| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.9 CrAccepted-AOC 00 AGRA AGRA UTTAR PRADESH 282001 | AGRA | UTTAR PRADESH | 282001 | ₹11.9 Cr Quoted ₹12.0 Cr | L1 | Accepted-AOC AOC |
| 2 | L2₹12.1 CrRejected-Finance HAJI CHAURAHA SHAMA VIHAR COLONY CHILLAWAN KANPUR ROAD SAROJINI NAGAR LUCKNOW UTTAR PRADESH | LUCKNOW | UTTAR PRADESH | 226001 | ₹12.1 Cr | L2 | Rejected-Finance Rejected Being Higher rates |
| 3 | L3₹12.4 CrRejected-Finance B 708 SECTOR C MAHANAGAR LUCKNOW | LUCKNOW | UTTAR PRADESH | 226001 | ₹12.4 Cr | L3 | Rejected-Finance Rejected Being Higher rates |
| 4 | L4₹12.7 CrRejected-Finance UTTAR PRADESH UP | GHAZIABAD | UTTAR PRADESH | 201001 | ₹12.7 Cr | L4 | Rejected-Finance Rejected Being Higher rates |
| 5 | L5₹13.3 CrRejected-Finance | ₹13.3 Cr | L5 | Rejected-Finance Rejected Being Higher rates |
Tender Value
₹18.6 Cr
EMD Value
₹30 L
Closing Date
27 Mar 2025, 12:00 pmClosed
SE Lucknow Circle PWD Lucknow
Office of SE Lucknow Circle PWD Lucknow
Widening and Strengthening of Etaunja-Shivpuri via Kathwara Maa Chandrika Devi Dham Marg IN Lucknow District
2025_CEUCZ_1020656_1
1595/523 C (PDL) Lko.Cir./2024-25 dated 22.02.2025
Open Tender
Civil Works - Roads
365 days
Lucknow
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,714
₹30 L
Office of SE Lucknow Circle PWD Lucknow
6 May 2025
22 Mar 2025
27 Mar 2025
22 Mar 2025
27 Mar 2025
22 Mar 2025
22 Mar 2025
Amount
Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness .
Excavation for road work in soil with hydraulic excavator of 0.90 cum bucket capacity including cutting trimming bottom and solpes in accordance with requirement of lines, grade and cross sections withhin all lifts and lead ( for widening of existing road)
Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2
Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401.
Wet Mix Macadam (Plant Mix Method)Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.
Providing ,Laying ,spreading and compacting stone aggregates of 53-22.4 mm size to water bound macadam specification including spreading in uniform thickness , hand packing ,rolling with Smooth wheel roller 80-100 KN in stages to proper grade and camber ,applying and brooming ,Stone screening to fill up the nterstices of coarse aggregate ,watering and compacting to the required density
Construction of plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days, using curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501
Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2.
Providing, laying and spreading of graded stone aggregate (WMM) after mixing with water at OMC in mechanical mix plant carriage of mixed material by tipper to site, laying with 1% OPC cement and 3.50% Emulsion in uniform single layer on sub base/subgrade and compacting with the road roller to achieve the desire density
Providing and applying tack coat with bitumen VG-10 using bitumen pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous surface cleaned with mechanical broom.
Providing and laying bituminious concrete with 100 TPH batch type hot mix plant producing an average output of 75 tonne per hour using crushed aggregates of specified grading, premixed with bituminous binder as per job mix, transporting the hot mix to work site,laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRT & H Specifications Clause 509 complete in all respects.
Construction of R.C.C. Drain as per Analysis Earth Work in excavation of foundation of structures as per drawing & technical
Plain Cement Concrete in 1 : 3 : 6 normal mix in foundation with crushed aggregate 40 mm nominal size mechanically mixed placed - For Drain
R.C.C. M-25 for Wall, Raft and Slab
Supplying fitting and placing HYSD bar reinforcement in S/S complete as per drawing and Technical Specifications clauses.
600 mm Hume pipe culvert Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work.
Laying reinforced cement concrement pipe for culverts on first class bedding of granular material in single row including fixing collar with cement motar 1:2 but excluding excavation,protection works,back filling,concrete and masonary works in head walls and parapets as per R Material Rate o 20.
Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
Brick Masonry Work in Cement Mortar 1:3 in Foundation complete excluding Pointing and Plastering, as per Drawing and Technical Specifications.
Pointing with cement mortar (1:3) on brickwork in sub structure & super structure as per drawing and technical specification. As per SOR Ch-25 SI No.-42
1000 mm Hume pipe culvert Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work.
Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
Laying reinforced cement concrement pipe for culverts on first class bedding of granular material in single row including fixing collar with cement motar 1:2 but excluding excavation,protection works,back filling,concrete and masonary works in head walls and parapets as per R Material Rate o 20.
Brick Masonry Work in Cement Mortar 1:3 in Foundation complete excluding Pointing and Plastering, as per Drawing and Technical Specifications.
Pointing with cement mortar (1:3) on brickwork in sub structure & super structure as per drawing and technical specification. As per SOR Ch-25 SI No.-42
Extension of existing RCC culvert 2.5 M span 7.0M to 10.0M
T-Junction Improvement of 3.75 M Wide Link Roads
T-Junction Improvement
A B ASSOCIATES (BID ID -5084014)
M/S SURYANSH INFRA DEVELOPERS PVT LTD (BID ID -5081155)
M/S S.K. ENTERPRISES (BID ID -5084170)
M/s Raj Laxmi Enterprises (BID ID -5083939)
M/s Ram Singh Agarwal (BID ID -5073796)
Crescent Infrastructure (BID ID -5083808)
PBC INFRASTRUCTURE INDIA PVT LTD (BID ID -5083855)
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid