Loading…
Loading…
Updated dates
Tender Value
₹56.6 L
EMD Value
₹1.1 L
Closing Date
17 Jun 2026, 5:30 pm
Cheif Construciton Engineer
O/o the CCE RW Circle, Sunabeda
Road
2026_CERWI_148016_52
NCB-03/RWCSBD/2026-2027
Open Tender
Civil Works - Roads
180 days
Sunabeda
Please refer Tender documents.
4 documents required · 4 mandatory
₹10,000
₹1.1 L
O/o the CCE RW Circle, Sunabeda
29 May 2026
29 May 2026
18 Jun 2026
29 May 2026
17 Jun 2026
29 May 2026
29 May 2026 - 16 Jun 2026
15 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201. | 1,300 | Sqm | 8.63 | ₹11,219 | 1 |
| 2 | Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking theunserviceable material with all lifts and lead of 1000m as per clause202.1of MORD specification for Rural roads & as per direction of the Engineer-in-charge. | 11.25 | Cum | 662.19 | ₹7,449.64 | 2 |
| 3 | Construction of embankment with approved materials deposited at site from road way cutting and excavation from drain & foundation of other strutures graded & compacted to meet the requirement of Tables 300.1 & 300.2 as per clause no.301of MORD specification for Rural roads and as per direction of Engineer-In-Charge. | 126.64 | Cum | 50.46 | ₹6,390.46 | 3 |
| 4 | Excavation for road work in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, inaccordance with requirements of lines, grades and cross sections, and transporting to the embankement location with a lift of up to 1.5m and lead up to 1000m as per techincal specification clause 302.3 | 24 | Cum | 57.92 | ₹1,390.08 | 4 |
| 5 | Earth work in excavation for foundtion of structures upto 3 m depth as per drawing and technical specification Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material dressing of sides and bottom and backfilling in trenches excavated suitable material. | 180.92 | Cum | 457.98 | ₹82,857.74 | 5 |
| 6 | Construction of embankment with approved material obtained from borrow pit with lift up to 1.5 m transporting to sites, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 as per Clause 301.5 of MoRD specification for rural roads & as per direction of the Engineer-in-Charge. | 1,519.16 | Cum | 255.57 | ₹3,88,251.34 | 6 |
| 7 | Fine dressing and turfing including transportation by mechanical means with all leads and lifts and placing of turfs in position and ramming with thapies including watering and cost of labour and all materials etc. complete as per the direction of the Engineer-in-Charge. | 2,250 | Sqm | 31.76 | ₹71,460 | 7 |
| 8 | Providing and laying of Type-B(first class) bedding for laying of Hume Pipe on well compacted moorum or approved granular material as per MORD Technical Specification clause 1105(ii) and as per direction of the engineer-in-charge. | 3.34 | Cum | 1,052.42 | ₹3,515.08 | 8 |
| 9 | Providing laying spreading & compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on well prepared sub-base and compacting with smooth wheel roller of 80 to 100kn weight to achieve the desired density including lighting, barricading and maintainance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406 . | 186.47 | Cum | 2,160.21 | ₹4,02,806.99 | 9 |
| 10 | Construction of granular sub-base by providing well graded material, spreading in uniform layers with ordinary motor grader on prepared surface, mixing by mix in place method with rotavator at OMC and compacting with smooth wheel roller to achieve the desired density and C.B.R>20, complete as per Technical specification clause 402 of MORD specification for Rural Road and direction of the Engineer-in-Charge. | 300.77 | Cum | 2,104.08 | ₹6,32,841.62 | 10 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.98 MB
Tendernotice_2.pdf
PDF • 3.13 MB
Tendernotice_3.pdf
PDF • 0.79 MB
BOQ_231143.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid