| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.4 CrAdmitted-Finance | ₹5.4 Cr | L1 | Admitted-Finance |
| 2 | L2₹5.8 Cr+₹48.3 L (9.00%)Admitted-Finance | ₹5.8 Cr+₹48.3 L (9.00%) | L2 | Admitted-Finance |
| 3 | L3₹6.1 Cr+₹78.0 L (14.5%)Admitted-Finance | ₹6.1 Cr+₹78.0 L (14.5%) | L3 | Admitted-Finance |
| 4 | Rejected-Technical DUMKA | - | - | Rejected-Technical Non Responsive as per Cl. Section 2- 4.2(g) and Section-2- 4.2(a) |
| Sl No | Description | Qty | Unit | M/S ABC construction L3 | KARUNA KUMARI L2 | AJIT KUMAR DWIVEDI L1 |
|---|---|---|---|---|---|---|
| 1.00Details | ||||||
| 2.00 | (i) High Level Bridge on Local Nala in Reo-Road to Telul Tola Dumgo road at chainage 2+200, Length - 38.760m , Block - Littipara
FOUNDATION Excavation for Structures
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and
bottom and backfilling in trenches with excavated suitable material.(i) Upto 3m depth | 735.04 | Cum | 314.98 ₹2,31,522.9 | 299.59 ₹2,20,210.63 | 270.31 ₹1,98,688.66 Lowest |
| 3.00 | II) Hard Rock | 144.79 | Cum | 473.27 ₹68,524.76 | 450.14 ₹65,175.77 | 406.15 ₹58,806.46 Lowest |
| 4.00 | Filling annular space around footing in rock as per technical specification Clause 1203.4.3. II. PCC Grade M-15 (Levelling Course) | 30.83 | Cum | 5,075.61 ₹1,56,481.06 | 4,827.54 ₹1,48,833.06 | 4,355.83 ₹1,34,290.24 Lowest |
| 5.00 | Reinforced Cement Concrete (RCC M30) in Open
Foundation complete as per Drawing and Technical Specifications. In Open Foundation | 274.55 | Cum | 5,736.19 ₹15,74,870.96 | 5,455.84 ₹14,97,900.87 | 4,922.74 ₹13,51,538.27 Lowest |
| 6.00 | Supplying, fitting and placing HYSD bar reinforcement in foundation complete as per drawing and technical specifications Clauses 1000 and 1202 | 16.33 | MT | 90,243.77 ₹14,73,410.03 | 85,833.12 ₹14,01,397.35 | 77,446.25 ₹12,64,464.92 Lowest |
| 7.00 | Abutment & Pier Location | 30 | Ls | 2,388.75 ₹71,662.5 | 2,272 ₹68,160 | 2,050 ₹61,500 Lowest |
| 8.00 | SUBSTRACTURE Plain/reinforced cement concrete in substructure
complete as per drawings and technical specification clauses 802, 804, 805, 806, 807, 1202 ans 1204 (RCC M30) i) Upto 5m height | 170.86 | Cum | 5,764.67 ₹9,84,951.52 | 5,482.92 ₹9,36,811.71 | 4,947.17 ₹8,45,273.47 Lowest |
| 9.00 | ii) From 5m upfo 10m height | 35.89 | Cum | 5,891.08 ₹2,11,430.86 | 5,603.15 ₹2,01,097.05 | 5,055.66 ₹1,81,447.64 Lowest |
| 10.00 | Supplying, fitting and placing HYSD bar reinforcement (Fe 500) in substructrue complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202 | 25.83 | MT | 90,408.96 ₹23,35,444.25 | 85,990.23 ₹22,21,299.62 | 85,000 ₹21,95,720 Lowest |
Tender Value
₹6.4 Cr
EMD Value
₹13 L
Closing Date
12 Jun 2026, 5:00 pmClosed
ENGINEER IN CHIEF
3rd Floor, FFP Building, Dhurwa, Ranchi, Jharkhand 834002
Construction and Maintenance of Roads and LSBs
2026_CEJHR_147749_27
NIT-10_PMJANMAN-BRIDGE
Open Tender
Civil - Roads and Bridges
Item Rate
455 days
PAKUR
Please refer Tender documents.
5 documents required · 5 mandatory
₹10,000
₹13 L
18 Sept 2026
21 May 2026
12 Jun 2026
21 May 2026
12 Jun 2026
21 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Details | - | - | - | - |
| 2 | (i) High Level Bridge on Local Nala in Reo-Road to Telul Tola Dumgo road at chainage 2+200, Length - 38.760m , Block - Littipara
FOUNDATION Excavation for Structures
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and
bottom and backfilling in trenches with excavated suitable material.(i) Upto 3m depth | 1 | Cum | 329.65 | ₹329.32 |
| 3 | II) Hard Rock | 1 | Cum | 495.31 | ₹494.81 |
| 4 | Filling annular space around footing in rock as per technical specification Clause 1203.4.3. II. PCC Grade M-15 (Levelling Course) | 1 | Cum | 5,311.99 | ₹5,306.68 |
| 5 | Reinforced Cement Concrete (RCC M30) in Open
Foundation complete as per Drawing and Technical Specifications. In Open Foundation | - | Cum | 6,003.34 | - |
| 6 | Supplying, fitting and placing HYSD bar reinforcement in foundation complete as per drawing and technical specifications Clauses 1000 and 1202 | - | MT | 94,446.65 | - |
| 7 | Abutment & Pier Location | - | Ls | 2,500 | - |
| 8 | SUBSTRACTURE Plain/reinforced cement concrete in substructure
complete as per drawings and technical specification clauses 802, 804, 805, 806, 807, 1202 ans 1204 (RCC M30) i) Upto 5m height | - | Cum | 6,033.14 | - |
| 9 | ii) From 5m upfo 10m height | - | Cum | 6,165.44 | - |
| 10 | Supplying, fitting and placing HYSD bar reinforcement (Fe 500) in substructrue complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202 | - | MT | 94,619.53 | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 10.01 MB
BOQ_230683.xls
BOQ • 0.41 MB
JH-16-PMJANMAN-III-BR-PAK-03.pdf
Tender Documents • 12.49 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .