Loading…
Loading…
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹16.8 L
EMD Value
₹34,000
Closing Date
12 Oct 2026, 2:00 pm2d left
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Project Manager
T-96 Pallavpuram Phase II Meerut
Construction of Library at Rajkiya Inter College Kapsadh in Distt. Meerut
2026_UPPRC_1189107_2
08/PCL/PM-33/MRT/2026-27 Dt. 23.09.2026
Open Tender
Civil Works
Percentage
120 days
Kapsadh
Please refer Tender documents.
2 documents required · 2 mandatory
₹5,900
₹34,000
6 Oct 2026
6 Oct 2026
12 Oct 2026
6 Oct 2026
12 Oct 2026
6 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in foundations in ordinary soil (Loam clay or sand) including lift upto 1.5 m (5 fts.) and lead upto 30 mt. (100 fts.) & including filling, watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer-Incharges upto a distance of 30mt. (100 fts) from the foundation trenches. | - | CUM | 185.29 | - |
| - | Excavating, supplying, stacking and filling of local earth (including royalty) by mechanical transport upto a lead of 5km also including ramming and watering of the earth in layers not exceeding 20 cm in foundation trenches, plinth, sides of foundation etc. complete for all lift | 22.87 | CUM | 498.63 | ₹11,403.67 |
| - | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete.. | 9.5 | CUM | 1,511.74 | ₹14,361.53 |
| - | Providing and laying cement concrete 1:4:8 (1 cement :4 coarse sand :8 graded Stone aggregate 40 mm nominal size) including supply of all materials, labour T & P rtc required for proper completion of the work and curing complete also including cost of formwork in foundation & floors. | - | CUM | 4,848.94 | - |
| - | Providing and injecting chemical emulsion for preconstructional antitermite treatment and creating a chemical barrier under and around the column pits wall trenches basement excavation top surface if plinth filling junction of wall and floor, along the the external perimeter of binding expansion joints, surrounding of pipes and conduits etc, complete (plinth area of the building at ground. floor only shall be measured as per I.S.6313(PartII 1981)Alderine emulsifiable concentrate or any other approved material such as Heptrachlor or Chlordane will be used. The rate of application of chemical emulsion shall be as follows : (1)Treatment for masonary & foundation 5 liters per sqm. (2) Back fill in immediate contact with foundation 7.5 liters/sqm (3) Treatment of top surface of plinth filling 5 liters/sqm (4) Treatment of soil along external perimeter of building 7.5 liters/sqm. (5) Treatment of soil under apron along external perimter 5 liters/sqm. | 72.9 | SQM | 220.7 | ₹16,089.03 |
| - | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources). [Foundation] | 1.35 | CUM | 6,438.98 | ₹8,692.62 |
| - | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources). [FOR PLINTH BEAM] . | 1.43 | CUM | 8,189.88 | ₹11,711.53 |
| - | As above but for Lintel Bend using (1:1.5:3) mix concrete | 1 | CUM | 8,189.88 | ₹8,189.88 |
| - | As above but for Slab using (1:1.5:3) mix concrete | 9.94 | CUM | 8,189.88 | ₹81,407.41 |
| - | As above but for Beam using (1:1.5:3) mix concrete | 2.03 | CUM | 8,189.88 | ₹16,625.46 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.09 MB
TENDERDOCUMENT.pdf
Tender Documents • 3.30 MB
BOQ_2251834.xls
BOQ • 0.36 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .