel ground of IIT Patna
Please refer Tender documents.
6 documents required · 6 mandatory
₹0
₹3,894
6 Jul 2026
12 May 2026
26 May 2026
12 May 2026
25 May 2026
12 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in- charge. | - | cum | 100 | - |
| 1.02 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:3:6 (1 Cement: 3 coarse sand (zone-III) derived fromnatural sources : 6 graded stone aggregate 20 mm nominal
size derived from natural sources) | - | cum | 100 | - |
| 1.03 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size de rived from natural sources) | - | cum | 10 | - |
| 1.04 | Centering and shuttering including strutting, propping etc. and removal of form for foundation, footing base of column for mass concrete | - | sqmtr | 10 | - |
| 1.05 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more. | - | kg | 10 | - |
| 1.06 | Supplying and fixing of 13 mm thick Artificial Turf. The turf should be installed using Joining Tapes and Industrial Glue. The joints of the turf rolls should along the longer length of the field. The joining tapes should made out of non woven seaming fabric. The glue should be a mixture of an synthetic adhesive and a hardner.(Size 40ft X 10 ft) | - | sqfeet | 10 | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 14.06 MB
20260511173208.pdf
Tender Documents • 14.04 MB
BOQ_954629.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .