| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹1.4 CrAccepted-Finance | ₹1.4 Cr | L-1 | Accepted-Finance L-1 |
| 2 | L-2₹1.4 Cr+₹6,289.15 (0.05%)Rejected-Finance VILLAGE AND POST PIPRA GAUTAM TEHSIL AND DISTRICT BASTI UTTAR PRADESH | GONDA | UTTAR PRADESH | 271305 | ₹1.4 Cr+₹6,289.15 (0.05%) | L-2 | Rejected-Finance L-2 |
| 3 | L-3₹1.4 Cr+₹4.9 L (3.62%)Rejected-Finance | ₹1.4 Cr+₹4.9 L (3.62%) | L-3 | Rejected-Finance L-3 |
| 4 | L-4₹1.5 Cr+₹13.4 L (9.81%)Rejected-Finance M0 NO 211 AWAS VIKAS COLONY POLICE STATION KOTWALI KATRA TEHSIL SADAR DISTRICT MIRZAPUR | ₹1.5 Cr+₹13.4 L (9.81%) | L-4 | Rejected-Finance L-4 |
| 5 | Rejected-Technical | - | - | Rejected-Technical Technical Bid not Qualified |
| Sl No | Description | Qty | Unit | M/S BADRI SINGH L4 | M/S ADITYA CONSTRUCTION COMPANY L2 | M/S RADHEY MOHAN DUBEY CONSTRUCTION L1 | M/S LALMANI MAURYA L3 |
|---|---|---|---|---|---|---|---|
| 1.00Earth work in excavation of foundation in all type of soil, soft rock and hard rock etc. including all cost of material labour charges T&P etc.required for proper completion of work. | |||||||
| 1.10 | (i) Soft rock/soil | 519.55 | m3 | 80 ₹41,564 | 100 ₹51,955 | 75 ₹38,966.25 Lowest | 80 ₹41,564 |
| 1.20 | (ii) Earth work in excavation Lime stone, sand stone or other soft rock | 313.5 | m3 | 120 ₹37,620 Lowest | 200 ₹62,700 | 160 ₹50,160 | 180 ₹56,430 |
| 2.00 | Laying C.C. 1:3:6 (M–10) in foundation with cement coarse sand FM not less than 2.0 and hard stone ballast of size 20 to 40 mm. including cost of all material, labour, T&p etc. required for proper completion of work. | 284.24 | m3 | 4,100 ₹11,65,375.8 | 4,000 ₹11,36,952 | 3,600 ₹10,23,256.8 | 3,500 ₹9,94,833 Lowest |
| 3.00 | Centering and shuttering for R.C.C. work. Including all cost of labour charges, T&P etc. required for proper completion of work.in structure. | 742.2 | m2 | 350 ₹2,59,770 | 500 ₹3,71,100 | 300 ₹2,22,660 Lowest | 450 ₹3,33,990 |
| 4.00 | Centering and shuttering for enclose filter in side of retaining wall.Including all cost of labour charges, T&P etc. required for proper completion of work. | 495 | m2 | 200 ₹99,000 | 70 ₹34,650 | 56 ₹27,720 | 50 ₹24,750 Lowest |
| 5.00 | Providing M-20 (1:1.5:3) R.C.C with 4.75mm to 20mm size graded hard stone grit and coarse sand by Mechanical mixing with all materials, labour, T&P etc. required for proper completion of work. | 488.1 | m3 | 6,800 ₹33,19,080 | 5,200 ₹25,38,120 Lowest | 6,600 ₹32,21,460 | 6,800 ₹33,19,080 |
| 6.00 | Cutting, Bending, Binding and placing of reinforcement. Including all cost of labour charges T&P etc. required for proper completion of work. | 57.47 | MT | 63,000 ₹36,20,610 | 65,000 ₹37,35,550 | 62,456 ₹35,89,346.32 Lowest | 65,000 ₹37,35,550 |
| 7.00 | P.V.C. Pipe in weep hole 75mm Ø. Including cutting, placing, all cost of labour charges T&P etc. required for proper completion of work. @2.50 m c/c in horizontal and @ 1.5 m c/c in vertical | 26.4 | RM | 90 ₹2,376 Lowest | 100 ₹2,640 | 98 ₹2,587.2 | 95 ₹2,508 |
| 8.00 | Providing and laying coarse sand in filter .including cost of all material labours and T&P etc.required for proper completion of work. | 24.75 | m3 | 1,600 ₹39,600 Lowest | 2,800 ₹69,300 | 2,500 ₹61,875 | 2,600 ₹64,350 |
Tender Value
Refer Docs
EMD Value
₹3.3 L
Closing Date
6 Aug 2026, 2:00 pmClosed
S.E. B.S.C.C.C.-2, Mzp
Office of Superintending Engineer, Bansagar Canal Construction Circle-2 Mirzapur
Protective works on both sides of the Super Passage constructed at Km 43.200 of the Meja Jirgo Link Canal, including strengthening of the canal banks.
2026_UPIDC_1172517_3
04/SE/2026-27
Open Tender
Civil Works
Item Rate
300 days
Mirzapur
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,360
₹3.3 L
20 Sept 2026
27 Jul 2026
6 Aug 2026
28 Jul 2026
6 Aug 2026
28 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Earth work in excavation of foundation in all type of soil, soft rock and hard rock etc. including all cost of material labour charges T&P etc.required for proper completion of work. | |||||
| 1.1 | (i) Soft rock/soil | 1 | m3 | - | - |
| 1.2 | (ii) Earth work in excavation Lime stone, sand stone or other soft rock | - | m3 | - | - |
| 2 | Laying C.C. 1:3:6 (M–10) in foundation with cement coarse sand FM not less than 2.0 and hard stone ballast of size 20 to 40 mm. including cost of all material, labour, T&p etc. required for proper completion of work. | 0.2 | m3 | - | - |
| 3Centering and shuttering for R.C.C. work. Including all cost of labour charges, T&P etc. required for proper completion of work.in structure. | |||||
| 4Centering and shuttering for enclose filter in side of retaining wall.Including all cost of labour charges, T&P etc. required for proper completion of work. | |||||
| 5Providing M-20 (1:1.5:3) R.C.C with 4.75mm to 20mm size graded hard stone grit and coarse sand by Mechanical mixing with all materials, labour, T&P etc. required for proper completion of work. | |||||
| 6 | Cutting, Bending, Binding and placing of reinforcement. Including all cost of labour charges T&P etc. required for proper completion of work. | 57.47 | MT | - | - |
| 7 | P.V.C. Pipe in weep hole 75mm Ø. Including cutting, placing, all cost of labour charges T&P etc. required for proper completion of work. @2.50 m c/c in horizontal and @ 1.5 m c/c in vertical | 1 | RM | - | - |
| 8Providing and laying coarse sand in filter .including cost of all material labours and T&P etc.required for proper completion of work. | |||||
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.20 MB
Tender_Document_Lot_3.pdf
Tender Documents • 5.01 MB
BOQ_2201893.xls
BOQ • 5.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .